I have 3 tables: A B and C. I scheduled a daily query on A with results appended to B. And I wanna scheduled another daily query on B, the query should run after the previous one had completed. How can I do it? The Big Query can only schedule query at Fix Time.
When the first query has finished, the second query should be trigger and run.

Bigquery is a data warehouse and does not support triggers unfortunately.
I have not used this as just leave 30 mins between scheduled queries but Google cloud appears to offer a solution
https://cloud.google.com/blog/topics/developers-practitioners/how-trigger-cloud-run-actions-bigquery-events

Related

Run a Big Query Schedule everytime a table is updated

So I have this schedule that gets data from some tables and aggregate then into a single table, that I use as a source in a data studio dash, one of these tables (table 1), is updated daily, sometimes more than once, I wanted to know if there is a way to automatically run the schedule every time this table (table1) is updated.
Unfortunately, BigQuery scheduled queries need the parameters of run_time and run_date, so if you want this to be only with BigQuery, you can schedule multiple queries at different times.
Additionally, using a trigger in BigQuery is not possible because this is unsupported.
I recommend you to use a Cloud Run Action that gets the event after any Insert and this creates an event Trigger, so this could do what you are looking for, but without any scheduled queries.

SSIS Incremental Load-15 mins

I have 2 tables. The source table being from a linked server and destination table being from the other server.
I want my data load to happen in the following manner:
Everyday at night I have scheduled a job to do a full dump i.e. truncate the table and load all the data from the source to the destination.
Every 15 minutes to do incremental load as data gets ingested into the source on second basis. I need to replicate the same on the destination too.
For incremental load as of now I have created scripts which are stored in a stored procedure but for future purposes we would like to implement SSIS for this case.
The scripts run in the below manner:
I have an Inserted_Date column, on the basis of this column I take the max of that column and delete all the rows that are greater than or equal to the Max(Inserted_Date) and insert all the similar values from the source to the destination. This job runs evert 15 minutes.
How to implement similar scenario in SSIS?
I have worked on SSIS using the lookup and conditional split using ID columns, but these tables I am working with have a lot of rows so lookup takes up a lot of the time and this is not the right solution to be implemented for my scenario.
Is there any way I can get Max(Inserted_Date) logic into SSIS solution too. My end goal is to remove the approach using scripts and replicate the same approach using SSIS.
Here is the general Control Flow:
There's plenty to go on here, but you may need to learn how to set variables from an Execute SQL and so on.

Insert bigquery query result to mysql

In one of my PHP application, I need to show a report based on the aggregate data, which is fetched from BigQuery. I am planning to execute the queries using a PHP cron job then insert data to MySQL table from which the report will fetch data. Is there any better way of doing this like directly insert the data to MySQL without an application layer in between ?
Also I am interested in real time data, but the daily cron only update data once and there will be some mismatch of the counts with actual data if I check it after some time. If I run hourly cron jobs, I am afraid the data reading charges will be high as I am processing a dataset which is 20GB. Also my report cannot be fetched fro Bigquery itself and it needs to have data from MySQL database.

Check scheduled job status in SAP BODS

I am new to BODS, At present I have configured a job to execute every 2 mins to perform transaction from MySQL server and Load into HANA tables.
But sometimes when the data volume in MySQL is too large to transform and load into HANA within 2 Mins, the job is still executing my next iteration for the same job starts which results in BODS failure.
My question is: is there is any option BODS to check for the execution status of the scheduled JOB between runs?
Please help me out with this.
You can create a control/audit table to keep history of each run of bods job. The table should contain fields like eExtractionStart, ExtractionEnd, EndTime etc. And you need to make a change in the job, so that it reads status of previous run from this table before starting the load to Hana data flow. If previous run has not finished, the job can raise an exception.
Let me know if this has been helpful or if you need more information.

Oracle table -Find the job in scheduler

I have a table in oracle which is filled with data from an excel sheet on daily basis. I heard from a colleague that some job in the oracle scheduler has been running dail to update the table. Is there any way to find the exact job?
Thanks in advance
What you can do is to get a list of all scheduled jobs in Oracle using the below query. After that, you would have to check the jobs individually to figure out which job is updating your table.
SELECT *
FROM DBA_SCHEDULER_JOBS;