Karate - Is there a way to display custom logo in the karate test report? [duplicate] - karate

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 2 years ago.
Improve this question
For e.g if there is a feature file and if all of the steps are executed successfully then in the report I want to show the status as Pass. I don't want to show the status of each step in the report.
Is there any way to achieve the same

No there isn't. You can ignore the report and use the Results class as described here: https://stackoverflow.com/a/63351980/143475
EDIT: also refer this on how to write custom reports by hand: https://stackoverflow.com/a/66773839/143475

Related

How to Generate an Excel Report from TestRunner class in cucumber (like HTML report) [duplicate]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 2 years ago.
Improve this question
For e.g if there is a feature file and if all of the steps are executed successfully then in the report I want to show the status as Pass. I don't want to show the status of each step in the report.
Is there any way to achieve the same
No there isn't. You can ignore the report and use the Results class as described here: https://stackoverflow.com/a/63351980/143475
EDIT: also refer this on how to write custom reports by hand: https://stackoverflow.com/a/66773839/143475

<Selenium>Customize cucumber reporting with addition of Graphs (In addition to default graph) [duplicate]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 2 years ago.
Improve this question
For e.g if there is a feature file and if all of the steps are executed successfully then in the report I want to show the status as Pass. I don't want to show the status of each step in the report.
Is there any way to achieve the same
No there isn't. You can ignore the report and use the Results class as described here: https://stackoverflow.com/a/63351980/143475
EDIT: also refer this on how to write custom reports by hand: https://stackoverflow.com/a/66773839/143475

MySQL database insertion with karate [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 3 years ago.
Improve this question
In the karate project I am trying I have used karate's ability to assert database entries. And I was looking for a way to insert SQL scripts as a 'given' inside the test rather than calling a java class. Did not see any example in the demo project of karate.
What would be the ideal way to do this?
If you have already seen the JDBC demo and still feel that is too complicated, then I'm sorry - look for another framework :)
Also see this example if it helps: https://twitter.com/KarateDSL/status/1144458169822806016
And the whole Given When Then approach is over-rated, see: https://stackoverflow.com/a/47799207/143475

Emailing about Code freeze [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I need to notify my team about the approaching code freeze, So what all details should be mentioned in the mail? I want to prepare a standard template.
Thanks in advance
I usually mention the following items:
Code freeze date (date/time of last commit).
Name of the branch that'll be used for the freeze.
Grace period length for critical in-progress issue.
What release/build is this for.
Feature set of such release.

on what bases tester will write test cases? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 9 years ago.
Improve this question
Basing on what documents the test engineer will prepare test cases, directly from the requirement document or any other document. I heard that senior test engineer will prepare test scenarios based on requirement document, from test scenarios test engineer will prepare the test cases, is this the correct procedure or not please clarify me.
Thanks
Normally The flow is -
Use Case -> Functional Requirement Specification -> Test Scenario -> Test Conditions.
Now it depends on your company how particular they are in following this process.