How far back does Intellij's local history go back? - intellij-idea

I use JetBrains intellij for JavaScript NodeJS development.
I was trying to find some code I haven't committed in Git but have overwritten since couple of weeks ago. How far back and how much detail is Intellij's local history?
Can I find this change ever again?

The retention period for local history varies according to the version of IntelliJ.
For example in 2017.x and in 2016.x:
Local history is cleared when you install a new version of IntelliJ IDEA or when you invalidate caches. Therefore, check in the changes to your version control system before performing these operations.
But in 2018.x (see the section titled Retention period for Local History):
By default, Local History is configured to store revisions for the last 5 working days (that is, days when the file was modified).
The 2018.x link includes instructions on how to extend the default retention period including this suggestion:
You can change the default period of how many days local history will be kept for
See also: https://stackoverflow.com/a/11829639/2000323

Related

New artifact version is not listed after publishing to Maven Central

We recently published a new version of existing artifacts. The version shows up if I explicitly type the version number in the URL.
https://mvnrepository.com/artifact/com.microsoft.azure.functions/azure-functions-java-library-rabbitmq/2.0.0-preview
https://search.maven.org/artifact/com.microsoft.azure.functions/azure-functions-java-library-rabbitmq/2.0.0-preview/jar
But they are not listed on the artifact page.
https://mvnrepository.com/artifact/com.microsoft.azure.functions/azure-functions-java-library-rabbitmq
https://search.maven.org/artifact/com.microsoft.azure.functions/azure-functions-java-library-rabbitmq
Is this is an issue with naming of the version or change in some other properties (I made quite a few) in the POM file?
It seems to take a few days before the new version gets listed. It would be good to know the reason for this delay. mvnrepository.com now shows 2.0.0-preview version. I expect search.maven.org to also show it in a couple of days.
Publication takes around 30 minutes, while the search engine might take several hours to be updated.
Quoting from the Central repository guide:
Upon release, your component will be published to Central: this typically occurs within 30 minutes, though updates to search can take up to four hours.

Accurev: Restore workspace to older version

I'm a brand new to Accurev and I'm having many troubles with it. One of the developers I'm working with has promoted bad code (things are now broken that weren't before) for 2 months on a stream, and I'm wanting to get a copy of the original code before any changes were made to it.
I currently have a workspace, and whenever the other developer creates code, I pull his changes into this workspace attempting to fix the bugs. These changes are promoted to an existing issue within Accurev.
Is there any way I can perhaps create a second workspace and obtain a copy of the original code (before any changes were made)? My target date is March 14th.
I would suggest you revert or demote the bad code that was promoted into the stream (Depending on what version of AccuRev you are using). This would put the stream back into the state it was before the promotion occurred.
Below are some suggested readings on the related topics.
Best way to "un-promote" files in Accurev?
https://community.microfocus.com/borland/managetrack/accurev/w/wiki/26745/purge-revert-and-demote
https://community.microfocus.com/borland/managetrack/accurev/w/accurev_knowledge_base/25951/how-to-revert-changes-in-a-stream
https://community.microfocus.com/borland/managetrack/accurev/w/accurev_knowledge_base/26079/what-is-the-proper-way-to-revert-by-change-package
As an alternative, you could create a time-based stream below the one with the bad code. Set a time basis that predates the bad promote.
To do this, I right-clicked the stream >> New Snapshot.
I select "Specified" and enter the date (with a relative time).
From the Snapshot, I created a New Workspace which was then populated with previous code.
Hope this helps!

Get back lost shelf changes

I have shelved my 26 java files changes via Intellij Idea 2016.2.1 and I checkout to different branch.
When I came to old branch to check my shelved changes.
I gone a mad now, I lost all the files. I was worked nearly two months
Can somebody help to get it back?
You can restore the state of those files if they were edited in IntelliJ. Use local history to see all the changes made in IntelliJ (VCS -> Local History -> Show History).
Even there isn't Shelf tab in IDE you can find shelved changes as patch files at {ProjectName}/.idea/.idea.{ProjectName}/shelf/.idea/shelf.
Then your can apply any selected patch.
I was able to view lost changes and revert back to them by:
right click on project directory, select Local History > Show History
Find the entry in the history menu that you want to restore. You can examine the files by double clicking on the entry and the files to examine differences.
Right click on the entry you want to restore, and select Revert
Note in my case Git>VCS Operations>Show History showed nothing. Only through the Project Files menu.
Andrei's answer was helpful for my situation where I renamed my project and my previously shelved changes were no longer found under the shelf, but I did run into an issue when applying the patch file because I was prompted to "Select missing base" for various files in the patch. Similar to what is seen in the screenshot below:
https://youtrack.jetbrains.com/issue/IDEA-183910
I was able to avoid having to "Select missing base" for various files by first changing the default shelf location and then applying the patch.
https://www.jetbrains.com/help/idea/shelving-and-unshelving-changes.html#change-shelve-location
Also, I found my patch in this location:
{ProjectName}/.idea/shelf
instead of the aforementioned location:
{ProjectName}/.idea/.idea.{ProjectName}/shelf/.idea/shelf
Maybe this will help someone:
I lost part of my shelved changes in combination with an update of IntelliJ. I'm not sure if the update was the reason but eventually most of my most recent (and important) changes were gone.
I couldn't restore them from local history as this does not "survive" an update of IDEA. But in the files I saw that there still is some data:
C:\Users\myUser\AppData\Local\JetBrains\IntelliJIdea2021.2\LocalHistory had a changes.storageData with ~50MB.
Copying the files to the folder of the new version didn't help as the files got overwritten again.
Solution:
I was able to get the old version of IntelliJ (2021.2) here and installed it. This can be done in parallel, without removing the newer version.
Here I was able to retrieve my changes from the Local History and shelve or apply them again.
Hint: Backup the "Local History" folder (or the whole IntelliJIdea20xx.x folder) before you start. I don't remember if I had to copy it in there again or if it worked out of the box. (Just to be sure the local history doesn't get lost).
I've also experienced this bug repeatedly and hence no longer use shelved changes, but rather the Git CLI directly. As of 2022 Jetbrains IDE's still cannot be trusted with their "Smart Checkout" feature, which has a small probability of the total loss of your files (experienced personally in both IntelliJ & Rider).
Unlike another comment here regarding using the Local History, this did not work for me as the history showed nothing. I've also lost many hours of work due to this bug which remains unfixed.
The solution is to use "git stash -u" on the command line, then checkout the desired commit. Once youre done, type "git stash apply" to restore your files. Trusting the "smart checkout" feature is like playing Russian roullette. It's IDE magic that may just fail and you lose everything.

Accurev - why not Auto-Update?

Why isn't it standard behavior for Accurev to automatically run an "Update" upon opening the program? "Update" updates a user's local sandbox with the latest files from the building/promoted area.
It seems like expected functionality that the most recent files should be synchronized first.
I'm not claiming that it should always update, but curious as to why an auto-Update wouldn't be correct.
Auto-updating could produce some very unwanted results.
Take this scenario: you're in the middle of a development task, but you've made a mistake and need to revert a file that you just modified. So you open AccuRev, but before you have a chance to "revert to most recent version", you are bombarded with 100 files that have been changed upstream including the one you want to revert. You are now forced into the position of resolving all the merge conflicts before your solution will build, including the merge of your (possibly unstable) code in progress.
Requiring the user to manually update keeps a protective 'bubble' around the developer, allowing them to commit (keep) changes within their own workspace without bringing down code changes that could destabilise the work in their sandbox. When the developer gets to a point where his code is ready to share with others, that is the appropriate time to do an update and subsequently build/retest the merged codebase before promoting.
However there is one scenario that I do believe auto-updating could be useful: after a workspace is reparented. i.e. when a developer's workspace is moved from one part of the stream hierarchy to another. Every time we reparent we have to do a little dance:
Accept the confirmation dialog that reminds us (rather verbosely) that we need to update our workspace before we can promote any changes.
Double-click the workspace to view its files.
Wait for AccuRev to do a "Pending" search, to determine whether any file changes are waiting to be committed.
And finally, perform the Update.
Instead of just giving us a confirmation dialog, it would be nice if AccuRev could just ask us if we want to Update immediately.
I guess it depends on preference. I for one wouldn't like the auto-update feature.
Imagine you have a huge project and you don't want to build it every time you start Accurev. But you also can't debug because the source files and debugging info no longer correspond.

Finding which files were "FIXED"and how many times between two specific date by using Trac?

I need to find out that how many times and which files are fixed or changed due to a bug between two specific dates in an open source project which uses Trac. I selected Webkit project for that purpose. (https://trac.webkit.org/) However, it can be any open source project.
What can I do for that? How do I start? Do i have to use version control systems like svn or git for intergration? I am kinda newbie for these bug-tracking and issue-tracking systems.
I'm not certain I exactly understand your question, but...
If you browse to the directory containing the files you care about in the Trac site, then click on Revision Log, you will get a list of changesets that affected that directory. You can select the revisions that span the timeframe of interest and then View changes and you will get a summary of the changes, and depending on the size of the changes and the particular Trac configuration, you may get the diffs on that page as well.
Now, that won't tell you how many times those files were changed, just the net changes.
It also won't tell you which bugs those changes were for.
If you really need to filter on what bug, you'll have to determine how that information is tracked by the particular project; and some might not track it directly. The project might include a #123 in the commit message. If you can rely on that, you could use svn log --xml {2009-11-01}:{2009-12-01} ... to get an xml version of the commit log which you could then parse and filter based on the presence of the bug's ticket number in the commit message. From that, you should have a list of the revisions that you care about.