I’m new to Pentaho and I’m currently having an issue with mapping specific row values to an ID.
I have a data file with around 30 columns, one of which is for currencies (USD, GBP, AUD, etc).
The main objective is to have the user select up to 8 (minimum of 1) currencies and map them to a corresponding ID 1-8. All other currencies not in the specified 8 will be mapped with an ID of 9.
The final step is to then output the original data set, along with the IDs.
I’m pretty sure I’m making this way harder than it should, but here is what I have at the moment.
I have created a job where the first step is to set the variables for my 8 currencies, selectionOne -> AUD, selectionTwo -> GBP, …, selectionEight -> JPY.
I then have a transformation to read the data from the file and use the copy rows to result step.
Following that I have a second job called for-each which is my loop for checking the current currency in the row.
Within this job I have two transformations, one called set-current, one called map-currencies.
set-current simply uses the get rows from result step (to grab the data from the first transformation). I then use the set variable step to set the current currency to the value in currency field. This works fine, as each pass through in the loop changes the current variable to the correct value.
Map-currencies is where I’m having the most issues.
The goal is to use the filter row step to compare the current currency against the original 8 selected currencies, and then using the value mapper step to map it to an ID, before outputting the csv file.
The main issue here, is that I can’t use my original variables in the filter or value mapper.
So, what I’ve done here is use the get variables step to retrieve the variables and named them: one, two, three, …, eight. This allows me to bypass the filtering issue, but they don’t seem to work for the value mapper, which is the all important step.
The second issue is that when the file is output it only outputs one value (because of the loop), selecting the append option works, but this could be a problem if the job is run more than once.
However, the priority here is the mapping issue.
I understand that this is rather long, and perhaps a tad confusing, but I will greatly appreciate any help on this, even if it’s an entirely new approach 😊.
Like I said, I’m probably making it harder than it should be.
Thanks for your time.
Edit for AlainD
Input example
Output example

This should be doable in a single transformation using the Stream Lookup step.
Text File Input is your main file, Property input reads your property file into Key and Value columns. You could use a normal text file with two columns instead of the property input.
Below are the settings of the Stream lookup. Note the default value "9" for records that are not found in the lookup stream.

Related

Pentaho compare values from table to a number from REST api

I need to make a dimension for a datawarehouse using pentaho.
I need to compare a number in a table with the number I get from a REST call.
If the number is not in the table, I need to set it to a default (999). I was thinking to use table input step with a select statement, and a javascript step that if the result is null to set it to 999. The problem is if there is no result, there is nothing passed through. How can this be done? Another idea was to get all values from that table and somehow convert it to something so I can read id as an array in javascript. I'm very new to pentaho DI but I've did some research but couldn't find what I was looking for. Anyone know how to solve this? If you need information, or want to see my transformation let me know!
Steps something like this:
Load number from api
Get Numbers from table
A) If number not in table -> set number to value 999
B) If number is in table -> do nothing
Continue with transformation with that number
I have this atm:
But the problem is if the number is not in the table, it returns nothing. I was trying to check in javascript if number = null or 0 then set it to 999.
Thanks in advance!
Replace the Input rain-type table by a lookup stream.
You read the main input with a rest, and the dimension table with an Input table, then make a Stream Lookup in which you specify that the lookup step is the dimension input table. In this step you can also specify a default value of 999.
The lookup stream works like this: for each row coming in from the main stream, the steps looks if it exists in the reference step and adds the reference fields to the row. So there is always one and exactly one passing by.

Passing data from one Pentaho transformation to another in a job?

Fairly straightforward question I think, I just haven't been able to find a clear example. I have a very complex transformation that I'm breaking down into a job. Having never created a job before, I'm struggling to send the data from one transformation to another. I used Copy Rows to Result in the first one and Get Rows From Result in the second one, but I feel like I'm still missing something. When I used Get Rows, I had to specify the row names - there was no sort of Get Fields button. I also can't preview the data in the transformation without running the job and having it save to an Excel file. When I did that, ALL of the fields were in the output file -- instead of just the ones I'd specified in the second transformation.
I've searched through the documentation and tried Googling but I can't find a clear walkthrough just on how to smoothly move data from one transformation to another. Any responses would be appreciated even if it's just pointing me towards something I've overlooked.
Thanks!
The most commom way is to use copy rows to result at the end of one KTR and use get rows from result as the starting point for the next one. Though you really can't "see" the result while operating in the next KTR, what you can do to ease the reading is set a preview window and leave it open to see all the columns names and data.
Whoever if you want to set just a few lines of code through to the next KTR you can use Set variables as the ending step of the first KTR and capture those variables at anytime in the second using Get Variables steps. Don't forget that if you do so you need to set the variables in the parent KJB(the Job that called the first KTR) with no Default value, and the Variable scope type of the Set variables step has to be set to Valid in the parent job.
The best way is to create KTR's, run/test each. This way you can examine resulting data and then integrate all individual transformations into the final job.

Pentaho - Having multiple Copy rows to result results in Get rows from result empty

I'm trying to process some data and store it in a datawarehouse. For doing it, I wanted to store dimensions in one transformation and fact (only have one) in another transformation. So I can use a job for execute the first one, copy rows to result and get them into the second transformation.
In the first transformation, I read some Excel file and separate this data into some streams. It is data from a baptism, so I have one stream for the person, another one for parents, another one for sponsors, and so on... At the end of each stream, I insert data into database and return PK autogenerated (it is an id autoincrement).
In the second one, I only have Get rows from result and want to set them into a txt file (just for see it is been done correctly). The problem is that the file is created but it is empty. I suppose that if I let fields in Get rows from result empty, it gets all fields.
What am I doing wrong?
At the end what I want is to have one Copy rows to result at the end of each stream in the first transformation and get all this data in the second one.
In "Insert Pare Padrina" I return id_pare_padrina which is autogenerated, and the same with "Insert Mare Padrina" (I have more streams which I also have to include them into result). This transformation is not executed per row because I need values of other rows.
Thank you!
In order to pass the data from the first transformation to the second transformation, you need to set certain parameters like:
1. First of all, in the transformation settings of the second transformation (at the Job Level), check on the items as image below:
Copy Previous results to parameters will ensure that all the results/data in the "Copy Rows to Result" step is getting properly passed to the next level.
Execute for every input row : will execute the second transformation for every rows in the first transformation file. This is optional based on your requirement.
2. In the same transformation settings, define the "Parameters" in the Parameters tabs. Check the image below:
Here, NAME is the parameter i have defined. So when you are using the "Get rows from result", you can define these parameter names.
3. Instead of using "Get rows from result", you can alternately use "Get Variables" step to fetch all the variables coming from the previous step. All you need to do is to define the parameter names inside the ktr file (CTRL + T). (Actually i have practically implemented in that fashion and it worked for me.)
4. Since "copy rows to result" step uses heap memory, defining multiple instances of this step might exhaust the memory space quickly and your code might fall in trouble. Ideally use a single instance of this step.
But if your data interation is only one row, best option would be to use "set variables" step.
I assume you might have missed some of these sections in the job.
You can read more on copy rows to result in here.
Hope it helps :)

Adding two extra columns to input data - Pentaho Kettle

I am working on a transformation step for Pentaho Kettle. It selects several input columns and based on that adds two new columns during transformation. I am unable to understand (based on code from other plugins), how I can add the two new columns so that 1) steps downstream are aware of these columns and 2) i can push the transformed data into these columns.
Thanks in advance.
You might need to override meta.getStepFields() to add new ValueMetaInterface objects to the RowMetaInterface passed in. This is the standard way to add columns at runtime; however, the row's metadata (i.e. list of ValueMetaInterface objects) must be the same from row to row or else the next step in your transformation will complain.
Often when doing data-driven custom plugins, you consume as many rows as you need (using getRow()) in order to figure out what the outgoing row format/metadata will be, then you can construct a RowMetaInterface (usually using meta.getStepFields()) that will be passed into the putRow() call. If you intend to pass through the incoming fields, do something like:
RowMetaInterface outputRowMeta = getInputRowMeta().clone();
If you're creating new rows use this:
RowMetaInterface outputRowMeta = new RowMeta();
Either way when you call meta.getStepFields(outputRowMeta, ...) it should populate outputRowMeta with the appropriate fields, by adding/changing/removing ValueMetaInterface objects from outputRowMeta.
I've got a blog post using Groovy to add/replace fields in the incoming rows here:
http://funpdi.blogspot.com/2014/10/flatten-json-to-key-value-pairs-in-pdi.html
Not sure if that is similar to your use case or not. If you have more questions, feel free to find me on IRC at ##pentaho (my nick is usually mburgess_pdi)
IF i have understood your question correctly, i think you are trying to create an output file with dynamic column. So you can do this by checking on the "fast dumping" option in Text File Output Step. While doing so , donot define any column names in the "Fields" tab
Check my image below:
Hope it helps :)

Pentaho PDI how to validate source Excel metadata for the order and number of columns?

In my case, I need to process input data in Excel (xls and xlsx) format. I need to do a file level validation of the Excel file for the order and number of columns, before processing the row level data. If this file level validation is failed, then exclude this file and inform the concerned through mail.
Please guide me, with some sample or example, how to validate the excel files for metadata? I thought of placing a variable in kettle.properties with semicolon separated header fields and compare this with the source excel file. But not getting a way to extract only the header row from file as I want.
Please guide me.
Are column names on Row 1 of your file (or any other row reasonably close to row 1) and you know how many fields are in each, at most? If so, maybe you can get away with that.
Step 1: You need to understand how many rows may there be, what they may be called, what data types, etc.
Step 2: Read the first N rows of the file(s) ensuring the header row will be read; Filter everything that is not the header (how to? depends on the specific structure). Because you don't know what are the field names, just name them field0, ... field999 or whatever.
Step3: Work some magic on the headers; filtering based on position of certain fields, mapping field names to data types, etc.
Step4: Metadata injection. Using the information you already have from before, you create a template transformation that is generic in the sense that field names are not set up in the excel input step. The metadata injection allows you to set up that step in run time, depending on the entire logic you just applied on the headers.
This page has a couple example videos: http://wiki.pentaho.com/display/EAI/ETL+Metadata+Injection
I had to build something like that (only it was CSV files and not XLS) a while back and metadata injection allowed me to load every single file in one go with 100% mapping accuracy. Of course, the magic happens before, when you parse the header row.
Thanks nsousa for your answer.
I got to the required solution with the help of my colleague. Here what I did
(1) Read only the 1st row of the source Excel file as normal data (no header, limit 1) where the field names will be called as F1, F2 etc
(2) concat the fields (data) to get a pattern
(3) Match this pattern with acual metadata pattern, if they are matching, then excel file is passed
Good trick. Thanks.