Pentaho multi table input multi table output - migration

Question in regard of Pentaho Spoon (Data Integration):
How can I transfer the input of multiple tables from one database to multiple tables in another database? Basically a 1:1 data migration with creating the tables automatically in the target database.
I basically want to multiply the following transfomation: Picture of table transformation

Try the Copy Tables wizard, under the tools menu.
To use it, you will need to create a new transformation and define both database connections that you want to use.

Related

Power BI Direct query mode - handle multiple tables

I have a azure sql db where all tables sit - fact, dimension other lookups. Have a requirement to pull(3 tables) a fact table, a dimension and another lookup table(not part of star schema) via direct query and be part of data model within Power BI.
Direct query doesn't allow more than one table to query against(from a single source).
Any thoughts/suggestions?
Sorry.. thanks to Jon's response, it triggered me to look further and I have found that for each table(from same source) I have to go through 'get data' process.
Initially, I thought via one 'get data' process I could multi select tables, but, obviously not.
All ok here now.
I tried with mysql db, I able to select multiple tables and load once to power bi.
New Source -> Database -> Mysql Database -> Add host and password ----> then you retrieve window with table list --> it views tables, views , procedures etc....

Checking of replicated data Pentaho

I have about 100 tables to which we replicate data, e.g. from the Oracle database.
I would like to quickly check that the data replicated to the tables in db2 is the same as in the source system.
Does anyone have a way to do this? I can create 100 transformations, but that's monotonous and time consuming. I would prefer to process this in a loop.
I thought I would keep the queries in a table and reach into it for records.
I read the data from Table input (sql_db2, sql_source, table_name) and write do copy rows to result. Next I read single record and I read a single record and put it into a loop.
But here came a problem because I don't know how to dynamically compare the data for the tables. Each table has different columns and here I have a problem.
I don't know if this is also possible?
You can inject metadata (in this case your metadata would be the column and table names) to a lot of steps in Pentaho, you create a transformation to collect the metadata to inject to another transformation that has only the steps and some basic information, but the bulk of the information of the columns affected by the different steps is in the transformation injecting the metadata.
Check Pentaho official documentation about Metadata Injection (MDI) and the sample with a basic example of metadata injection available in your PDI installation.

How can I copy and overwrite data of tables from database1 to database2 in SQL Server

I have a database1 which has more than 500 tables and I have database2 which also has the same number of tables and in both the databases the name of tables are same.. some of the tables have different table definitions, for example a table reports in database1 has 9 columns and the table reports in database2 has 10.
I want to copy all the data from database1 to database2 and it should overwrite the same data and append the columns if structure does not match. I have tried the import export wizard in SQL Server 2008 but it gives an error when it comes to the last step of copying rows. I don't have the screen shot of that error right now, it is my office PC. It says that error inserting into the readonly column xyz, some times it says that vs_isbroken, for the read only column error as I mentioned a enabled the identity insert but it did not help..
Please help me. It is an opportunity in my office for me.
SSIS and SQL Server 2008 Wizards can be finicky tools.
If you get a "can't insert into column ABC", then it could be one of the following:
Inserting into a PK column -> when setting up the mappings, you need to indicate to overwrite the value
Inserting into a column with a smaller range -> for example from nvarchar(256) into nvarchar(50)
Inserting into a calculated column (pointed out by #Nick.McDermaid)
You could also get issues with referential integrity if your database uses this (most do).
If you're going to do this more often, then I suggest you build an SSIS package instead of using the wizard tooling. This way you will see warnings on all sorts of issues like the ones I've described above. You can then run your package on demand.
Another suggestion I would make, is that you insert DB1 into "stage" tables in DB2. These tables should have no relational integrity and will allow you to break the process into several steps as follows.
Stage the data from DB1 into DB2
Produce reports/queries on issues pertinent to your database/rules
Merge the data from stage tables into target tables using SQL
That last step is where you can use merge statements, or simple insert/updates depending on a key match. Using SQL here in the local database is then able to use set theory to manage the overlap of the two sets and figure out what is new or to be updated.
SSIS "can" do this, but you will not be able to do a bulk update using SSIS, whereas with SQL you can. SSIS would do what is known as RBAR (row by agonizing row), something slow and to be avoided.
I suggest you inform your seniors that this will take a little longer to ensure it is reliable and the results reportable. Then work step by step, reporting on each stages completion.
Another two small suggestions:
Create _Archive tables of each of the stage tables and add a Tstamp column to each. Merge into these after the stage step which will allow you to quickly see when which rows were introduced into DB2
After stage and before the SQL merge step, create indexes on your stage tables. This will improve the merge performance
Drop those Indexes after each merge, this will increase the bulk insert Performance
Basic on Staging (response to question clarification):
Links:
http://www.codeproject.com/Articles/173918/How-to-Create-your-First-SQL-Server-Integration-Se
http://www.jasonstrate.com/tag/31daysssis/
http://blogs.msdn.com/b/andreasderuiter/archive/2012/12/05/designing-an-etl-process-with-ssis-two-approaches-to-extracting-and-transforming-data.aspx
Staging is the act of moving data from one place to another without any checks.
First you need to create the target tables, the schema should match the source tables.
Open up BIDS and create a new Project and in it a new SSIS package.
In the package, create a connection for the source server and another for the destination.
Then create a data flow step, in the step create a data source for each table you want to copy from.
Connect each source to a new data destination and set the appropriate connection and table.
When done, save and do a test run.
Before the data flow step, you might like to add a SQL step that will truncate all the target tables.
If you're open to using tools then what about using something like Red Gate Sql Compare and Red Gate SQL Data Compare?
First I would use data compare to manage the schema differences, add the new columns you want to your destination database (database2) from the source (database1). Then with data compare you match the contents of the tables any columns it can't match based on names you specify how to handle. Then you can pick and choose what data you want to copy from your destination. So you'll see what data is new and what's different (you can delete data in the destination that's not in the source or ignore it). You can either have the tool do the work or create you a script to run when you want.
There's a 15 day trial if you want to experiment.
Seems like maybe you are looking for Replication technology as is offered by SQL Server Replication.
Well, if i understood your requirement correctly, you need to make database2 a replica of database1. Why not take a full backup of database1 and restore it as database2? Your database2 will be exactly what database1 is at the time of backup.

Using SSIS to create new Database from two separate databases

I am new to SSIS.I got the task have according to the scenario as explained.
Scenario:
I have two databases A and B on different machines and have around 25 tables and 20 columns with relationships and dependencies. My task is to create a database C with selected no of tables and in each table I don't require all the columns but selected some. Conditions to be met are that the relationships should be intact and created automatically in new database.
What I have done:
I have created a package using the transfer SQL Server object task to transfer the tables and relationships.
then I have manually edited the columns that are not required
and then I transferred the data using the data source and destination
My question is: can I achieve all these things in one package? Also after I have transferred the data how can I schedule the package to just transfer the recently inserted rows in the database to the new database?
Please help me
thanks in advance
You can schedule the package by using a SQL Server Agent Job - one of the options for a job step is run SSIS package.
With regard to transferring new rows, I would either:
Track your current "position" in another table, assumes you have either an ascending key or a time stamp column - load the current position into an SSIS variable, use this variable in the WHERE statement of your data source queries.
Transfer all data across into "dump" copies of each table (no relationships/keys etc required just the same schema) & use a T-SQL MERGE statement to load new rows in, then truncate "dump" tables.
Hope this makes sense - its a bit difficult to get across in writing.

SQL Server Schema to Schema Migration

I would like to know which one is the best approach for migrating existing DB data to another new DB with entirely different structure. I want to copy the data from my old DB and need to insert the data in new DB. For me the table names and column names of new DB is entirely different. I am using SQL Server 2008.
You should treat this as an ETL problem, not a migration, as the two schemas are entirely different. The proper tool for this is SSIS. SSIS allows you to create dataflows that map columns from one table to another, add derived sources, perform splits, merges, etc. If possible you should create source queries that return results close to the schema of the target database so you need fewer transformations.
In this you have to migrate most of the parts manually by running scripts. AFAIK automatically it will not synchronize. But using SSMS you Map tables of two different db's. hope that will help.