Loops in Pentaho - is this transformation looping? - pentaho

Is the following transformation looping through each of the rows in the applications field?
Also is there a way to loop through and output each individual row to it's own txt or excel file (preferably txt).
At the moment it outputs all rows to the one text file. I want to do this without creating multiple text file transformations.
Unsure if a switch case would be a loop.

Transformations by their very nature apply the steps to all the rows in them. It's probably a good idea to familiarize yourself a bit more with the flow-based concept, then you can answer the switch/case question for yourself.
Regarding one file per row, you can use the option "Accept filename from field" in the Text File Output step and then put your Applications field there. You will need to add the destination path in a prior step, since PDI expects the full path and filename in that field.

Related

Excel to CSV Plugin for Kettle

I am trying to develop a reusable component in Pentaho which will take an Excel file and convert it to a CSV with an encoding option.
In short, I need to develop a transformation that has an Excel input and a CSV output.
I don't know the columns in advance. The columns have to be dynamically injected to the excel input.
That's a perfect candidate for Pentaho Metadata Injection.
You should have a template transformation wich contains the basic workflow (read from the excel, write to the text file), but without specifiying the input and/or output formats. Then, you should store your metadata (the list of columns and their properties) somewhere. In Pentaho example an excel spreadsheet is used, but you're not limited to that. I've used a couple of database tables to store the metadata for example, one for the input format and another one for the output format.
Also, you need to have a transformation that has the Metadata Injection step to "inject" the metadata into the template transformation. What it basically does, is to create a new transformation at runtime, by using the template and the fields you set to be populated, and then it runs it.
Pentaho's example is pretty clear if you follow it step by step, and from that you can then create a more elaborated solution.
You'll need at least two steps in a transformation:
Input step: Microsoft Excel input
Output step: Text file output
So, Here is the solution. In your Excel Input Component, in Fields Section, mention maximum number of fields which will come in any excel. Then Route the Input excel to text field based on the Number of fields which are actually present. You need to play switch/case component here.

Update multiple Excel sheets of one document within one Pentaho Kettle transformation

I am researching standard sample from Pentaho DI package: GetXMLData - Read parent children rows. It reads separately from same XML input parent rows & children rows. I need to do the same and update two different sheets of the same MS Excel Documents.
My understanding is that normal way to achieve it is to put first sequence in one transformation file with XML Output or Writer, second to the second one & at the end create job with chain from start, through 1st & 2nd transformations.
My problems are:
When I try to chain above sequences I loose content of first updated Excel sheet in the final document;
I need to have at the end just one file with either Job or Transformation without dependencies (In case of above proposed scenario I would have 1 KJB job + 2 KTR transformation files).
Questions are:
Is it possible to join 2 sequences from above sample with some wait node before starting update 2nd Excel sheet?
If above doesn't work: Is it possible to embed transformations to the job instead of referencing them from external files?
And extra question: What is better to use: Excel Output or Excel Writer?
=================
UPDATE:
Based on #AlainD proposal I have tried to put Block node in-between. Here is a result:
Looks like Block step can be an option, but somehow it doesn't work as expected with Excel Output / Writers node (or I do something wrong). What I have observed is that Pentaho tries to execute next after Block steps before Excel file is closed properly by the previous step. That leads to one of the following: I either get Excel file with one empty sheet or generated result file is malformed.
My input XML file (from Pentaho distribution) & test playground transformation are: HERE
NOTE: While playing do not forget to remove generated MS Excel files between runs.
Screenshot:
Any suggestions how to fix my transformation?
The pattern goes as follow:
read data: 1 row per children, with the parent data in one or more column
group the data : 1 row per parent, forget the children, keep the parent data. Transform and save as needed.
back from the original data, lookup each row (children) and fetch the parent in the grouped data flow.
the result is one row per children and the needed column of the transformed parent. Transform and save as needed.
It is a pattern, you may want to change the flow, and/or sort to speed up. But it will not lock, nor feed up the memory: the group by and lookup are pretty reliable.
Question 1: Yes, the step you are looking after is named Block until this (other) step finishes, or Blocking Step (untill all rows are processed).
Question 2: Yes, you can pass the rows from one transformation to an other via the job. But it would be wiser to first produce the parent sheet and, when finished, read it again in the second transformation. You can also pass the row in a sub-transformation, or use other architecture strategies...
Question 3: (Short answer) The Excel Writer appends data (new sheet or new rows) to an existing Excel file, while the Excel Output creates and feed a one sheet Excel file.

Passing data from one Pentaho transformation to another in a job?

Fairly straightforward question I think, I just haven't been able to find a clear example. I have a very complex transformation that I'm breaking down into a job. Having never created a job before, I'm struggling to send the data from one transformation to another. I used Copy Rows to Result in the first one and Get Rows From Result in the second one, but I feel like I'm still missing something. When I used Get Rows, I had to specify the row names - there was no sort of Get Fields button. I also can't preview the data in the transformation without running the job and having it save to an Excel file. When I did that, ALL of the fields were in the output file -- instead of just the ones I'd specified in the second transformation.
I've searched through the documentation and tried Googling but I can't find a clear walkthrough just on how to smoothly move data from one transformation to another. Any responses would be appreciated even if it's just pointing me towards something I've overlooked.
Thanks!
The most commom way is to use copy rows to result at the end of one KTR and use get rows from result as the starting point for the next one. Though you really can't "see" the result while operating in the next KTR, what you can do to ease the reading is set a preview window and leave it open to see all the columns names and data.
Whoever if you want to set just a few lines of code through to the next KTR you can use Set variables as the ending step of the first KTR and capture those variables at anytime in the second using Get Variables steps. Don't forget that if you do so you need to set the variables in the parent KJB(the Job that called the first KTR) with no Default value, and the Variable scope type of the Set variables step has to be set to Valid in the parent job.
The best way is to create KTR's, run/test each. This way you can examine resulting data and then integrate all individual transformations into the final job.

Pentaho PDI how to validate source Excel metadata for the order and number of columns?

In my case, I need to process input data in Excel (xls and xlsx) format. I need to do a file level validation of the Excel file for the order and number of columns, before processing the row level data. If this file level validation is failed, then exclude this file and inform the concerned through mail.
Please guide me, with some sample or example, how to validate the excel files for metadata? I thought of placing a variable in kettle.properties with semicolon separated header fields and compare this with the source excel file. But not getting a way to extract only the header row from file as I want.
Please guide me.
Are column names on Row 1 of your file (or any other row reasonably close to row 1) and you know how many fields are in each, at most? If so, maybe you can get away with that.
Step 1: You need to understand how many rows may there be, what they may be called, what data types, etc.
Step 2: Read the first N rows of the file(s) ensuring the header row will be read; Filter everything that is not the header (how to? depends on the specific structure). Because you don't know what are the field names, just name them field0, ... field999 or whatever.
Step3: Work some magic on the headers; filtering based on position of certain fields, mapping field names to data types, etc.
Step4: Metadata injection. Using the information you already have from before, you create a template transformation that is generic in the sense that field names are not set up in the excel input step. The metadata injection allows you to set up that step in run time, depending on the entire logic you just applied on the headers.
This page has a couple example videos: http://wiki.pentaho.com/display/EAI/ETL+Metadata+Injection
I had to build something like that (only it was CSV files and not XLS) a while back and metadata injection allowed me to load every single file in one go with 100% mapping accuracy. Of course, the magic happens before, when you parse the header row.
Thanks nsousa for your answer.
I got to the required solution with the help of my colleague. Here what I did
(1) Read only the 1st row of the source Excel file as normal data (no header, limit 1) where the field names will be called as F1, F2 etc
(2) concat the fields (data) to get a pattern
(3) Match this pattern with acual metadata pattern, if they are matching, then excel file is passed
Good trick. Thanks.

How to create conditional destinations in SSIS Data Flow?

Goal: I have a Db source. Depending on a variable, i need to store it into a fixed width file OR a delimited file.
How do I do this in a data flow? I tried creating a conditional split, with two conditions. One condition going to a fixed width destination, and one to a delimited condition. Problem is that conditional split executed BOTH conditions even if no data comes in one condition. Becuase filename is same, so it errors out.
I would keep your solution with the folowing tweeks.
Write out to two Filename-fixed.txt and filename-delim.txt. Before those steps add row count tasks.
Then in your control flow you have two Success paths. Edit the success paths to look for both success and expression. Add an expression that checks the count from the new row count tasks in your dataflow. If you have file system tasks as your end point have them rename your fixed or delim file to the correct file name.
Note: I didn't try this and the pics all have red x's because I find it helpful to have the picture to figure out the logic not because I actually coded the solution.
Use two different data flows and do the diversion from with in the control flow. If you want to do it within the data-flow itself I guess you will have to use different filenames.