There can be many solutions:
If you have timestamp columns in both the source and destination tables, then you can take two table input steps. In the first one, just select the max last updated timestamp, use it as a variable in the next table input, taking it as a filter for the source data. You can do something like this:
If you just want the new data to be updated in the destination table and you don't care much about timestamp, I would suggest you to use insert/update step for output. It will bring all the data to the stream and if it finds a match, it won't insert anything. If it doesn't find a match, it will insert the new row. If it finds any modifications to the existing row in the destination table, it will update it accordingly.

Related

Convert the latest data pull of a raw Variant table into a normal table: Snowflake

I have a variant table where raw json data is stored in a column called "raw" as shown here.
Each row of this table is a full data pull from an API and ingested via snowpipe. Within the json there is a 'pxQueryTimestamp' key and value pair. The latest value for this field should have the most up to date data. How would I go about only normalizing this row?
Usually my way around this, is to only pipe over the latest data from "s3" so that this table has only one row, then I normalize that.
I'd like to have a historic table of all data pulls as show below but when normalizing we only care about the most relevant up to date data.
Any help is appreciated!
If you are saying that you want to flatten and retain everything in the most current variant record, then I'd suggest leveraging a STREAM object in Snowflake, which would then only have the latest variant record. You could then TRUNCATE your flattened table and run an insert from the STREAM object to your flattened table, which would then move the offset forward and your STREAM would then be empty.
Take a look at the documentation here:
https://docs.snowflake.net/manuals/user-guide/streams.html

Add new column to existing table Pentaho

I have a table input and I need to add the calculation to it i.e. add a new column. I have tried:
to do the calculation and then, feed back. Obviously, it stuck the new data to the old data.
to do the calculation and then feed back but truncate the table. As the process got stuck at some point, I assume what happens is that I was truncating the table while the data was still getting extracted from it.
to use stream lookup and then, feed back. Of course, it also stuck the data on the top of the existing data.
to use stream lookup where I pull the data from the table input, do the calculation, at the same time, pull the data from the same table and do a lookup based on the unique combination of date and id. And use the 'Update' step.
As it is has been running for a while, I am positive it is not the option but I exhausted my options.
It's seems that you need to update the table where your data came from with this new field. Use the Update step with fields A and B as keys.
actully once you connect the hope, result of 1st step is automatically carried forward to the next step. so let's say you have table input step and then you add calculator where you are creating 3rd column. after writing logic right click on calculator step and click on preview you will get the result with all 3 columns
I'd say your issue is not ONLY in Pentaho implementation, there are somethings you can do before reaching Data Staging in Pentaho.
'Workin Hard' is correct when he says you shouldn't use the same table, but instead leave the input untouched, and just upload / insert the new values into a new table, doesn't have to be a new table EVERYTIME, but instead of truncating the original, you truncate the staging table (output table).
How many 'new columns' will you need ? Will every iteration of this run create a new column in the output ? Or you will always have a 'C' Column which is always A+B or some other calculation ? I'm sorry but this isn't clear. If the case is the later, you don't need Pentaho for transformations, Updating 'C' Column with a math or function considering A+B, this can be done directly in most relational DBMS with a simple UPDATE clause. Yes, it can be done in Pentaho, but you're putting a lot of overhead and processing time.

how to remove duplicate row from output table using Pentaho DI?

I am creating a transformation that take input from CSV file and output to a table. That is running correctly but the problem is if I run that transformation more then one time. Then the output table contain the duplicate rows again and again.
Now I want to remove all duplicate row from the output table.
And if I run the transformation repeatedly it should not affect the output table until it don't have a new row.
How I can solve this?
Two solutions come to my mind:
Use Insert / Update step instead of Table input step to store data into output table. It will try to search row in output table that matches incoming record stream row according to key fields (all fields / columns in you case) you define. It works like this:
If the row can't be found, it inserts the row. If it can be found and the fields to update are the same, nothing is done. If they are not all the same, the row in the table is updated.
Use following parameters:
The keys to look up the values: tableField1 = streamField1; tableField2 = streamField2; tableField3 = streamField3; and so on..
Update fields: tableField1, streamField1, N; tableField2, streamField2, N; tableField3, streamField3, N; and so on..
After storing duplicite values to the output table, you can remove duplicites using this concept:
Use Execute SQL step where you define SQL which removes duplicite entries and keeps only unique rows. You can inspire here to create such a SQL: How can I remove duplicate rows?
Another way is to use the Merge rows (diff) step, followed by a Synchronize after merge step.
As long as the number of rows in your CSV that are different from your target table are below 20 - 25% of the total, this is usually the most performance friendly option.
Merge rows (diff) takes two input streams that must be sorted on its key fields (by a compatible collation), and generates the union of the two inputs with each row marked as "new", "changed", "deleted", or "identical". This means you'll have to put Sort rows steps on the CSV input and possibly the input from the target table if you can't use an ORDER BY clause. Mark the CSV input as the "Compare" row origin and the target table as the "Reference".
The Synchronize after merge step then applies the changes marked in the rows to the target table. Note that Synchronize after merge is the only step in PDI (I believe) that requires input be entered in the Advanced tab. There you set the flag field and the values that identify the row operation. After applying the changes the target table will contain the exact same data as the input CSV.
Note also that you can use a Switch/Case or Filter Rows step to do things like remove deletes or updates if you want. I often flow off the "identical" rows and write the rest to a text file so I can examine only the changes.
I looked for visual answers, but the answers were text, so adding this visual-answer for any kettle-newbie like me
Case
user-updateslog.csv (has dup values) ---> users_table , store only latest user detail.
Solution
Step 1: Connect csv to insert/update as in the below Transformation.
Step 2: In Insert/Update, add condition to compare keys to find the candidate row, and choose "Y" fields to update.

Derived date calculation

I am currently entering data into a SQL Server database using SSIS. The plan is for it to do this each week but the day that it happens may differ depending on when the data will be pushed through.
I use SSIS to grab data from an Excel worksheet and enter each row into the database (about 150 rows per week). The only common denominator is the date between all the rows. I want to add a date to each of the rows on the day that it gets pushed through. Because the push date may differ I can't use the current date I want to use a week from the previous date entered for that row.
But because there are about 150 rows I don't know how to achieve this. It would be nice if I could set this up in SQL Server where every time a new set of rows are entered it adds 7 days from the previous set of rows. But I would also be happy to do this in SSIS.
Does anyone have any clue how to achieve this? Alternatively, I don't mind doing this in C# either.
Here's one way to do what you want:
Create a column for tracking the data entry date in your target table.
Add an Execute SQL Task before the Data Flow Task. This task will retrieve the latest data entry date + 7 days. The query should be something like:
select dateadd(day,7,max(trackdate)) from targettable
Assign the SQL result to a package variable.
Add a Derived Column Transformation between your Source and Destination components in the Data Flow Task. Create a dummy column to hold the tracking date and assign the variable to it.
When you map the Excel to table in a Data Flow task, map the dummy column created earlier to the tracking date column. Now when you write the data to DB, your tracking column will have the desired date.
Derived Column Transformation

stored procedure sql (Excel data to T-SQL)

I need to set up a new company for automated data import. The utility has provided the data in a spreadsheet. (Image 1)
Based on this data, I need to create a stored procedure that will identify the correct meter, if it exists, and perform either an insert or update to the monthly data table. For automated utility data import, I want to make sure I restrict everything to a particular utility company.
The steps are the following ( I am having a hard time converting this to SQL)
1- I just want a script that identify the correct meter to see if it exists, basically check the Meter# column in the excel with the MeterNumber column in the Meters table.
2- The next step is perform either an insert or update to the MonthlyData table. This is a screen shot of all its columns.
3- Then I just want to make sure that I am restricting everything to the particular company which in this case Site1 since 2 different companies might have the same meter#. The UtilityCompany table contains 3 columns: ID, Name, UtilityType
I honestly do not know from where to get started, would anybody help me with the script? Thank you
You will want to:
perform a Bulk Insert operation to take your data from the excel file into a staging table.
write a query to select ALL rows for the corresponding utility company (notice I didn't see iterate over each row...). This select could be an update where you update an additional column to mark the row as an INSERT, or an UPDATE.
Then the last step (2 parts), retrieve all of the rows that were marked as INSERT, and insert those into your table. Then grab all rows that were marked with an UPDATE, and update their corresponding values based on your matching criteria.