I've been playing with the basic CloudBalance example, and have given it input of one Computer and two Processes. Both processes are too much to fit on the computer, so only one should go on. However, when solving the solution (albeit with negative HardScore) is that both Processes are on the Computer. I understand there is not actual solution for both Processes, but shouldn't the result only have one Process assigned to the Computer, and the other not assigned? How would I need to change the setup to make that happen?

Look at Overconstrained Planning in the docs. By default, OptaPlanner will assign all Processes, because assigning to null is not an option.

Related

Unable to resume solving using a previous best solution or a serialized solution

To all,
Version of optaplanner: 7.48
Since a moment now, I'm no longer able to resume solving.
The process is:
thread 1: solver.solve();
thread 2: solver.terminateEarly();
thread 2: solver.solve(solver.getBestSolution());
The longer the time spent between solve() and terminateEarly() is short, the less likely the resume is to work fine.
When not working, symptoms are after the Construction Heuristics is finished, only a few new best solutions are found and then the solver stops for ever to find new best solutions even if it's still calculating at a significant CPU rate.
The problem is similar when solver.getBestSolution() is serialized and reloaded later.
Any suggestion?
Thanks.
Regards.
JLL
Based on the contents of the question, the title is wrong - OptaPlanner resumes just fine, it just can not find any better solutions. There are two reasons for why that could be the case:
There are no more better solutions to be found. The bigger your data set becomes, the less likely this is.
There are better solutions available, but OptaPlanner can not get to them, as it is stuck in a local optima. This is a common problem.
Escaping local optima is usually accomplished by a combination of the following:
Eliminating score traps from your constraints.
Increasing variety in move selection. See the available generic moves, or consider implementing a custom move for any intricacies of your particular problem.
Iterative local search. We do not (yet) support that out of the box, but the general idea is that at a certain point, you ruin a part of your solution (perhaps by uninitializing it) and then recreate it (randomly or otherwise).
Finally, I wholeheartedly recommend you to upgrade to OptaPlanner 8. The upgrade is easy, and the 7.x stream has been in maintenance mode for a very long time now.

I'm looking to create an automated numbering system for custom paint by number kits in photoshop

So I know very little about programming all around. I'm adept at photoshop and I'm looking to automate the numbering system for making these paint by number kits. I convert the images into vector format and set a maximum number of color variations. I then use adobe illustrator to create the outlined partitions of the image by color. This is all well and good, it's automated and efficient as far as I need.
My dilemma is that I do not have a system that can number these partitions in a clear and uniform fashion. I must do this tediously in photoshop, taking hours to finish.
I am looking to create or find a system that will do this last step automatically.
My vison for how this would look would be numbers, 1-20 or so depending on the set color cap, evenly distributed across each partition in uniform font and size. The idea is that there would be a grid of 1 number (this number would be the reference to the color needed in this partition) spread across larger partitions and only a few of 1 number on the smaller partitions. It would hopefully look like so:
You can see here how tedious this can become.
I don't know how to accomplish this, but I'm wondering how complicated this process would be in theory and would it be better for me to learn how to do it myself, hire a professional, or continue the hand numbering. It's creating a labor cap on my small business that is preventing me from further growth.
Any and all help is very much appreciated; if I can provide more context or specifications I would be more than happy to do so. Thank you!
Just for fun I've managed to tweak old Johnware's script (Circle Fill). Now it can fill with given letters (numbers for example). It works to a degree, but the result far from ideal:
Probably it can be used for start.
I believe a real programmer could make it way better.
My tweaked version of the script is here: https://disk.yandex.ru/d/Ze4-1DQoNRVF1g
Update
I'm improved the script further. Now it:
works more precise
handles several selected paths
remembers values in the dialog window
sets font size
Here is the is the updated version of the script: https://disk.yandex.ru/d/0pcpLDGrfQKMJA
It took me about 15 minutes to do this:
But I had to to split some complex paths with a Knife tool. Sometimes the script throws a some mystical error. I've just selected another set of paths an run the scripts again and again.
It is not a final result but it's close. I think it's much faster that to do it manually.
It can be done with script to some degree. It will work fine for simply forms. But for complicated forms it will be too hard to calculate where you need to put all numbers and how many number will be enough.
But I saw scripts that can fill any form with any symbols. So it's possible to fill any form with numbers, I think, technically.
Of course, if you aren't a seasoned coder it makes no sense to try to do it at home. You need a pro (not even me).
And I see another very simply options as well:
It doesn't even need a script. What do you think?

Optaplanner: Reproducible solution

I am trying to solve a problem similar to employee rostering. The problem I am facing is every time I run the solver, it generates a different assignment. This makes it harder to debug why a particular case was picked over another. Why is this the case?
P.S. My assignment has many hard constraint and all of them may not be satisfied (most cases I still see some negative hard score). So my termination strategy is based on unimprovedSecondsSpentLimit. Could this be the reason?
Yes, it's likely the termination. OptaPlanner's default environmentMode guarantees the exact same solution at the exact same step (*). But CPU cycles differ a lot from run to run, so that means you get more or less steps per run. Use DEBUG logging to see that.
Use stepCountLimit or unimprovedStepCountLimit termination.
(*) Unless specified otherwise in the docs. Simulated Annealing for example will be different even in the exact same step if used with time bound terminations.

How do we run multiple cases in labVIEW?

Im working on running traffic lights on four cases by using case structure and Flat-sequence structure. For example, there is green light on first case, and the rest of the three cases should have red light. As soon as the first case approaches to red light, the second case moves towards the green light. All these are controlled by specific time delays. The flat sequence structure is running the traffic lights properly in all the four cases, but, when I insert case structure, it only runs one case and does not activate the other cases. How can i make the VI run all the four cases simultaneously??
First off, this is an old CLD exam. There should be a wealth of examples available from a quick search. That said, some suggestions: never use a flat-sequence structure. Ever. Instead you need to use some combination of a state machine and subVIs. NI has a prep kit for the CLD (below). Check it out, it’ll show you what a state machine is in LabVIEW and how to take advantage of subVIs.
http://www.ni.com/gate/gb/GB_EKITCLDEXMPRP/US

How to prove that code isn't broken, but the hardware is?

I'm sure it repeats everywhere. You can 'feel' network is slow, or machine or slow or something. But the server/chassis logs are not showing anything, so IT doesn't believe you. What do you do?
Your regressions are taking twice the time ... but that's not enough
Okay you transfer 100 GB using dd etc, but ... that's not enough.
Okay you get server placed in different chassis for 2 week, it works fine ... but .. that's not enough...
so HOW do you get IT to replace the chassis ?
More specifically:
Is there any suite which I can run on two setups ( supposed to be identical ), which can show up difference in network/cpu/disk access .. which IT will believe ?
Computers don't age and slow down the same way we do. If your server is getting slower -- actually slower, not just feels slower because every other computer you use is getting faster -- then there is a reason and it is possible that you may be able to fix it. I'd try cleaning up some disk space, de-fragmenting the disk, and checking what other processes are running (perhaps someone's added more apps to the system and you're just not getting as many cycles).
If your app uses a database, you may want to analyze your query performance and see if some indices are in order. Queries that perform well when you have little data can start taking a long time as the amount of data grows if they have to use table scans. As a former "IT" guy, I'd also be reluctant to throw hardware at a problem because someone tells me the system is slowing down. I'd want to know what has changed and see if I could get the system running the way it should be. If the app has simply out grown the hardware -- after you've made suitable optimizations -- then upgrading is a reasonable choice.
Run a standard benchmark suite. See if it pinpoints memory, cpu, bus or disk, when compared to a "working" similar computer.
See http://en.wikipedia.org/wiki/Benchmark_(computing)#Common_benchmarks for some tips.
The only way to prove something is to do a stringent audit.
Now traditionally, we should keep the system constant between two different sets while altering the variable we are interested. In this case the variable is the hardware that your code is running on. So in simple terms, you should audit the running of your software on two different sets of hardware, one being the hardware you are unhappy about. And see the difference.
Now if you are to do this properly, which I am sure you are, you will first need to come up with a null hypothesis, something like:
"The slowness of the application is
unrelated to the specific hardware we
are using"
And now you set about disproving that hypothesis in favour of an alternative hypothesis. Once you have collected enough results, you can apply statistical analyses on them, to decide whether any differences are statistically significant. There are analyses to find out how much data you need, and then compare the two sets to decide if the differences are random, or not random (which would disprove your null hypothesis). The type of tests you do will mostly depend on your data, but clever people have made checklists to help us decide.
It sounds like your main problem is being listened to by IT, but raw technical data may not be persuasive to the right people. Getting backup from the business may help you and that means talking about money.
Luckily, both platforms already contain a common piece of software - the application itself - designed to make or save money for someone. Why not measure how quickly it can do that e.g. how long does it take to process an order?
By measuring how long your application spends dealing with each sub task or data source you can get a rough idea of the underlying hardware which is under performing. Writing to a local database, or handling a data structure larger than RAM will impact the disk, making network calls will impact the network hardware, CPU bound calculations will impact there.
This data will never be as precise as a benchmark, and it may require expensive coding, but its easier to translate what it finds into money terms. Log4j's NDC and MDC features, and Springs AOP might be good enabling tools for you.
Run perfmon.msc from Start / Run in Windows 2000 through to Vista. Then just add counters for CPU, disk etc..
For SQL queries you should capture the actual queries then run them manually to see if they are slow.
For instance if using SQL Server, run the profiler from Tools, SQL Server Profiler. Then perform some operations in your program and look at the capture for any suspicous database calls. Copy and paste one of the queries into a new query window in management studio and run it.
For networking you should try artificially limiting your network speed to see how it affects your code (e.g. Traffic Shaper XP is a simple freeware limiter).