Cascade on insert #SQL Server 2008 - sql

I'm having some issues due to inexperience in SQL Server.
The issue/problem I'm facing right now is that I have data that needs to be inserted into a master table and as my database scheme is based on the "snowflake-scheme" ..
I have issues understanding what to do when adding data to the master table. My slave tables (I got more than 6 of them), which mostly contain foreign keys should be updated/and if data doesn't exist the id's (which are incremented in the master-table) should be inserted into the slave tables too..
I thought maybe one solution could be using triggers. Can someone give me some hints?

Yeah. RTFM. And grab some books about data warehouse design. Particular focus on data load scenarios.
The general consensus in non trivial scenarios seems to be from my work experience to NOT do this automatically but through a multi step load process.
You generally load the data into temporary tables (staging tables), then processing runs and fills out the missing information in the related tables FIRST. And then makes the fact table (that is the central table in a snowflake) insert last.
The fundamental problem you have is that it is not possible to insert magic data into a related slave table (as you call it) because the data is not there in the insert statement. I.e. you must have the proper ID in the insert AND you must actually know what other fields to fill out in the slave table. Automatic cascades will not allow the later at all, making it a dead end fundamentally.
And this is no a sql server specific issue. We talk about fundamental concepts of database work here.

Related

Why would all tables not be temporal tables by default?

I'm creating a new database and plan to use temporal tables to log all changes. The data stored will be updated daily but will not be more than 5000 records per table
Is there any reason I shouldn't just make all tables temporal?
Ps. I am aware of the space usage of temporal tables, this is not as far as I understand a problem
I am aware of the space usage of temporal tables, this is not as far as I understand a problem
On the contrary - it's pretty big problem - and there are many other downsides too.
When you use Temporal Tables (at least in SQL Server), every UPDATE operation (even if the data is unchanged) results in a copy being made in the History table (granted, under-the-hood this may be a COW-optimized copy, but it's still another conceptual entity instance).
Secondly - from my personal experience working with LoB applications: most changes to databases are not important enough to justify creating an entire copy of a row, for example, imagine a table with 4 columns ( CREATE TABLE People ( FirstName nvarchar(50), LastName nvarchar(50), Address nvarchar(200), Biography nvarchar(max): whenever a typo in FirstName is fixed then all of the data in the other columns is copied-over, even if Biography contains a 4GB worth of text data - even if this is COW-optimized it's still creating copies for every user action that results in a change.
Is there any reason I shouldn't just make all tables temporal?
The main reason, in my experience, is that it makes changing your table schema much harder because the schemas (aka "table design") of the Active and History tables must be identical: so if you have a table with a NULL column that you want to change to a NOT NULL column and you have NULL values in your History table then you're stuck - at least until you write a data transformation step that will supply the History table with valid data - it's basically creating more work for yourself with little to gain.
Also, don't confuse Temporal Tables with Immutable, Append-only data-stores (like the Bitcoin Blockchain) - while they share similar design objectives (except true immutability) they exist to solve different problems - and if you consider the size requirements and scaling issues of the Ethereum block-chain (over a terabyte by now) then that should give you another idea why it's probably not a good idea.
Finally, even if Temporal Tables didn't have these issues - you still need to go through the effort to write your main software such that it can natively handle temporal data - and things like Entity Framework still don't have built-in support for querying Temporal Data.
...and even with all the historical records you've managed to save in the History table, what do you want it for? Do you really need to track every corrected typo and small, inconsequential change? How will your users react to needing to manually audit the changes to determine what's meaningful or not?
In short:
If your table design probably won't change much in the future...
AND small updates happen infrequently...
OR large updates happen regularly AND you need an audit record
...then go ahead and use Temporal Tables wherever you can.
if not, then you're just creating more future work for yourself with little to gain.
"log all changes" is not a good use case for the temporal features in SQL.
The use case for the SYSTEM TIME temporal feature is when there is a pressing requirement obligating you/the user to be able to easily and quickly reconstruct (should be in scare quotes actually) the state that your database was in at a given moment in time. That is difficult and error-prone and expensive if all you have is a true log of past changes. But if you can suffice with keeping just a log of the changes, then do that (it will be difficult and error-prone and expensive to recreate past database states from the current state and your log, but that's not a pressing problem if there's no pressing need).
Also note that the SQL temporal features encompass also the notion of BUSINESS TIME, which is a different time dimension than the SYSTEM TIME one. Business time is targeted to keeping a history of the world situation, system time is targeted at keeping a history of your database itself, that is, a history of your records of the world situation.

How to perform data archive in SQL Server with many tables?

Let's say I have a database with many tables in it. I want to perform data archiving on certain tables, that is create a same table with same structures (same constraint, indexes, columns, triggers, etc) as a new table and insert specific data into the new table from the old table.
Example, current table has data from 2008-2017 and I want to move only data from 2010-2017 into the new table. Then after that, I can delete the old table and rename the new table with naming conventions similar to old table.
How should I approach this?
For the sort of clone-rename-drop logic you're talking about, the basics are pretty straight forward. Really the only time this is a good idea is if you have a table with a large amount of data, which you can't afford down time or blocking on, and you only plan to do this one. The process looks something like this:
Insert all the data from your original table into the clone table
In a single transaction, sp_rename the original table from (for example) myTable to myTable_OLD (just something to distinguish it from the real table). Then sp_rename the clone table from (for example) myTable_CLONE to myTable
Drop myTable_OLD when you're happy everything has worked how you want. If it didn't work how you want, just sp_rename the objects back.
Couple considerations to think about if you go that route
Identity columns: If your table has any identities on it, you'll have to use identity_insert on then reseed the identity to pick up at where the old identity left off
Do you have the luxury of blocking the table while you do this? Generally if you need to do this sort of thing, the answer is no. What I find works well is to insert all the rows I need using (nolock), or however you need to do it so the impact of the select from the original table is mitigated. Then, after I've moved 99% of the data, I will then open a transaction, block the original table, insert just the new data that's come in since the bulk of the data movement, then do the sp_rename stuff
That way you don't lock anything for the bulk of the data movement, and you only block the table for the very last bit of data that came into the original table between your original insert and your sp_rename
How you determine what's come in "since you started" will depend on how your table is structured. If you have an identity or a datestamp column, you can probably just pick rows which came in after the max of those fields you moved over. If your table does NOT have something you can easily hook into, you might need to get creative.
Alternatives
A couple other alternatives that came to mind:
Table Partitioning:
This shards a single table across multiple partitions (which can be managed sort of like individual tables). You can, say, partition you data by year, then when you want to purge the trailing year of data, you "switch out" that partition to a special table which you can then truncate. All those operations are meta-data only, so they're super fast. This also works really well for huge amounts of data where deletes and all their pesky transaction logging aren't feasible
The downside to table partitioning is it's kind of a pain to set up and manage.
Batched Deletes:
If you're data isn't too big, you could just do batched deletes on the trailing end of your data. If you can find a way to get clustered index seeks for your deletes, they should be reasonably lightweight. As long as you're not accumulating data faster than you can get rid of it, the benefit of this kind of thing is you just run it semi-continuously and it just nibbles away at the trailing end of your data
Snapshot Isolation:
If deletes cause too much blocking, you can also set up something like snapshot isolation, which basically stores historical versions of rows in tempdb. Any query which sets isolation level read committed snapshot will then read those pre-change rows instead of contend for locks on the "real" table. You can then do batched deletes to your hearts content and know that any queries that hit the table will never get blocked by a delete (or any other DML operation) because they'll either read the pre-delete snapshot, or they'll read the post-delete snapshot. They won't wait for an in-process delete to figure out whether it's going to commit or rollback. This is not without its drawbacks as well unfortunately. For large data sets, it can put a big burden on tempdb and it too can be a little bit of a black box. It's also going to require buy-in from your DBAs.

When to use internal tables?

So, I have read that using internal tables increases the performance of the program and that we should make operations on DB tables as less as possible. But I have started working on a project that does not use internal tables at all.
Some details:
It is a scanner that adds or removes products in/from a store. First the primary key is checked (to see if that type of product exists) and then the product is added or removed. We use ‘Insert Into’ and ‘Delete From’ to add/remove the products directly from the DB table.
I have not asked why they do not use internal tables because I do not have a better solution so far.
Here’s what I have so far: Insert all products in an internal table, place the deleted products in another internal table.
Form update.
Modify zop_db_table from table gt_table." – to add all new products
LOOP AT gt_deleted INTO gs_deleted.
DELETE FROM zop_db_table WHERE index_nr = gs_deleted-index_nr.
ENDLOOP. " – to delete products
Endform.
But when can I perform this update?
I could set a ‘Save button’ to perform the update, but then there will be the risk that the user forgets to save large amounts of data, or drops the scanner, shutting it down or similar situations. So this is clearly not a good solution.
My final question is: Is there a (good) way to implement internal tables in a project like this?
internal tables should be used for data processing, like lists or arrays in other languages (c#, java...). From a performance and system load perspective it is preferred to first load all data you need into an internal table, then process that internal table instead of loading individual records from the database.
But that is mostly true for reporting, which is probably the most common type of custom abap program. You often see developers use select...endselect-statements, that in effect loop over a database table, transferring row after row to the report, one at a time. That is extremely slow compared to reading all records at once into an itab, then looping over the itab. More than once i've cut the execution time of a report down to a fraction by just eliminating roundtrips to the database.
If you have a good reason to read from the database or update records immediately, you should do so. If you can safely delay updates and deletes to a point in time where you can process all of them together, without risking inconsistencies, I'd consider than an improvement. But if there is a good reason (like consistency or data loss) to update immediately, do it.
Update: as #vwegert mentioned regarding the select-endselect statement, the statement doesn't actually create individual database queries for each row. The database interface of the application server optimizes the query, transferring rows in bulk to the application server. From there the records are transported to the abap report one by one (because in the report there is only the work area to store a single row), which has a significant performance impact especially for queries with large result sets. A select into an internal table can transport all rows directly to the abap report (as long as there is enough memory to hold them), as now there is the internal table to hold those records in the report.

Is using triggers best solution for this scenario

A large SQL transactional database has more than 100 tables (and it will grow). One of them is called Order. Then, there is another table WorkLoad which derives from Order and many other joined table which contains a list of all active order. Every time an order record is created, if it meets certain conditions, it should be instantly inserted into WorkLoad table. And finally, there is a third table WorkLoadAggregation which displays aggregated data grouped by date and shop and it is completely built from WorkLoad table. WorkLoadAggregation should also display live data meaning that if a record is inserted in WorkLoad table then matching date/shop aggregation should also be updated.
My idea was to handle this by following triggers:
When record is inserted in Order table, trigger calls stored procedure which inserts record into WorkLoad table
When Order record is deleted trigger deletes the record from WorkLoad table
When Order record is updated in a way that it doesn't meet WorkLoad conditions, trigger deletes the record from WorkLoad table
When record is inserted/deleted/updated in WorkLoad table, trigger calls stored procedure which updates matching date/shop aggregated record in WorkLoadAggregation table
I haven't used triggers that much in such large transaction dbs and for such frequent calls. Is there anything bad in this approach? My biggest concern is usage of "chained triggers", meaning that trigger on one table activates trigger on another table. I've been reading few articles which state that developers should be very cautious when using triggers. Are there any better solutions? Should I consider any NoSQL solution?
Database is hosted on SQL Server 2012.
Note: In case 5) the stored procedure that's called contains a CTE (case someone suggests using an indexed view)
It is a little difficult to provide a more concrete opinion, but based on the presentation of the problem space. I would not recommend this solution, as it would be difficult to test effectively and I can see this causing issues under times of high load. Also it is really hard to quantify the total impact as I am not sure what the read load would look like and how many other processes may need information out of those tables.
Based on how you have described the problem, and the fact that you asked about NoSQL approaches, I assume that eventual consistency is not much of a concern so I would recommend a more EventDriven Architecture. Keep in mind that this may mean a significant re-write of your current implementation but would definitely allow for better domain decomposition and scaling.

SQL Server Auditing Data in the Same Table

A project I'm working on requires that a record be digitally "signed" and after that any modifications would create a new "version" of the row. The "signed" record can't be modified for regulatory reasons and new versions shouldn't be modified very often. In the past, done so by creating a separate logging table with the same schema as the main table with some extra columns for tracking who modified it and when.
However, after doing some work with SharePoint where ALL data (including different versions) is put into the same table I thought of a different approach which I can't find any examples of people doing: I could put the new version of the row right in the same table and increment the version number. Then add the version number to the PK.
PROS:
Implementation is easy, just create an "Instead of update" trigger which performs an insert instead of an update of the row is "signed". I could easily add a IsCurrentVersion column to be updated in the trigger.
Querying for older versions is easy, just get all the records with
the ID I want let the user choose from the list.
A trigger is nice because it guarantees that a row CAN'T be updated if signed (for regulatory and audit purposes).
Schema changes to the table don't have to be replicated to the mirror "logging" table.
CONS:
The table could get a bit larger but most of the time the record won't be changed after "signing" it. The client estimated around 100,000 rows/year max at current usage levels. SQL Server can handle hundreds of millions of rows so this doesn't seem too bad.
Indexing and performance could be an issue. SharePoint adds a tp_CalculatedVersion int to the PK where the calculated number is always 0 for the latest version. I could do the same and calculate it based off the Version number. Would that help performance?
There is an extra step in querying the data to make sure you get the latest version but that could be handled in a SP.
What other cons are there in this scenario. Am I missing anything??
I've seen this pattern used in an enterprise system before,and IMO it wasn't successful.
You are Mixing two different concerns here, viz storage of live and audit data. Queries to this table will always need to keep in mind whether they are seeking leaf or audit data (e.g. reports) - new team members may find this non intuitive. You would likely need to encapsulate this complexity with views etc.
As you mentioned performance will always be a concern. Inserting a new record will also need to update the previous record to mark it as inactive.You may also need to consider changing your clustered index to keep all versions on the same page.
Foreign keys to this table are going to be problematic. Do you
reference an exact version record? Do you then fix up the foreign
keys to point to the new live leaf record?
The one benefit I can think of doing this is that the audit table DDL will always be in synch with the live table - often with the 2 table strategy changes are made to the live, and the audit and trigger DDL isn't updated accordingly.
Overall, I would still recommend keeping your audit table separate.
If the requirement is that the signed data not be changed, then you should move it to another table. In fact, I might suggest moving it to another database/schema, where the only operation allowed on the table is inserting and reading records. You can use both permissions and triggers, if you really want to prevent updates.
You don't want to mess around with regulatory requirements. A complex schema that uses a combination of primary key with version, along with triggers, is a sign that there might be a simpler way.
The historical records can affect performance of the current records. If you end up in a situation where every record has changed 100 times, then keeping them in the same table is just going to slow down queries. Of course, you can embark on more complexity, in the form of partitioning the data. In the end, the solution is simpler: keep the data that cannot be changed in another table where it cannot be changed. You don't want to have to upgrade the hardware just because lots of history has accumulated.
I would also suggest including an effective and end date in the history records. This will allow you to reconstruct all the data as of a particular date, something that users might find useful in the future.
That's right. Audit trails can stay in an application for internal reporting/audit but infosec best practice mandates getting audit logs off the system where they are generated into your log management / SIEM solution.