I need to synchronize tables between 2 databases daily, the source is MSSQL 2008, the target is MSSQL 2005. If I use UPDATE, INSERT, and DELETE statements (i.e. UPDATE rows that changed, INSERT new rows, DELETE rows no longer present), will there be performance improvements if I perform the DELETE statement first? i.e. so that the UPDATE statement doesn't look at rows that don't need to be updated, because they will be deleted.
Here are some other things I need to consider. The tables have 1-3 million+ rows, and because of the amount of transactions and business requirements, the source DB needs to remain online, and the query needs to be as efficient as possible. The job will be run daily in a SQL server agent job on the target DB. On top of that, I am a DB rookie!
Thanks StackOverflow community, you are awesome!

I'd say, first you do delete, then update then insert, so you don't have to update rows which will be deleted anyway and you'll not update rows which are just inserted.
But actually, have you seen SQL Server merge syntax? It could save you a great amount of code.
update I have not checked performance of MERGE statement against INSERT/UPDATE/DELETE, here's related link given by Aaron Bertrand for more details.

Rule of Thumb: DELETE, then UPDATE, then INSERT.
Performance aside, my main concern is to avoid any potential Deadlocks when:
Updating something you will immediately Delete.
Inserting something you may immediately try to Update.
If you only modify what is necessary and use transactions correctly, then you may use any order.
P.S. Someone suggested using MERGE - I've tried it a few times and my preference is to never use it.

I think Roman's answer is what you were looking for in your current situation: DELETE, UPDATE, INSERT (or MERGE.)
Now there are other possible routes which can make things even faster, but with a rather different process:
1. Consider saving all orders in a file that you, once in a while, run against the target
Assuming both databases are exactly the same, for each SQL order that modifies the 2008 database, save that order in a .sql file which you later execute against the 2005 database. You have to consider locking the file while writing to it, and maybe have some kind of redundancy. However, this means you need no access to the 2008 database at all while doing the work on the 2005 database. In other words, no side effects to the 2008 database speed.
Pitfall: you may miss a statement and the destination will not be an exact equivalent...
2. Ongoing replication
I do not know about MSSQL enough to tell you of a good tool to do automatic replication (see here: http://technet.microsoft.com/en-us/library/ms151198.aspx), but I'd bet you can find a good tool. MySQL (http://dev.mysql.com/doc/refman/5.0/en/replication.html) and PostgreSQL (http://wiki.postgresql.org/wiki/Streaming_Replication) have such tools and those are all free.
This would be the solution I would choose. Depending on the tool you use, it can be really very well optimized meaning that the impact on the live system will be minimal and the 2005 duplicate will be up to date within seconds (depending on whether it is a long distance remote connection or not, the amount of work, the setup of each server, the Internet connections, etc.)
The pitfall is obviously that it adds an ongoing process on the database, but if you find an MSSQL tool that works like the streaming replication of PostgreSQL, it makes use of a copy of the journal which means it is dead fast (no heavy use of disk I/O.)
3. Cluster Database (like Cassandra)
This would involve a change of database which I'm totally sure you're not ready to do (especially because most of those systems do not offer SQL,) but I thought that it would be a good thing to talk about in your situation.
A system like Cassandra (http://cassandra.apache.org/) automatically replicate its data on many computers. It can actually be setup to replicate all the data 100% or X% of data per computer with redundancy in case of failure (a computer that breaks down). This alleviates the need for a specific copy on a separate computer because the performance can be increased simply by adding a few nodes to your system. (At less than $1,000 a computer, it is worth it! Frankly you could create a Peta Byte system for $50k or less and end up with something a lot faster than any SQL database...)
The main problem is that the use of those clusters is completely different than SQL. But that could be a solution for big businesses having large databases that need to be really fast and they do not want to invest in a mini-computer (think Cobol and $250k computers that manage 100 million rows in a few milli-seconds...)
With Cassandra you can run extremely heavy batch processes on back end computers that do not make a dent to the front end system!

Related

SQL - Why transactions?

I just realized I've had a headache for years. Well, metaphorically speaking. In reality I was looking at my database structure and somehow just realized I never use transactions. Doh.
There's a lot of data on the internet about transactions (begin transaction, rollback, commit, etc.), but surprisingly not much detail about exactly why they are vital, and just exactly how vital?
I understand the concept of handling if something goes wrong. This made sense when one is doing multiple updates, for example, in multiple tables in one go, but this is bad practice as far as I know and I don't do this. All of my queries just update one table. If a query errors, it cancels, transaction or no transaction. What else could go wrong or potentially corrupt a one table update, besides my pulling the plug out of my server?
In other words, my question is,
exactly how vital is it that i implement transactions on all of my tables - I am fully blasphemous for not having them, or does it really matter that much?
UPDATE
+1 to invisal, who pointed out that queries are automatically wrapped as transactions, which I did not know. Pointed out multiple good references on the subject of my question.
This made a lot of sense when one is doing multiple updates, for
example, in multiple tables in one go. But basically all of my queries
just update one table at a time. If a query errors, it cancels,
transaction or no transaction.
In your case, it does nothing. A single statement has its own transaction itself. For more information you can read the existed question and answers:
What does a transaction around a single statement do?
Transaction necessary for single update query?
Do i need transaction for joined query?
Most important property of the database is to keep your data, reliably.
Database reliability is assured by conforming to ACID principles (Atomicity, Consistency, Isolation, Durability). In the context of databases, a single logical operation on the data is called a transaction. Without transactions, such reliability would not be possible.
In addition to reliability, using transactions properly lets you improve performance of some data operations considerably. For example, you can start transaction, insert a lot of data (say 100k rows), and only then commit. Server does not have to actually write to disk until commit is called, effectively batching data in memory. This allows to improve performance a lot.
You should be aware that every updating action against your database is performed inside a transaction, even if only 1 table (SQL server automatically creates a transaction for it).
The reason for always doing transactions is to ensure ACID as others have mentioned. Here I'd like to elaborate on the isolation point. Without transaction isolation, you may have problems with: read uncommitted, unrepeatable read, phantom read,..
it depends if you are updating one table and one row, then the only advantage is going to be in the logging... but if you update multiple row in a table at one time... without transactions you could still run into somecurruption
Well it depends, SQL is most of the times used for supporting data for some host languages like c, c++, java, php, c# and others. Well I have not worked with much technologies.. but if you are using following combinations then here is my point of view:
SQL with C / C++ : Commit Required
SQL with Java : Not Required
SQL with C# : Not Required
SQL with PHP : Not Required
And it also depends which SQL you are using. It would also depend from different flavors of SQL like Oracle SQL, SQL Server, SQLite, MySQL etc...
When you are using Oracle SQL in its console, like Oracle 11g, Oracle 10g etc... COMMIT is required.
And as far as corruption of table and data is concerned. YES it happens, I had a very bad experience with it. So, if you pull out your wire or something while you are updating in your table, then you might end up with a massive disaster.
Well concluding, I will suggest you to do commit.

Transferring data from one SQL table layout to a 'new & improved' one

The project I work on has undergone a transformation at the database level. For the better, about 40% of the SQL layout has been changed. Some columns were eliminated, others moved. I am now tasked with developing a data migration strategy.
What migration methods, even tools are available so that I don't have to figure out each every individual dependency and manually script a key change when their IDs (for instance) change.
I realize this question is a bit obtuse and open ended, but I assume others have had to do this before and I would appreciate any advice.
I'm on MS SQL Server 2008
#OMG Ponies Not obtuse but vague:
Great point. I guess this helps me reconsider what I am asking, at least make it more specific. How do you insert from multiple tables to multiple tables keeping the relationships established by the foreign keys intact? I now realize I could drop the ID key constraint during the insert and re-enable it after, but I guess I have to figure out what depends on what myself and make sure it goes smoothly.
I'll start there, but will leave this open in case anyone else has other recommendation.
You should create an upgrade script that morphs the current schema into the v. next schema, applying appropriate operations (alter table, select into, update, delete etc). While this may seem tedious, is the only process that will be testable: start from a backup of the current db, apply the upgrade script, test the result db for conformance with the desired schema. You can test and debug your upgrade script until is hammered into correctness. You can test it on a real data size so that you get a correct estimate of downtime due to size-of-data operations.
While there are out there tools that can copy data or transforms schema(s) (like SQL Compare) I believe approaching this as a development project, with a script deliverable that can be tested repeatedly and validated, is a much saner approach.
In future you can account for this upgrade step in your development and start with it, rather than try to squeeze it in at the end.
there are tons of commercial tools around that claim to solve this -> i wouldn't buy that...
I think your best bet is to model domain classes that represent your data and write adapters that read in/serialize to the old/new schemas.
If you haven't got a model of your domain, you should build one now.
ID's will change, so ideally they should not carry any meaning to user's of your database.

Dynamic patching of databases

Please forgive my long question. I have an idea for a design that I could use some comments on. Is it a good idea to do this? And what are the pit falls I should be aware of? Are there other similar implementations that are better?
My situation is as follows:
I am working on a rewrite of a windows forms application that connects to a SQL 2008 (earlier it was SQL 2005) server. The application is an "expert-system" for an engineering company where we store structured data about constructions. We have control of all installations of the client software, we have no external customers or users, they are all internal to the company, and they are all be trusted not to do anything malicious to the software or database.
The current design doesn't have too many tables (about 10 - 20) but some of them have millions of records that belong to several hundred constructions. The systems performance has been ok so far, but it is starting to degrade as we are pushing the limits of the design.
As part of the rewrite I am considering splitting the database into one master database and several "child" databases where each describes one construction. Each child database should be of identical design. This should eliminate the performance problems we are seeing today since the data stored in each database would be less than one percent of the total data amount.
My concern is that instead of maintaining one database we will now get hundreds of databases that must be kept up to date. The system is constantly evolving as the companys requirements change (you know how it is), and while we try to look forward to reduce the number of changes the changes will come. So we will need a system where we keep track of all database changes done to the system so they can be applied to the child databases. Updating the client application won't be a problem, we have good control of that aspect.
I am thinking of a change tracing system where we store database scripts for all changes in a table in the master database. We can then give each change a version number and we can store a current version number in each child database. When the client program connects to a child database we can then check the version number of the database against the current version number of the master database and if there are patches with version numbers greater than the version number of the child database we run these and update the child database to the latest version.
As I see it this should work well. Any changes to the system will first be tested and validated before committed as a new version of the database. The change will then be applied to the database the first time a user opens it. I suppose we would open the database in exclusive mode while applying the changes, but as long as the changes aren't too frequent this should not be a problem.
So what do you think? Will this work? Have any of you done something similar? Should we scrap the solution and go for the monolithic system instead?
Have you considered partitioning your large tables by 'construction'? This could alleviate some of the growing pains by splitting the storage for the tables across files/physical devices without needing to change your application.
Adding spindles (more drives) and performing a few hours of DBA work can often be cheaper than modifying/adapting software.
Otherwise, I'd agree with #heikogerlach and these similar posts:
How do I version my ms sql database
Mechanisms for tracking DB schema changes
How do you manage databases in development, test and production?
I have a similar situation here, though I use MySQL. Every database has a versions table that contains the version (simply an integer) and a short comment of what has changed in this version. I use a script to update the databases. Every database change can be in one function or sometimes one change is made by multiple functions. Functions contain the version number in the function name. The script looks up the highest version number in a database and applies only the functions that have a higher version number in order.
This makes it easy to update databases (just add new change functions) and allows me to quickly upgrade a recovered database if necessary (just run the script again).
Even when testing the changes before this allows for defensive changes. If you make some heavy changes on a table and you want to play it safe:
def change103(...):
"Create new table."
def change104(...):
"""Transfer data from old table to new table and make
complicated changes in the process.
"""
def change105(...):
"Drop old table"
def change106(...):
"Rename new table to old table"
if in change104() is something going wrong (and throws an exception) you can simply delete the already converted data from the new table, fix your change function and run the script again.
But I don't think that changing a database dynamically when a client connects is a good idea. Sometimes changes can take some time. And the software that accesses a database should match the schema of the database. You have somehow to keep them in sync. Maybe you could distribute a new software version and then you want to upgrade the database when a client is actually starting to use this new software. But I haven't tried that.
Better don't create additional databases. At first glance you may think that you'll get some performance gain, but actually you get support nightmare. Remember - what can break, does break sooner or later.
It is way simpler to perform and optimize queries in single database. It is much easier manage user permissions in single database. It is much easier to make consistent backups for single database.
Like KenG said, if you need break your large tables - consider partitioning them. And add some drives :)
But at first run SQL profiler on your database and optimize indexes and queries. Several million rows is usually not a big problem to handle (unless your customer needs live totaling over half of these, in which case no partitioning can help).
I know that this is a crazy answer but here it goes...
I currently have a similar scenario where I need to keep control of database versions in multiple locations for a system using MS SQL Server.
What I am doing now is using Ruby on Rails ActiveRecord Migrations to keep control of database versions. Yes I know that we are talking about Windows systems but this works fine for me. (By the way, my system is programmed in VB and .NET)
I have installed Rails on each server, when I need to update the database schema I copy the migration files to the server and run rake db:migrate which updates the database to the latest version or rollbacks it to a desired version.
As a side effect you will have a set of migration files for your database schema in an database independent language (in this case ruby) that you can apply to other database engines and that you can put under source control too.
I know that this is a strange solution in which a totally different technology is used but it does not hurt to learn new approaches. You can find additional information here.
I have become a better .Net programmer since I learned Ruby on Rails. I asked here before a question about this approach.

Refactoring "extreme" SQL queries

I have a business user who tried his hand at writing his own SQL query for a report of project statistics (e.g. number of tasks, milestones, etc.). The query starts off declaring a temp table of 80+ columns. There are then almost 70 UPDATE statements to the temp table over almost 500 lines of code that each contain their own little set of business rules. It finishes with a SELECT * from the temp table.
Due to time constraints and 'other factors', this was rushed into production and now my team is stuck with supporting it. Performance is appalling, although thanks to some tidy up it's fairly easy to read and understand (although the code smell is nasty).
What are some key areas we should be looking at to make this faster and follow good practice?
First off, if this is not causing a business problem, then leave it until it becomes a problem. Wait until it becomes a problem, then fix everything.
When you do decide to fix it, check if there is one statement causing most of your speed issues ... issolate and fix it.
If the speed issue is over all the statements, and you can combine it all into a single SELECT, this will probably save you time. I once converted a proc like this (not as many updates) to a SELECT and the time to run it went from over 3 minutes to under 3 seconds (no shit ... I couldn't believe it). By the way, don't attempt this if some of the data is coming from a linked server.
If you don't want to or can't do that for whatever reason, then you might want to adjust the existing proc. Here are some of the things I would look at:
If you are creating indexes on the temp table, wait until after your initial INSERT to populate it.
Adjust your initial INSERT to insert as many of the columns as possible. There are probably some update's you can eliminate by doing this.
Index the temp table before running your updates. Do not create indexes on any of the columns targetted by the update statements until after their updated.
Group your updates if your table(s) and groupings allow for it. 70 updates is quite a few for only 80 columns, and sounds like there may be an opportunity to do this.
Good luck
First thing I would do is check to make sure there is an active index maintenance job being run periodically. If not, get all existing indexes rebuilt or if not possible at least get statistics updated.
Second thing I would do is set up a trace (as described here) and find out which statements are causing the highest number of reads.
Then I would run in SSMS with 'show actual execution plan' and tally the results with the trace. From this you should be able to work out whether there are missing indexes that could improve performance.
EDIT: If you are going to downvote, please leave a comment as to why.
Just like any refactoring, make sure you have an automated way to verify your refactorings after each change (you can write this yourself using queries which check the development output against a known good baseline). That way, you are always matching the known good data. This will give you a high degree of confidence in the correctness of your approach when you enter the phase where you are deciding whether to switch over to your new version of the process and want to run side by side for a few iterations to ensure correctness.
I also like to log all the test batches and the run times of the processes within the batch, so I can tell if some particular process within the batch was adversely affected at some point in time. I can get average times for processes and see trends of improvement or spot potential problems. This also lets me identify the low-hanging fruit within the batch where I can make the most improvement.
There are then almost 70 UPDATE
statements to the temp table over
almost 500 lines of code that each
contain their own little set of
business rules. It finishes with a
SELECT * from the temp table.
Actually this sounds like it can be followed and understood quite well, each update statement does one thing to the table with a specific purpose and set of business rules. I think that maintaining procedures of 500 lines of code with one or a couple of select statements that does "everything", built with 15 or so joins, and case statements etc scattered all over the place, is a lot harder to maintain. Although it would make for better performance..
It's a bit of a dilemma with SQL, that writing clear and concise code (using multiple updates, creating functions etc) always seems to have a big negative impact on performance. Trying to do everything at once, which is considered bad practice in other programming languages, seems to be the very core of set oriented languages.
If this is a report generating stored procedure, how often is it being run? If it's only necessary to run it once a day and is run during the night how much of an issue is the performance?
If it's not I'd recommend being careful in your choice to re-write it because there is a chance that you could muck up your figures.
Also it sounds like the sort of thing that should be pulled out into an SSIS package building up a new permanent table with the results so it only has to be run once.
Hope this makes sense
One thing you could try is to replace the temp table with a table variable. There are times when this is faster and times when it is not, you will have to just try it and see.
Look at the 70 update statements. It is possible to combine any of them? If the person writing did not use CASE statments, it might be possible to do fewer statements.
Other obvious things to look at - eliminate any cursors, change any subqueries to joins to tables or derived tables.
Rewrite perhaps. One hardware solution would be to make sure your database temp table goes on a 'fast' drive, perhaps a solid state disk (SSD), or can be managed all in memory.
My guess is this 'solution' was developed by someone with a grasp of and a dependency upon spreadsheets, someone who may not be very savvy on 'normalized' databases--how to construct and populate tables to retain data for reporting purposes, something which perhaps BI Business Intelligence software can be utilized with sophistication and yet be adaptable.
You didn't say 'where' the update process is being run. Is the update process being run as a SQL script from a separate computer (desktop) against the server where the data is? There can be significant bottlenecks and overhead created by that approach. If so, consider running the entire update process directly on the server as a local job, as a compiled stored procedure, bypassing the network and (multiple) cursor management overhead. It could have a scheduled time to run and a controlled priority, completing in off peak business data usage hours.
Evaluate how often 'commit' statements are really needed for the sequence of update statements...saving on a bunch of commit lines could notably improve the overall update time. There may be a couple of settings in the database client driver software which can make a notable difference.
Can the queries used for update conditions be factored out as static 'views' which in turn can be shared across multiple update statements? Views can keep in memory data/query rows frequently accessed. There may be performance tuning in determining how much update data can be pended before a commit is optimal.
It might be worth evaluating whether Triggers could be used to replace the batch job update sequence. You don't say from how many tables the data used comes from...that might help with decision making. I don't know if you have the option of adding triggers to the database tables from which the data is gathered. If so, adding a few triggers to a number of tables wouldn't really degrade overall system performance much, but might save a big wad of time on that update process. You could try replacing the update statements one at a time with triggers and see if the results are the same as before. Create a similar temp table, based on the same update process, then carefully test whether triggers feeding updates to the temp table could replace individual update statements. Perhaps you may have a sort of 'Data Warehouse' application. It might be useful to review how to set up a 'star' schema of tables to retain summarized business data for reporting.
Creating a comprehensive and cached 'view' which updates via the queries once per day, reflecting the updates might be another approach to explore.
Well, since the only thing you've told us about this stored procedure is that it has a 80+ column temp table, the only thing I can recommend is to remove that table, and rewrite the rest to remove the need for it.
You should get a tool that allows you to get an explain plan of all queries your app will run. It is the best bang for the buck on an SQL heavy app for performace increases. If you read and react to what the Explain Plan is telling you. If you are on Oracle what we used to use was TOAD by Qwest(?) I think. It was a great tool.
I would recommend looking at the tables involved, the end result, and starting from scratch to see if the query can be done in a more efficient manner. Keep the query to verify that the new one is working exactly the same as the old one, but try to forget all methods used to obtain the end result.
I would rewrite it from scratch.
You say that you understand what it supposed to do so it should not be that difficult. And I bet that the requirements for that piece of code will keep changing so if you do not rewrite it now you may end up maintaining some ugly monster

Effectively transforming data from one SQL database to another in live environment

We have a bit of a messy database situation.
Our main back-office system is written in Visual Fox Pro with local data (yes, I know!)
In order to effectively work with the data in our websites, we have chosen to regularly export data to a SQL database. However the process that does this basically clears out the tables each time and does a re-insert.
This means we have two SQL databases - one that our FoxPro export process writes to, and another that our websites read from.
This question is concerned with the transform from one SQL database to the other (SqlFoxProData -> SqlWebData).
For a particular table (one of our main application tables), because various data transformations take places during this process, it's not a straightforward UPDATE, INSERT and DELETE statements using self-joins, but we're having to use cursors instead (I know!)
This has been working fine for many months but now we are starting to hit upon performance problems when an update is taking place (this can happen regularly during the day)
Basically when we are updating SqlWebData.ImportantTable from SqlFoxProData.ImportantTable, it's causing occasional connection timeouts/deadlocks/other problems on the live websites.
I've worked hard at optimising queries, caching etc etc, but it's come to a point where I'm looking for another strategy to update the data.
One idea that has come to mind is to have two copies of ImportantTable (A and B), some concept of which table is currently 'active', updating the non-active table, then switching the currenly actice table
i.e. websites read from ImportantTableA whilst we're updating ImportantTableB, then we switch websites to read from ImportantTableB.
Question is, is this feasible and a good idea? I have done something like it before but I'm not convinced it's necessarily good for optimisation/indexing etc.
Any suggestions welcome, I know this is a messy situation... and the long term goal would be to get our FoxPro application pointing to SQL.
(We're using SQL 2005 if it helps)
I should add that data consistency isn't particularly important in the instance, seeing as the data is always slightly out of date
There are a lot of ways to skin this cat.
I would attack the locking issues first. It is extremely rare that I would use CURSORS, and I think improving the performance and locking behavior there might resolve a lot of your issues.
I expect that I would solve it by using two separate staging tables. One for the FoxPro export in SQL and one transformed into the final format in SQL side-by-side. Then either swapping the final for production using sp_rename, or simply using 3 INSERT/UPDATE/DELETE transactions to apply all changes from the final table to production. Either way, there is going to be some locking there, but how big are we talking about?
You should be able to maintain one db for the website and just replicate to that table from the other sql db table.
This is assuming that you do not update any data from the website itself.
"For a particular table (one of our main application tables), because various data transformations take places during this process, it's not a straightforward UPDATE, INSERT and DELETE statements using self-joins, but we're having to use cursors instead (I know!)"
I cannot think of a case where I would ever need to perform an insert, update or delete using a cursor. If you can write the select for the cursor, you can convert it into an insert, update or delete. You can join to other tables in these statements and use the case stament for conditional processing. Taking the time to do this in a set -based fashion may solve your problem.
One thing you may consider if you have lots of data to move. We occassionally create a view to the data we want and then have two tables - one active and one that data will be loaded into. When the data is finsihed loading, as part of your process run a simple command to switch the table the view uses to the one you just finshed loading to. That way the users are only down for a couple of seconds at most. You won't create locking issues where they are trying to access data as you are loading.
You might also look at using SSIS to move the data.
Do you have the option of making the updates more atomic, rather than the stated 'clear out and re-insert'? I think Visual Fox Pro supports triggers, right? For your key tables, can you add a trigger to the update/insert/delete to capture the ID of records that change, then move (or delete) just those records?
Or how about writing all changes to an offline database, and letting SQL Server replication take care of the sync?
[sorry, this would have been a comment, if I had enough reputation!]
Based on your response to Ernie above, you asked how you replicate databases. Here is Microsoft's how-to about replication in SQL2005.
However, if you're asking about replication and how to do it, it indicates to me that you are a little light in experience for SQL server. That being said, it's fairly easy to muck things up and while I'm all for learning by experience, if this is mission critical data, you might be better off hiring a DBA or at the very least, testing the #$##$% out of this before you actually implement it.