I am trying to use region monitoring for my app, but I am trying to use it with accuracy on the order of what building in a given city area the user is in.
Reading through other articles here on region monitoring, I have gotten a bunch of conflicting arguments on the accuracy of the system. Now, at the end of 2012, what is the accuracy like?
From my own testing it seems to be checking me into locations that are a few dozen meters away from where I am, which is too granular for my needs. I need to know if this is an issue with region monitoring or just my implementation.
Thanks, and I hope this question isn't too much of a repetition of other ones, but the dates of those questions and responses makes getting the current answer confusing.

Related

Software Metrics in Agile Methodologies [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
Agile methodologies are rather prevalent these days, but I cannot seem to find much documentation on what metrics are most useful and why. I have found many more things saying that some traditional metrics like LOC and code coverage of tests are not appropriate, leaving two main questions:
Why are those two (and other) metrics inappropriate?
What metrics are best for Agile and why?
Even with an Agile process, wouldn't you want to know how much code coverage you have with your unit tests? Or is it simply that this metric (and others) just are not as useful as other metrics like cyclomatic complexity and velocity?
Agile is a business oriented thing, Agile is about maximizing the customer value while minimizing waste to provide the most optimal ROI. This is what should get measured. And to do so, I use the system that Mary Poppendieck recommends. This system is based on three holistic measurements that must be taken as a package:
Cycle time
From product concept to first release or
From feature request to feature deployment or
From bug detection to resolution
Business Case Realization (without this, everything else is irrelevant)
P&L or
ROI or
Goal of investment
Customer Satisfaction
e.g. Net Promoter Score
Sure, at the team level you can track things like test coverage, cyclomatic complexity, conformance to coding standards, etc, but high quality is not an end in itself, it's just a mean. Don't misinterpret me, I'm not saying high quality doesn't matters, high quality is mandatory to achieve sustainable pace (and we include "no increase of the technical debt" in our Definition of Done) but still, the goal is to deliver value to the customer in a fast and profitable way.
Irrespective of methodology, there are some basic metrics that can and should be used.
According to S. Kahn, the most important are the following three:
size of product
number of defects found in final phase of testing
and number of defects found in the field.
If those are all you track, there's at least five ways they can be used:
calculate product defect rate (A)
calculate test defect rate (B)
determine a desirable goal for A and monitor the performance
determine a desirable goal for B and monitor the performance
assess correlation between A and B
if correlation is found, form metric of test effectiveness (B/A * 100%)
Although not necessarily fun to read, Metrics and Models of Software Quality Engineering provides an excellent in-depth software engineering and metrics overview.
1.1) LOC are easy to answer
They are really dependent of the language you use! The same feature might have a big difference when written on JAVA or on Ruby, for example
A not well written software might have more lines than a good one!
1.2) Code coverage
IMHO you should use metric, although its not perfect, it should give you a nice understanding on where your code needs more tests.
Just one point you should take care here is that it is also dependent of the language. There could be some situations where you have a class or method that you really don't need to test! For example a class with only getters and setters.
2) From (1) you just mentioned code metrics, but judging from your question about velocity, you are interested on metrics on all the creation process, so I would list some:
Velocity: The classic one and, if used well, it can enhance quite well an agile team performance, since you will know what your team can really do on a fixed time.
Burn up and burn down charts : they can give you a good notion about how the team is performing during the interaction (sprint)
There are some articles on InfoQ about this. Here and here.
As for question 1, I don't see any reason those metrics would be bad in an Agile process.
LOC provides you with a relative size measurement. While it may not always be useful to compare numbers between projects, it can provide you with a rate of growth within the project. If you can get it, the number of lines changed within a sprint may be useful as well to track a rate or refactoring.
Code coverage (of lines of code) gives you a general sense of whether or not your team is meeting a minimum bar of automated testing within a project.
As for question 2, keep the items above and here are a few more:
LOC versus test count. If you can, maintain separate ratios for unit, integration and system tests.
Average number of acceptance criteria versus test scenarios (or tests) for each story. It can help provide a better sense of whether or not your testing against the story's intent.
Number of defects discovered
Amount of work discovered (this is often captured by Agile tracking software) that wasn't part original estimates. It will help you judge if you are doing 'enough' planning.
Tracking consistencies, or lack thereof, of velocity sprint to sprint
While probably not popular and probably potentially dangerous, tracking estimates to work completed for each developer. While teams are supposed to be self organized and driven, not all teams are capable of dealing with human problems.
Just to add
Why LOC and Code Coverage of Tests are less than ideal:
Agile emphasizes outcome, not output (see Agile Manifesto). These two simply track output. Also, they do not properly measure refactoring, which is a vital aspect of Agile processes.
Another metric to consider would be Running Tested Features. I can't describe any better than this: http://xprogramming.com/articles/jatrtsmetric/
I'm going to answer to this very old question...
LOC and Test coverage are, in my opinion, good metrics, but they have one big problem: if you push them, you can make them grow fastly, but the result will be terryifing: tons of nonsense code, or in the test coverage, you can invoque all your code in a try-catch block and not write one single assert... Or even worse, just write one for "compliance" reasons, but without any business-facing or code-facing meaning...
So, these kind of metrics are very good if they help the team to honestly evaluate their outcome, but are an evil tool if they form part of some "compliance" rules, as using them in that way causes more harm (dead code, bad tests!) than what you originally wanted to achieve.
So, with every metric, think how you would trick it if you were forced to achieve a certain value, and think of the consequences... This is not an issue of LOC or test coverage, many other metrics can have similar outcome, even cyclomatic complexity... If you divide your code in a bad manner, you can reduce cyclomatic complexity, but it doesn't mean you get better or more readable code!
So, these kind of metrics are quite good to see what's happening inside a team, but any measure you take should be based on concrete goals, not on the metric itself... For example:
Test coverage is low: you implement coding dojos once a month to help train people to write testable code, you find out what code has the worst test coverage and try to implement a better / more testable architecture that helps / motivates developers to write test, etc.
As you can see, you never tell the team to achieve a certain value of test coverage, you just use the metric to see where you can improve and then look for measures that benefit your process, after a time you would expect test coverage to increase, but you are not pushing people to do so! You are evaluating changes in order to see if the measures are helping. If after a time you find out that test coverage has not changed with your measures, then it's time to look for other ideas, and so on...

Is using a geographically distributed development team a better approach for running a software startup?

It's commonly agreed that successful software development is as much about teamwork and communication as it is about individual programming expertise. Given this, one might assume that by operating a geographically distributed team you are at an immediate disadvantage to a tight-knit team all working locally.
When my startup company was founded, we couldn't afford shared office space and I was actually located in a different city to the rest of the team, so we all had to work remotely and use tools such as Basecamp, Skype and Trac to communicate. One the whole, this was really successful - we got a huge amount of quality work done in a short space of time and launched a successful product. Working remotely gave our developers the time and space they needed to focus on the job and be productive without having interruptions or enduring office politics. To me, this is a huge advantage.
Given my experience, as well as the success of software companies with distributed teams such as 37signals and StackOverflow (and I'm sure many more), I'm increasingly of the opinion that the advantages of running a distributed team outweighs those of running a centralised team, especially for start-up companies.
Would you agree?
Given my experience, as well as the
success of software companies with
distributed teams such as 37signals
and StackOverflow (and I'm sure many
more), I'm increasingly of the opinion
that the advantages of running a
distributed team outweighs those of
running a centralised team, especially
for start-up companies.
Would you agree?
I half agree.
Running a distributed team definitely has its disadvantages. As you pointed out in your own post, communication is a big problem. There are times, as a developer, I enjoy just bouncing ideas off other developers and swapping ideas that I may not have thought up on my own. In addition, it can be tough to get feedback or to perform code reviews (practices that I have found useful in my development experience).
With that said, I also think there is an advantage to a distributed team. The biggest of these being that developers tend to do better when they can focus and just develop and not have to worry about being interrupted or having to attend frequent meetings, etc. This was a huge advantage at one job I had at a smaller company.
In your specific situation, have you considered that one reason you were so successful was not because you were geographically dispersed, but you were successful because you're a small company? Small companies have an advantage in that you have a limited number of products, there tends to be more focus, and, as a result, you can maintain a better control over your products/schedules/etc.
That's my 2 cents.
I agree that offices are quite distracting due to noise and interruptions. But the distractions that hinder you are the other side of the coin to the ability to ask people around you questions. Although I've not tried remote working for more than a few days at a time, the inability to get an answer to a quick question in 30s is the main disadvantage that I see.
Like-for-like comparisons that might give us empirical data are very hard to do, arguably practically impossible. So that gives us the licence to speculate, right?
My pet theory is that any sufficiently talented and motivated team can make most any system, method, geographical dispersion work.
I totally agree. An office environment provides mainly distractions and opportunities to waste time and look busy. A distributed team doesn't have to pay rent, they can deduct part of their own rent or mortgage from their taxes, and they can recruit talent from virtually anywhere in the world (instead of trying to find capable RoR developers in East Bumwipe, Oklahoma).
Are you a regular reader of Joel Spolsky's blog?
Joel described the centralized offices they have set up in order to increase productivity.
More than enough room for each developer, so they can walk up and down for a while whenever a bug haunts one of them. :)
Separated offices. During work hours, only the developer and the given task exist. Nothing else.
Sound-proof walls. (As far as I can remember.) Generally useful to provide full control over work space. Devs can listen to music without headphones, for example.
As you can see, FogCreek has managed to combine most advantages of remote work, while still keeping live communication as an option.
However, due to lack of teleportation, this customized and professional office is yet to solve the problem of different world-wide locations.
From personal experience I am much more productive when working remotely. I lose the sense that someone is staring over my shoulder, criticizing me for being lazy when I'm really just taking a moment to collect my thoughts.
I also appreciate not having a commute, even if I'm only saving 20 minutes each way it's a huge load off of my back, plus I don't have to dress to be in the office so I save time getting ready in the morning.
I've found that it's fairly easy to mitigate the communication issues by implementing a certain time during the day to be online, we had people on the east and west coast so we had people stay online between 1-4p EST. Also, just making sure that everyone has each other's phone numbers was a good thing, there were many problems that could be resolved with a quick phone call.
I wish that more businesses would support remote developers, I'm in an office right now and I feel that being here is so wasteful. I could get more done in less time without the distractions involved, and would have a better ability to manage my time.
Pros: You can hire the person you like instead of sticking with those available in the neighborhood.
Cons: It can be difficult to communicate if your team members live in various time zones.
I think a start up works best if the core team are physically close in space. As the team grows and the product and processes matures remote work gains traction in my experience. During that critical first year there can't be too much communication between developers and founders.
Once the startup has real direction and good processes in place remote working becomes very effective.
Certainly having some developers working remotely saves real money in overhead costs and makes everyone happy if its possible.
In my startup a lot of our work requires direct physical interaction with expensive equipment, so we can't all be virtual. Some of us can, and our remote developers are good contributors.
I've been working for US based companies from my country for about 4 years (as of Feb 2014). The experience has been very rewarding, and I feel now absolutely comfortable doing my job remotely, but there is a learning curve that needs to be endured, which cannot be overlooked. There are so many subtleties to communication that suddenly get lost when chatting over skype or sending emails. A whole level of information brought by body language and the sheer empathy that comes from knowing personally the person you're dealing with. Over time, you learn strategies around that, but there's no denial that it is a learning process.
Also, even though sometimes having the team working on the same office is perceived as distraction-prone, in my view, it also fosters a more dynamic environment, where ideas flow more freely and faster. It also encourages a "team-attitude" towards problem solving, which is great for consistency.
I think the best approach, whenever possible, is having a bit of both - work a few days from home, so people can focus and self organize their time, and then work a few days on the same office so that they are still part of a team, instead of islands in isolation.

What statistics concepts are useful for profiling?

I've been meaning to do a little bit of brushing up on my knowledge of statistics. One area where it seems like statistics would be helpful is in profiling code. I say this because it seems like profiling almost always involves me trying to pull some information from a large amount of data.
Are there any subjects in statistics that I could brush up on to get a better understanding of profiler output? Bonus points if you can point me to a book or other resource that will help me understand these subjects better.
I'm not sure books on statistics are that useful when it comes to profiling. Running a profiler should give you a list of functions and the percentage of time spent in each. You then look at the one that took the most percentage wise and see if you can optimise it in any way. Repeat until your code is fast enough. Not much scope for standard deviation or chi squared there, I feel.
All I know about profiling is what I just read in Wikipedia :-) but I do know a fair bit about statistics. The profiling article mentioned sampling and statistical analysis of sampled data. Clearly statistical analysis will be able to use those samples to develop some statistical statements on performance. Let's say you have some measure of performance, m, and you sample that measure 1000 times. Let's also say you know something about the underlying processes that created that value of m. For instance, if m is the SUM of a bunch of random variates, the distribution of m is probably normal. If m is the PRODUCT of a bunch of random variates, the distribution is probably lognormal. And so on...
If you don't know the underlying distribution and you want to make some statement about comparing performance, you may need what are called non-parametric statistics.
Overall, I'd suggest any standard text on statistical inference (DeGroot), a text that covers different probability distributions and where they're applicable (Hastings & Peacock), and a book on non-parametric statistics (Conover). Hope this helps.
Statistics is fun and interesting, but for performance tuning, you don't need it. Here's an explanation why, but a simple analogy might give the idea.
A performance problem is like an object (which may actually be multiple connected objects) buried under an acre of snow, and you are trying to find it by probing randomly with a stick. If your stick hits it a couple of times, you've found it - it's exact size is not so important. (If you really want a better estimate of how big it is, take more probes, but that won't change its size.) The number of times you have to probe the snow before you find it depends on how much of the area of the snow it is under.
Once you find it, you can pull it out. Now there is less snow, but there might be more objects under the snow that remains. So with more probing, you can find and remove those as well. In this way, you can keep going until you can't find anything more that you can remove.
In software, the snow is time, and probing is taking random-time samples of the call stack. In this way, it is possible to find and remove multiple problems, resulting in large speedup factors.
And statistics has nothing to do with it.
Zed Shaw, as usual, has some thoughts on the subject of statistics and programming, but he puts them much more eloquently than I could.
I think that the most important statistical concept to understand in this context is Amdahl's law. Although commonly referred to in contexts of parallelization, Amdahl's law has a more general interpretation. Here's an excerpt from the Wikipedia page:
More technically, the law is concerned
with the speedup achievable from an
improvement to a computation that
affects a proportion P of that
computation where the improvement has
a speedup of S. (For example, if an
improvement can speed up 30% of the
computation, P will be 0.3; if the
improvement makes the portion affected
twice as fast, S will be 2.) Amdahl's
law states that the overall speedup of
applying the improvement will be
I think one concept related to both statistics and profiling (your original question) that is very useful and used by some (you see the technique advised from time to time) is while doing "micro profiling": a lot of programmers will rally and yell "you can't micro profile, micro profiling simply doesn't work, too many things can influence your computation".
Yet simply run n times your profiling, and keep only x% of your observations, the ones around the median, because the median is a "robust statistic" (contrarily to the mean) that is not influenced by outliers (outliers being precisely the value you want to not take into account when doing such profiling).
This is definitely a very useful statistician technique for programmers who want to micro-profile their code.
If you apply the MVC programming method with PHP this would be what you need to profile:
Application:
Controller Setup time
Model Setup time
View Setup time
Database
Query - Time
Cookies
Name - Value
Sessions
Name - Value

Profiling a VxWorks system

We've got a fairly large application running on VxWorks 5.5.1 that's been developed and modified for around 10 years now. We have some simple home-grown tools to show that we are not using too much memory or too much processor, but we don't have a good feel for how much headroom we actually have. It's starting to make it difficult to do estimates for future enhancements.
Does anybody have any suggestions on how to profile such a system? We've never had much luck getting the Wind River tools to work.
For bonus points: the other complication is that our system has very different behaviors at different times; during start-up it does a lot of stuff, then it sits relatively idle except for brief bursts of activity. If there is a profiler with some programmatic way to have to record state information, I think that'd be very useful too.
FWIW, this is compiled with GCC and written entirely in C.
I've done a lot of performance tuning of various kinds of software, including embedded applications. I won't discuss memory profiling - I think that is a different issue.
I can only guess where the "well-known" idea originated that to find performance problems you need to measure performance of various parts. That is a top-down approach, similar to the way governments try to control budget waste, by subdividing. IMHO, it doesn't work very well.
Measurement is OK for seeing if what you did made a difference, but it is poor at telling you what to fix.
What is good at telling you what to fix is a bottom-up approach, in which you examine a representative sample of microscopic units of what is being spent, and finding out the full explanation of why each one is being spent. This works for a simple statistical reason. If there is a reason why some percent (for example 40%) of samples can be saved, on average 40% of samples will show it, and it doesn't require a huge number of samples. It does require that you examine each sample carefully, and not just sort of aggregate them into bigger bunches.
As a historical example, this is what Harry Truman did at the outbreak of the U.S. involvement in WW II. There was terrific waste in the defense industry. He just got in his car, drove out to the factories, and interviewed the people standing around. Then he went back to the U.S. Senate, explained what the problems were exactly, and got them fixed.
Maybe this is more of an answer than you wanted. Specifically, this is the method I use, and this is a blow-by-blow example of it.
ADDED: I guess the idea of finding-by-measuring is simply natural. Around '82 I was working on an embedded system, and I needed to do some performance tuning. The hardware engineer offered to put a timer on the board that I could read (providing from his plenty). IOW he assumed that finding performance problems required timing. I thanked him and declined, because by that time I knew and trusted the random-halt technique (done with an in-circuit-emulator).
If you have the Auxiliary Clock available, you could use the SPY utility (configurable via the config.h file) which does give you a very rough approximation of which tasks are using the CPU.
The nice thing about it is that it does not require being attached to the Tornado environment and you can use it from the Kernel shell.
Otherwise, btpierre's suggestion of using taskHookAdd has been used successfully in the past.
I've worked on systems that have had luck using locally-built monitoring utilities based on taskSwitchHookAdd and related functions (delete hook, etc).
"Simply" use this to track the number of ticks a given task runs. I realize that this is fairly gross scale information for profiling, but it can be useful depending on your needs.
To see how much cpu% each task is using, calculate the percentage of ticks assigned to each task.
To see how much headroom you have, add a lowest priority "idle" task that just does "while(1){}", and see how much cpu% it is assigned to it. Roughly speaking, that's your headroom.

What are the most useful software development metrics? [closed]

As it currently stands, this question is not a good fit for our Q&A format. We expect answers to be supported by facts, references, or expertise, but this question will likely solicit debate, arguments, polling, or extended discussion. If you feel that this question can be improved and possibly reopened, visit the help center for guidance.
Closed 10 years ago.
I would like to track metrics that can be used to improve my team’s software development process, improve time estimates, and detect special case variations that need to be addressed during the project execution.
Please limit each answer to a single metric, describe how to use it, and vote up the good answers.
(source: osnews.com)
ROI.
The total amount of revenue brought in by the software minus the total amount of costs to produce the software. Breakdown the costs by percentage of total cost and isolate your poorest performing and most expensive area in terms of return-on-investment. Improve, automate, or eliminate that problem area if possible. Conversely, find your highest return-on-investment area and find ways to amplify its effects even further. If 80% of your ROI comes from 20% of your cost or effort, expand that particular area and minimize the rest by comparison.
Costs will include payroll, licenses, legal fees, hardware, office equipment, marketing, production, distribution, and support. This can be done on a macro level for a company as whole or a micro level for a team or individual. It can also be applied to time, tasks, and methods in addition to revenue.
This doesn't mean ignore all the details, but find a way to quantify everything and then concentrate on the areas that yield the best (objective) results.
Inverse code coverage
Get a percentage of code not executed during a test. This is similiar to what Shafa mentioned, but the usage is different. If a line of code is ran during testing then we know it might be tested. But if a line of code has not been ran then we know for sure that is has not been tested. Targeting these areas for unit testing will improve quality and takes less time than auditing the code that has been covered. Ideally you can do both, but that never seams to happen.
"improve my team’s software development process": Defect Find and Fix Rates
This relates to the number of defects or bugs raised against the number of fixes which have been committed or verified.
I'd have to say this is one of the really important metrics because it gives you two things:
1. Code churn. How much code is being changed on a daily/weekly basis (which is important when you are trying to stabilize for a release), and,
2. Shows you whether defects are ahead of fixes or vice-versa. This shows you how well the development team is responding to defects raised by the QA/testers.
A low fix rate indicates the team is busy working on other things (features perhaps). If the bug count is high, you might need to get developers to address some of the defects.
A low find rate indicates either your solution is brilliant and almost bug free, or the QA team have been blocked or have another focus.
Track how long is takes to do a task that has an estimate against it. If they were well under, question why. If they are well over, question why.
Don't make it a negative thing, it's fine if tasks blow out or were way under estimated. Your goal is to continually improve your estimation process.
Track the source and type of bugs that you find.
The bug source represents the phase of development in which the bug was introduced. (eg. specification, design, implementation etc.)
The bug type is the broad style of bug. eg. memory allocation, incorrect conditional.
This should allow you to alter the procedures you follow in that phase of development and to tune your coding style guide to try to eliminate over represented bug types.
Velocity: the number of features per given unit time.
Up to you to determine how you define features, but they should be roughly the same order of magnitude otherwise velocity is less useful. For instance, you may classify your features by stories or use cases. These should be broken down so that they are all roughly the same size. Every iteration, figure out how many stories (use-cases) got implemented (completed). The average number of features/iteration is your velocity. Once you know your velocity based on your feature unit you can use it to help estimate how long it will take to complete new projects based on their features.
[EDIT] Alternatively, you can assign a weight like function points or story points to each story as a measure of complexity, then add up the points for each completed feature and compute velocity in points/iteration.
Track the number of clones (similar code snippets) in the source code.
Get rid of clones by refactoring the code as soon as you spot the clones.
Average function length, or possibly a histogram of function lengths to get a better feel.
The longer a function is, the less obvious its correctness. If the code contains lots of long functions, it's probably a safe bet that there are a few bugs hiding in there.
number of failing tests or broken builds per commit.
interdependency between classes. how tightly your code is coupled.
Track whether a piece of source has undergone review and, if so, what type. And later, track the number of bugs found in reviewed vs. unreviewed code.
This will allow you to determine how effectively your code review process(es) are operating in terms of bugs found.
If you're using Scrum, the backlog. How big is it after each sprint? Is it shrinking at a consistent rate? Or is stuff being pushed into the backlog because of (a) stuff that wasn't thought of to begin with ("We need another use case for an audit report that no one thought of, I'll just add it to the backlog.") or (b) not getting stuff done and pushing it into the backlog to meet the date instead of the promised features.
http://cccc.sourceforge.net/
Fan in and Fan out are my favorites.
Fan in:
How many other modules/classes use/know this module
Fan out:
How many other modules does this module use/know
improve time estimates
While Joel Spolsky's Evidence-based Scheduling isn't per se a metric, it sounds like exactly what you want. See http://www.joelonsoftware.com/items/2007/10/26.html
I especially like and use the system that Mary Poppendieck recommends. This system is based on three holistic measurements that must be taken as a package (so no, I'm not going to provide 3 answers):
Cycle time
From product concept to first release or
From feature request to feature deployment or
From bug detection to resolution
Business Case Realization (without this, everything else is irrelevant)
P&L or
ROI or
Goal of investment
Customer Satisfaction
e.g. Net Promoter Score
I don't need more to know if we are in phase with the ultimate goal: providing value to users, and fast.
number of similar lines. (copy/pasted code)
improve my team’s software development process
It is important to understand that metrics can do nothing to improve your team’s software development process. All they can be used for is measuring how well you are advancing toward improving your development process in regards to the particular metric you are using. Perhaps I am quibbling over semantics but the way you are expressing it is why most developers hate it. It sounds like you are trying to use metrics to drive a result instead of using metrics to measure the result.
To put it another way, would you rather have 100% code coverage and lousy unit tests or fantastic unit tests and < 80% coverage?
Your answer should be the latter. You could even want the perfect world and have both but you better focus on the unit tests first and let the coverage get there when it does.
Most of the aforementioned metrics are interesting but won't help you improve team performance. Problem is your asking a management question in a development forum.
Here are a few metrics: Estimates/vs/actuals at the project schedule level and personal level (see previous link to Joel's Evidence-based method), % defects removed at release (see my blog: http://redrockresearch.org/?p=58), Scope creep/month, and overall productivity rating (Putnam's productivity index). Also, developers bandwidth is good to measure.
Every time a bug is reported by the QA team- analyze why that defect escaped unit-testing by the developers.
Consider this as a perpetual-self-improvement exercise.
I like Defect Resolution Efficiency metrics. DRE is ratio of defects resolved prior to software release against all defects found. I suggest tracking this metrics for each release of your software into production.
Tracking metrics in QA has been a fundamental activity for quite some time now. But often, development teams do not fully look at how relevant these metrics are in relation to all aspects of the business. For example, the typical tracked metrics such as defect ratios, validity, test productivity, code coverage etc. are usually evaluated in terms of the functional aspects of the software, but few pay attention to how they matter to the business aspects of software.
There are also other metrics that can add much value to the business aspects of the software, which is very important when an overall quality view of the software is looked at. These can be broadly classified into:
Needs of the beta users captured by business analysts, marketing and sales folks
End-user requirements defined by the product management team
Ensuring availability of the software at peak loads and ability of the software to integrate with enterprise IT systems
Support for high-volume transactions
Security aspects depending on the industry that the software serves
Availability of must-have and nice-to-have features in comparison to the competition
And a few more….
Code coverage percentage
If you're using Scrum, you want to know how each day's Scrum went. Are people getting done what they said they'd get done?
Personally, I'm bad at it. I chronically run over on my dailies.
Perhaps you can test CodeHealer
CodeHealer performs an in-depth analysis of source code, looking for problems in the following areas:
Audits Quality control rules such as unused or unreachable code,
use of directive names and
keywords as identifiers, identifiers
hiding others of the same name at a
higher scope, and more.
Checks Potential errors such as uninitialised or unreferenced
identifiers, dangerous type casting,
automatic type conversions, undefined
function return values, unused
assigned values, and more.
Metrics Quantification of code properties such as cyclomatic
complexity, coupling between objects
(Data Abstraction Coupling), comment
ratio, number of classes, lines of
code, and more.
Size and frequency of source control commits.