I have to calculate all the invoices which have been paid in the first 'N' days of a month. I have two tables
. INVOICE: it has the invoice information. The only field which does matter is called 'datePayment'
. HOLYDAYS: It is a one column table. Entries at this table are of the form "2009-01-01",
2009-05-01" and so on.
I should consider also Saturdays and Sundays
(this might be not a problem because I could insert those days at the Hollidays table in order to consider them as hollidays if neccesary)
The problem is to calculate which is the 'payment limit'.
select count(*) from invoice
where datePayment < PAYMENTLIMIT
My question is how to calculate this PAYMENTLIMIT. Where PAYMENTLIMIT is 'the fifth working day of every month'.
The query should be run under Mysql and Oracle therefore standard SQL should be used.
Any hint?
EDIT
In order to be consistent with the title of the question the pseudo-query should the read as follows:
select count(*) from invoice
where datePayment < FIRST_WORKING_DAY + N
then the question can be reduced to calculate the FIRST_WORKING_DAY of every month.
You could look for the first date in a month, where the date is not in the holiday table and the date is not a weekend:
select min(datePayment), datepart(mm, datePayment)
from invoices
where datepart(dw, datePayment) not in (1,7) --day of week
and not exists (select holiday from holidays where holiday = datePayment)
group by datepart(mm, datePayment) --monthnr
Something like this might work:
create function dbo.GetFirstWorkdayOfMonth(#Year INT, #Month INT)
returns DATETIME
as begin
declare #firstOfMonth VARCHAR(20)
SET #firstOfMonth = CAST(#Year AS VARCHAR(4)) + '-' + CAST(#Month AS VARCHAR) + '-01'
declare #currDate DATETIME
set #currDate = CAST(#firstOfMonth as DATETIME)
declare #weekday INT
set #weekday = DATEPART(weekday, #currdate)
-- 7 = saturday, 1 = sunday
while #weekday = 1 OR #weekday = 7
begin
set #currDate = DATEADD(DAY, 1, #currDate)
set #weekday = DATEPART(weekday, #currdate)
end
return #currdate
end
I'm not 100% sure about whether the "weekday" numbers are fixed or might depend on your locale on your SQL Server. Check it out!
Marc
Rather than a Holidays table of days to exclude, we use the calendar table approach: one row for every day the application will ever need (thirty years spans a modest 11K rows). So not only does it have an is_weekday column, it has other things relevant to the enterprise e.g. julianized_date. This way, every possible date would have a ready-prepared value for first_working_day_this_month and finding it involves a simple lookup (which SQL products tend to be optimized for!) rather than 'calculating' it each time on the fly.
We have dates table in our application (filled with all dates and date parts for some tens of years), what allows various "missing" date manipulations, like (in pseudo-sql):
select min(ourdates.datevalue)
from ourdates
where ourdates.year=<given year> and ourdates.month=<given month>
and ourdates.isworkday
and not exists (
select * from holidays
where holidays.datevalue=ourdates.datevalue
)
Ok, at a first stab, you could put the following code into a UDF and pass in the Year and Month as variables. It can then return TestDate which is the first working day of the month.
DECLARE #Month INT
DECLARE #Year INT
SELECT #Month = 5
SELECT #Year = 2009
DECLARE #FirstDate DATETIME
SELECT #FirstDate = CONVERT(varchar(4), #Year) + '-' + CONVERT(varchar(2), #Month) + '-' + '01 00:00:00.000'
DROP TABLE #HOLIDAYS
CREATE TABLE #HOLIDAYS (HOLIDAY DateTime)
INSERT INTO #HOLIDAYS VALUES('2009-01-01 00:00:00.000')
INSERT INTO #HOLIDAYS VALUES('2009-05-01 00:00:00.000')
DECLARE #DateFound BIT
SELECT #DateFound = 0
WHILE(#DateFound = 0)
BEGIN
IF(
DATEPART(dw, #FirstDate) = 1
OR
DATEPART(dw, #FirstDate) = 1
OR
EXISTS(SELECT * FROM #HOLIDAYS WHERE HOLIDAY = #FirstDate)
)
BEGIN
SET #FirstDate = DATEADD(dd, 1, #FirstDate)
END
ELSE
BEGIN
SET #DateFound = 1
END
END
SELECT #FirstDate
The things I don`t like with this solution though are, if your holidays table contains all days of the month there will be an infinite loop. (You could check the loop is still looking at the right month) It relies upon the dates being equal, eg all at time 00:00:00. Finally, the way I calculate the 1st of the month past in using string concatenation was a short cut. There are much better ways of finding the actual first day of the month.
Gets the first N working days of each month of year 2009:
select * from invoices as x
where
datePayment between '2009-01-01' and '2009-12-31'
and exists
(
select
1
from invoices
where
-- exclude holidays and sunday saturday...
(
datepart(dw, datePayment) not in (1,7) -- day of week
/*
-- Postgresql and Oracle have programmer-friendly IN clause
and
(datepart(yyyy,datePayment), datepart(mm,datePayment))
not in (select hyear, hday from holidays)
*/
-- this is the MSSQL equivalent of programmer-friendly IN
and
not exists
(
select * from holidays
where
hyear = datepart(yyyy,datePayment)
and hmonth = datepart(mm, datePayment)
)
)
-- ...exclude holidays and sunday saturday
-- get the month of x datePayment
and
(datepart(yyyy, datePayment) = datepart(yyyy, x.datePayment)
and datepart(mm, datePayment) = datepart(mm, x.datePayment))
group by
datepart(yyyy, datePayment), datepart(mm, datePayment)
having
x.datePayment < MIN(datePayment) + #N -- up to N working days
)
Returns the first Monday of the current month
SELECT DATEADD(
WEEK,
DATEDIFF( --x weeks between 1900-01-01 (Monday) and inner result
WEEK,
0, --1900-01-01
DATEADD( --inner result
DAY,
6 - DATEPART(DAY, GETDATE()),
GETDATE()
)
),
0 --1900-01-01 (Monday)
)
SELECT DATEADD(day, DATEDIFF (day, 0, DATEADD (month, DATEDIFF (month, 0, GETDATE()), 0) -1)/7*7 + 7, 0);
select if(weekday('yyyy-mm-01') < 5,'yyyy-mm-01',if(weekday('yyyy-mm-02') < 5,'yyyy-mm-02','yyyy-mm-03'))
Saturdays and Sundays are 5, 6 so you only need two checks to get the first working day
Related
I need to find anniversary date and anniversary year of employees and send email in every 14 days.But I have a problem with last week of December when using the following query if start date and end date are in different years.
Select * from Resource
where (DATEPART(dayofyear,JoinDate)
BETWEEN DATEPART(dayofyear,GETDATE())
AND DATEPART(dayofyear,DateAdd(DAY,14,GETDATE())))
Instead of comparing to a dayofyear (which resets to zero at jan 1st and is the reason your query breaks within 14 days of the end of the year) you could update the employee's joindate to be the current year for the purpose of the query and just compare to actual dates
Select * from Resource
-- Add the number of years difference between joinDate and the current year
where DATEADD(year,DATEDIFF(Year,joinDate,GetDate()),JoinDate)
-- compare to range "today"
BETWEEN GetDate()
-- to 14 days from today
AND DATEADD(Day,14,GetDate())
-- duplicate for following year
OR DATEADD(year,DATEDIFF(Year,joinDate,GetDate())+1,JoinDate) -- 2016-1-1
BETWEEN GetDate()
AND DATEADD(Day,14,GetDate())
Test query:
declare #joindate DATETIME='2012-1-1'
declare #today DATETIME = '2015-12-26'
SELECT #joinDate
where DATEADD(year,DATEDIFF(Year,#joinDate,#today),#JoinDate) -- 2015-1-1
BETWEEN #today -- 2015-12-26
AND DATEADD(Day,14,#today) -- 2016-01-09
OR DATEADD(year,DATEDIFF(Year,#joinDate,#today)+1,#JoinDate) -- 2016-1-1
BETWEEN #today -- 2015-12-26
AND DATEADD(Day,14,#today) -- 2016-01-09
(H/T #Damien_The_Unbeliever for a simple fix)
The above correctly selects the joinDate which is in the first week of Jan (note I've had to fudge #today as Ive not managed to invent time travel).
The above solution should also solve the issue with leap years that was hiding in your original solution.
Update
You expressed in comments the requirement to select AnniversaryDate and Years of service, you need to apply some CASE logic to determine whether to add 1 (year or date) to your select
select *,
CASE
WHEN DATEADD(YEAR,DATEDIFF(Year,JoinDate,GETDATE()),JoinDate) < GetDate()
THEN DATEDIFF(Year,JoinDate,GETDATE())+1
ELSE DATEDIFF(Year,JoinDate,GETDATE())
END as [Years],
CASE WHEN DATEADD(YEAR,DATEDIFF(Year,JoinDate,GETDATE()),JoinDate) < GetDate()
THEN DATEADD(YEAR,DATEDIFF(Year,JoinDate,GETDATE())+1,JoinDate)
ELSE DATEADD(YEAR,DATEDIFF(Year,JoinDate,GETDATE()),JoinDate)
end as [AnniversaryDate]
.... // etc
You could do this:
Select * from Resource
where DATEPART(dayofyear,JoinDate)
BETWEEN DATEPART(dayofyear,GETDATE())
AND DATEPART(dayofyear,DateAdd(DAY,14,GETDATE()))
OR
DATEPART(dayofyear,JoinDate)
BETWEEN (DATEPART(dayofyear,GETDATE()) + 365)
AND (DATEPART(dayofyear,DateAdd(DAY,14,GETDATE())) + 365)
Try this:
DECLARE #Today DATE = GETDATE() --'12/25/2013'
DECLARE #Duration INT = 14
;WITH Recur AS
(
SELECT #Today AS RecurDate
UNION ALL
SELECT DATEADD(DAY, 1, RecurDate)
FROM Recur
WHERE DATEDIFF(DAY, #Today, RecurDate)+1 < #Duration
)
SELECT
r.*
FROM
Resource r
JOIN Recur
ON CONVERT(VARCHAR(5), JoinDate, 101) = CONVERT(VARCHAR(5), RecurDate, 101)
WHERE JoinDate < #Today
You can use the SQL DATEADD() function with week number parameter
Here is how you can use it:
DECLARE #date date = getdate()
Select * from Resource
where
JoinDate BETWEEN #date AND DATEADD(ww,2,#date)
I have a rollup data table which stores data for daily counts, monthly counts and yearly counts.
"rollup_type" designates if its a daily(1)/monthly(2)/yearly data(3). For a yearly record, both monthl/daily is null. For monthly record, daily is null.
I am trying to do a simple SELECT based on input start date and end date with no success. Here is what I tried which isn't working correctly.
declare #start_date datetime = '2013-02-01'
declare #enddate datetime = '2014-01-12'
select * from olr_rollup_data rd
where ( rd.Year > DATEPART(YYYY, #start_date) or ( rd.Year = DATEPART(YYYY, #start_date) and ( (rd.Month > DATEPART(MM, #start_date) and rd.day is null) or (rd.MONTH = DATEPART(MM, #start_date) and rd.day >= DATEPART(DD, #start_date) ))))
and ( rd.Year < DATEPART(YYYY, #enddate) or ( rd.Year = DATEPART(YYYY, #enddate) and ( (rd.Month < DATEPART(MM, #enddate) and rd.day is null) or ( rd.MONTH = DATEPART(MM, #enddate) and rd.Day <= DATEPART(DD, #enddate) ))))
Basically, a generic select statement which will use combination of daily, monthly and yearly data from input dates. It should select days plus full month when input dates cover full month in between and so on.
I would appreciate if you help figure out correct select statement. Thank you.
Dates are always a pain to work with, that is why it is nice to use the built in date time functions when available. Sadly that won't work here, we have to figure out some tricks.
One way to work with dates as "numbers" is to multiply the year by 10000, the month by 100 and add these numbers to the day of the month. This will give you an integer where the digits look like this
YYYYMMDD
While disjointed (there are a lot of integers you will never see) any integer with this representation has the same cardinality as the date it represents (those that are larger as a date are also larger as an integer.)
We can use this to solve your problem as follows:
DECLARE #startDate INTEGER = 20130201
DECLARE #endDate INTEGER = 20140112
SELECT *
FROM
(
SELECT ((year*10000)+(ISNULL(month,0)*100)+ISNULL(day,0)) as dateInt, *
FROM olr_rollup_date
) sub
WHERE dateInt >= #startDate AND dateInt <= #endDate
This will include roll up row for the month that are "surrounded". Since we default the null values to 0 a month null for May of 2014 would be 20140500. This is greater than any date in April and less than any date June but smaller than any date in May.
Years will work in a similar way.
I am working on an attendance software in asp.net, in it i have to make a report which will tell the user about the hours and everything...so far i have created the basic functionality of the system, i.e. the user can check in and check out...i am stuck at making the report...
I have to calculate the working hours for every month, so the user can compare his hours with the total hours...what i had in mind was to create a stored procedure which when given a month name and a year, returns an int containing working hours for that month....but i can seem to get at it....
so far i found out how to create a date from a given month and a date, and found out the last day of that month, using which i can find out the total days in month...now i cant seem to figure out how do i know how much days to subtract for getting the working days.
here's the so far code..
declare
#y int,
#m int,
#d int,
#date datetime
set #y = 2012
set #m = 01
set #d = 01
----To create the date first
select #date = dateadd(mm,(#y-1900)* 12 + #m - 1,0) + (#d-1)
----Last Day of that date
SELECT DATEADD(s,-1,DATEADD(mm, DATEDIFF(m,0,#date)+1,0))
any help will be appreciated guys, thanks in advance....
The #theDate is any date on the month you want to calculate the work days. This approach does not take care about holidays.
DECLARE #theDate DATETIME = GETDATE()
SELECT MONTH(#theDate) [Month], 20 + COUNT(*) WorkDays
FROM (
SELECT DATEADD(MONTH, DATEDIFF(MONTH, 0, #theDate), 28) AS theDate
UNION
SELECT DATEADD(MONTH, DATEDIFF(MONTH, 0, #theDate), 29)
UNION
SELECT DATEADD(MONTH, DATEDIFF(MONTH, 0, #theDate), 30)
) AS d
WHERE DATEPART(DAY, theDate) > 28
AND DATEDIFF(DAY, 0, theDate) % 7 < 5
Here you can consider the below sql server code to get the first and
last day of the given month and also ignore all the Saturdays and Sundays.
DECLARE #curr_date datetime=getdate()
DECLARE #st_date datetime,#ed_date datetime
select #st_date=DATEADD(mm,datediff(mm,0,#curr_date),0),#ed_date = DATEADD(mm,datediff(mm,-1,#curr_date),-1)
--select #st_date as first_day,#ed_date as last_day
SET DATEFIRST 1 --Monday as first day of week
select DATEADD(dd,number,#st_date) from master..spt_values
where DATEDIFF(dd,DATEADD(dd,number,#st_date),#ed_date) >= 0 and type='P'
and DATEPART(DW,DATEADD(dd,number,#st_date)) <> 6
and DATEPART(DW,DATEADD(dd,number,#st_date)) <> 7
But inorder to calculate the actual working hours, you will have to take into the consideration of following thigs
1.Calculate the time interval between swipe-in and swipe-outs between start and end time for a day.
2.Exclude all the time gap(employee not in office)
3.Consider the company holidays.
etc
Here is a UDF to count work days. You can pass any date of a month to this function. But usually you should use actual "calendar" table to calculate work days and insert in this table weekends, holidays,... and so on.
CREATE FUNCTION dbo.WorkDaysCount (#Date datetime)
RETURNS int AS
BEGIN
DECLARE #BeginOfMonth datetime
SET #BeginOfMonth=DATEADD(DAY,-DAY(#Date)+1,#Date);
DECLARE #EndOfMonth datetime
SET #EndOfMonth=DATEADD(Day,-1,DATEADD(Month,1,#BeginOfMonth));
DECLARE #cDate datetime
set #cDate=#BeginOfMonth
Declare #WorkDaysCount int
SET #WorkDaysCount=0
while #cDate<=#EndOfMonth
begin
if DATEPART(dw,#cDate) not in (1,7) SET #WorkDaysCount=#WorkDaysCount+1 -- not a Sunday or Saturday change (1,7) to (6,7) if you have other week start day (Monday).
set #cDate=#cDate+1;
end;
return (#WorkDaysCount);
END
Is there is a way to group dates by week of month in SQL Server?
For example
Week 2: 05/07/2012 - 05/13/2012
Week 3: 05/14/2012 - 05/20/2012
but with Sql server statement
I tried
SELECT SOMETHING,
datediff(wk, convert(varchar(6), getdate(), 112) + '01', getdate()) + 1 AS TIME_
FROM STATISTICS_
GROUP BY something, TIME_
ORDER BY TIME_
but it returns the week number of month. (means 3)
How to get the pair of days for current week ?
For example, now we are in third (3rd) week and I want to show 05/14/2012 - 05/20/2012
I solved somehow:
SELECT DATEADD(ww, DATEDIFF(ww,0,<my_column_name>), 0)
select DATEADD(ww, DATEDIFF(ww,0,<my_column_name>), 0)+6
Then I will get two days and I will concatenate them later.
All right, bear with me here. We're going to build a temporary calendar table that represents this month, including the days from before and after the month that fall into your definition of a week (Monday - Sunday). I do this in a lot of steps to try to make the process clear, but I probably haven't excelled at that in this case.
We can then generate the ranges for the different weeks, and you can join against your other tables using that.
SET DATEFIRST 7;
SET NOCOUNT ON;
DECLARE #today SMALLDATETIME, #fd SMALLDATETIME, #rc INT;
SELECT #today = DATEADD(DAY, DATEDIFF(DAY, 0, GETDATE()), 0), -- today
#fd = DATEADD(DAY, 1-DAY(#today), #today), -- first day of this month
#rc = DATEPART(DAY, DATEADD(DAY, -1, DATEADD(MONTH, 1, #fd)));-- days in month
DECLARE #thismonth TABLE (
[date] SMALLDATETIME,
[weekday] TINYINT,
[weeknumber] TINYINT
);
;WITH n(d) AS (
SELECT TOP (#rc+12) DATEADD(DAY, ROW_NUMBER() OVER
(ORDER BY [object_id]) - 7, #fd) FROM sys.all_objects
)
INSERT #thismonth([date], [weekday]) SELECT d, DATEPART(WEEKDAY, d) FROM n;
DELETE #thismonth WHERE [date] < (SELECT MIN([date]) FROM #thismonth WHERE [weekday] = 2)
OR [date] > (SELECT MAX([date]) FROM #thismonth WHERE [weekday] = 1);
;WITH x AS ( SELECT [date], weeknumber, rn = ((ROW_NUMBER() OVER
(ORDER BY [date])-1) / 7) + 1 FROM #thismonth ) UPDATE x SET weeknumber = rn;
-- now, the final query given all that (I've only broken this up to get rid of the vertical scrollbars):
;WITH ranges(w,s,e) AS (
SELECT weeknumber, MIN([date]), MAX([date]) FROM #thismonth GROUP BY weeknumber
)
SELECT [week] = CONVERT(CHAR(10), r.s, 120) + ' - ' + CONVERT(CHAR(10), r.e, 120)
--, SOMETHING , other columns from STATISTICS_?
FROM ranges AS r
-- LEFT OUTER JOIN dbo.STATISTICS_ AS s
-- ON s.TIME_ >= r.s AND s.TIME_ < DATEADD(DAY, 1, r.e)
-- comment this out if you want all the weeks from this month:
WHERE w = (SELECT weeknumber FROM #thismonth WHERE [date] = #today)
GROUP BY r.s, r.e --, SOMETHING
ORDER BY [week];
Results with WHERE clause:
week
-----------------------
2012-05-14 - 2012-05-20
Results without WHERE clause:
week
-----------------------
2012-04-30 - 2012-05-06
2012-05-07 - 2012-05-13
2012-05-14 - 2012-05-20
2012-05-21 - 2012-05-27
2012-05-28 - 2012-06-03
Note that I chose YYYY-MM-DD on purpose. You should avoid regional formatting like M/D/Y especially for input but also for display. No matter how targeted you think your audience is, you're always going to have someone who thinks 05/07/2012 is July 5th, not May 7th. With YYYY-MM-DD there is no ambiguity whatsoever.
Create a calendar table, then you can query week numbers, first/last days of specific weeks and months etc. You can also join on it queries to get a date range etc.
How about a case statement?
case when datepart(day, mydatetime) between 1 and 7 then 1
when datepart(day, mydatetime) between 8 and 14 then 2
...
You'll also have to include the year & month unless you want all the week 1s in the same group.
It's not clear of you want to "group dates by week of month", or alternately "select data from a given week"
If you mean "group" this little snippet should get you 'week of month':
SELECT <stuff>
FROM CP_STATISTICS
WHERE Month(<YOUR DATE COL>) = 5 --april
GROUP BY Year(<YOUR DATE COL>),
Month(<YOUR DATE COL>),
DATEDIFF(week, DATEADD(MONTH, DATEDIFF(MONTH, 0, <YOUR DATE COL>), 0)
, <YOUR DATE COL>) +1
Alternately, if you want "sales for week 1 of April, ordered by date" You could do something like..
DECLARE #targetDate datetime2 = '5/3/2012'
DECLARE #targetWeek int = DATEDIFF(week, DATEADD(MONTH,
DATEDIFF(MONTH, 0, #targetDate), 0), #targetDate) +1
SELECT <stuff>
FROM CP_STATISTICS
WHERE MONTH(#targetDate) = Month(myDateCol) AND
YEAR(#targetDate) = Year (myDateCol) AND
#targetWeek = DATEDIFF(week, DATEADD(MONTH,
DATEDIFF(MONTH, 0, myDateCol), 0), myDateCol) +1
ORDER BY myDateCol
Note, things would get more complicated if you use non-standard weeks, or want to reach a few days into an earlier month for weeks that straddle a month boundary.
EDIT 2
From looking at your 'solved now' section. I think your question is "how do I get data out of a table for a given week?"
Your solution appears to be:
DECLARE #targetDate datetime2 = '5/1/2012'
DECLARE #startDate datetime2 = DATEADD(ww, DATEDIFF(ww,0,targetDate), 0)
DECLARE #endDate datetime2 = DATEADD(ww, DATEDIFF(ww,0,#now), 0)+6
SELECT <stuff>
FROM STATISTICS_
WHERE dateStamp >= #startDate AND dateStamp <= #endDate
Notice how if the date is 5/1 this solution results in a start date of '4/30/2012'. I point this out because your solution crosses month boundaries. This may or may not be desirable.
i have an ssis Package which runs on business days (mon-Fri). if i receive file on tuesday , background(DB), it takes previous business day date and does some transactions. If i run the job on friday, it has to fetch mondays date and process the transactions.
i have used the below query to get previous business date
Select Convert(varchar(50), Position_ID) as Position_ID,
TransAmount_Base,
Insert_Date as InsertDate
from tblsample
Where AsOfdate = Dateadd(dd, -1, Convert(datetime, Convert(varchar(10), '03/28/2012', 101), 120))
Order By Position_ID
if i execute this query i'll get the results of yesterdays Transactios. if i ran the same query on monday, it has to fetch the Fridays transactions instead of Sundays.
SELECT DATEADD(DAY, CASE DATENAME(WEEKDAY, GETDATE())
WHEN 'Sunday' THEN -2
WHEN 'Monday' THEN -3
ELSE -1 END, DATEDIFF(DAY, 0, GETDATE()))
I prefer to use DATENAME for things like this over DATEPART as it removes the need for Setting DATEFIRST And ensures that variations on time/date settings on local machines do not affect the results. Finally DATEDIFF(DAY, 0, GETDATE()) will remove the time part of GETDATE() removing the need to convert to varchar (much slower).
EDIT (almost 2 years on)
This answer was very early in my SO career and it annoys me everytime it gets upvoted because I no longer agree with the sentiment of using DATENAME.
A much more rubust solution would be:
SELECT DATEADD(DAY, CASE (DATEPART(WEEKDAY, GETDATE()) + ##DATEFIRST) % 7
WHEN 1 THEN -2
WHEN 2 THEN -3
ELSE -1
END, DATEDIFF(DAY, 0, GETDATE()));
This will work for all language and DATEFIRST settings.
This function returns last working day and takes into account holidays and weekends. You will need to create a simple holiday table.
-- =============================================
-- Author: Dale Kilian
-- Create date: 2019-04-29
-- Description: recursive function returns last work day for weekends and
-- holidays
-- =============================================
ALTER FUNCTION dbo.fnGetWorkWeekday
(
#theDate DATE
)
RETURNS DATE
AS
BEGIN
DECLARE #importDate DATE = #theDate
DECLARE #returnDate DATE
--Holidays
IF EXISTS(SELECT 1 FROM dbo.Holidays WHERE isDeleted = 0 AND #theDate = Holiday_Date)
BEGIN
SET #importDate = DATEADD(DAY,-1,#theDate);
SET #importDate = (SELECT dbo.fnGetWorkWeekday(#importDate))
END
--Satruday
IF(DATEPART(WEEKDAY,#theDate) = 7)
BEGIN
SET #importDate = DATEADD(DAY,-1,#theDate);
SET #importDate = (SELECT dbo.fnGetWorkWeekday(#importDate))
END
--Sunday
IF(DATEPART(WEEKDAY,#theDate) = 1)
BEGIN
SET #importDate = DATEADD(DAY,-2,#theDate);
SET #importDate = (SELECT dbo.fnGetWorkWeekday(#importDate))
END
RETURN #importDate;
END
GO
Then how about:
declare #dt datetime='1 dec 2012'
select case when 8-##DATEFIRST=DATEPART(dw,#dt)
then DATEADD(d,-2,#dt)
when (9-##DATEFIRST)%7=DATEPART(dw,#dt)%7
then DATEADD(d,-3,#dt)
else DATEADD(d,-1,#dt)
end
The simplest solution to find the previous business day is to use a calendar table with a column called IsBusinessDay or something similar. The your query is something like this:
select max(BaseDate)
from dbo.Calendar c
where c.IsBusinessDay = 0x1 and c.BaseDate < #InputDate
The problem with using functions is that when (not if) you have to create exceptions for any reason (national holidays etc.) the code quickly becomes unmaintainable; with the table, you just UPDATE a single value. A table also makes it much easier to answer questions like "how many business days are there between dates X and Y", which are quite common in reporting tasks.
You can easily make this a function call, adding a second param to replace GetDate() with whatever date you wanted.
It will work for any day of the week, at any date range, if you change GetDate().
It will not change the date if the day of week is the input date (GetDate())
Declare #DayOfWeek As Integer = 2 -- Monday
Select DateAdd(Day, ((DatePart(dw,GetDate()) + (7 - #DayOfWeek)) * -1) % 7, Convert(Date,GetDate()))
More elegant:
select DATEADD(DAY,
CASE when datepart (dw,Getdate()) < 3 then datepart (dw,Getdate()) * -1 + -1 ELSE -1 END,
cast(GETDATE() as date))
select
dateadd(dd,
case DATEPART(dw, getdate())
when 1
then -2
when 2
then -3
else -1
end, GETDATE())
thanks for the tips above, I had a slight variant on the query in that my user needed all values for the previous business date. For example, today is a Monday so he needs everything between last Friday at midnight through to Saturday at Midnight. I did this using a combo of the above, and "between", just if anyone is interested. I'm not a massive techie.
-- Declare a variable for the start and end dates.
declare #StartDate as datetime
declare #EndDate as datetime
SELECT #StartDate = DATEADD(DAY, CASE DATENAME(WEEKDAY, GETDATE())
WHEN 'Sunday' THEN -2
WHEN 'Monday' THEN -3
ELSE -1 END, DATEDIFF(DAY, 0, GETDATE()))
select #EndDate = #StartDate + 1
select #StartDate , #EndDate
-- Later on in the query use "between"
and mydate between #StartDate and #EndDate