I would like my report to be sent biweekly on a Monday. Right now, I created two different subscriptions that sends the report on every 2nd and 4th week. I am not sure it would be accurate considering, I would like the send the report Monday after Pay period ends. What's a best way to approach to this?

A subscription can be created by Week and scheduled to repeat after 2 weeks. Monday can be selected as the day.
The schedule will show Every Monday of every two weeks.

Related

Reoccurring SQL job to run on the 2nd and 4th Thursday of every month

I need a job to run on the 2nd and 4th Thursday of every month. I know I can set up a job to run every two weeks but that logic doesn't work when a month eventually hits a five week span. Is it possible to set this up using the SQL Server Agent Schedule? If not, does anyone recommend another method?
Create two schedules on the job, one that runs on the second Thursday, and one that runs on the fourth.
Under the Frequency heading on the Scheduler, change the Occurs drop down to Monthly to get to the options you need.

BigQuery UI - How to schedule a query to run on the last day of the month?

I have a query that pulls a summary of metrics for the past month that needs to run on the last day of each month at a set time.
The BigQuery 'Schedule query' UI allows you to choose a date and time to run a query each month but there is no apparent option to choose that last day of the month.
If I simply choose the 31st of the month, what happens if there are only 30-days in that month? Will the query still run?
Or do I have to schedule a query to run on the 27th, 28th, 29th, 30th, 31st of the month to make sure that I don't miss the correct date?
I can't find any mention of this situation in the BigQuery documentation or online so any help/suggestions will be very gratefully received.
I understand that you need to run your query in the last day of each month. However, if you set 31st of the month as the schedule options, it will skip the months which do not have 31 days.
You can check this affirmation, by performing the following test in the BigQuery UI:
In the Schedule query options, under Schedule options, set:
Repeats: Monthly
On the: 31
Start date and run time: set the date to 10th of June (which is a month with 30 days)
Click Schedule
On the left side of the BigQuery UI, click on Scheduled queries
Check the query you saved. Among other details, it should be displayed Next Scheduled.
It will be shown July, 31
As you can see, it skipped the 30th of June. Thus, when you configure your query to run on the 31st of each month, it will ignore the months with less than 31 days. For this reason, I would advise you to select 27th, 28th, 29th, 30th, 31st of each month in order to run it in a manner that suits you.
As a bonus information, you can set up a Custom schedule option, as mentioned here. You can use syntaxes as "1st monday of month 00:00" or "every monday 00:00", here.

Running APScheduler job the day before the 1st and 3rd Monday each month

I have an APScheduler job that creates a report our client has requested for the first and third Mondays of the month.
To deliver that in time, I want to run the job the day before the first and third Monday, which can't be specified directly in APScheduler.
I noticed another user had this question as well, describing the request as impossible, in the comments of Running APScheduler Job Every nth Day of Month
Here's how I solved it:
scheduler.add_job(func, 'cron', 'day_of_week'='sun', 'day'='last,1-6,14-20')
By specifying the day of the week, and then specifying the days in the month that could apply, it will fire the day before the first and third Mondays. It only fires when all the conditions are met, so the other dates (which won't be Sunday) don't fire.

SSRS Report subscription scheduling with flexible dates

I have a set of reports that are being updated 4 times a month on set dates; on 1,9,16 and 24th. When any of these dates occur on weekends the updating will be done the next monday.
Now I'm working on a schedule that will send emails to persons once the report has been updated, and the problem is those weekends.
Can I somehow script the schedule to skip dates on weekends and do it on the next monday instead?
You can do this using a data-driven subscription. You'll need to write a SQL query that checks the current day and determines if it's one of these cases or not. Have the query return the email addresses you want to send to if it's a valid day.
Then in the "To" field for the subscription you can reference the field from the query. Set it to run every day. The subscription will run that query every day and deliver the email only when the conditions are true.

Scheduling job in sql server mgmt studio to run for 'x' days in a month

How do I run a job in Sql Server Agent in (SQL Server Management Studio) for 'x' number of days in a month?
eg: Every 1st.2nd and 3rd of every month
The problem is I am not sure of these days! The user will specify the 'x' number of days!
For instance, the user feels for the month of April he wants the job to be scheduled on 'x' days. Here x= 1st,2nd and 4th of April.
And for the month May he feels to schedule on 'x' days. Here x= 7th,8th and 10th!
Is it possible to schedule in such a way?
Is there any script to schedule this???
Make a schedule that's run on those three days. Assign this job to that schedule.
(To elaborate and make it perfectly clear).
Make three schedules (Rightclick Jobs, Manage Schedules).In new schedules choose - Recurring on monthly. One starts the 1st, one starts the 2nd, one starts the 3rd of every month (for example, or x times for whatever day of month you wish).
Name these schedules something that's easy for you to spot in a list.
On the job you wish to run on these days, properties on it, schedule, then pick the schedule(s) you want to assign to the given job.
That should be all.
If the schedule is user defined then I'd probably just schedule the job to run every day and have the first step be to check whether it should be running today and if not exit.