SQLAgent job with different schedules - sql

I am looking to see if its possible to have one job that runs different schedules, with the catch being one of the schedules needs to pass in a parameter.
I have an executable that will run some functionality when there is no parameter, but if there is a parameter present it will run some additional logic.
Setting up my job I created a schedule (every 15 minutes), Operating system (CmdExec)
runApplication.exe
For the other schedule I would like it to be once per day however the executable would need to be: runApplication.exe "1"
I dont think I can create a different step with a separate schedule, or can I?
Anyone have any ideas on how to achieve this without having two separate jobs?

There's no need for 2 jobs. What you can do is update your script so the result of your job (your parameter) is stored in a table. Then update your secondary logic to reference that table. If there's a value of parameter, then run your secondary logic. All in one script. If there's no value in that parameter, then have your secondary logic to return a 0 or not run at all.
Just make sure you either truncate the entire reference parameter table every run or you store a date in there so you know which one to reference.
Good luck.

Related

SQL query for inventory management

Hope I can explain the problem I'm having trouble with.
I have to write a stepwise methodology using pseudocode/SQL query to auto generate a list of products/items with low stock/expiry from the inventory database.The list must be updated at 12 a.m. daily.
I tried this
CREATE EVENT IF NOT EXISTS update_table
ON SCHEDULE EVERY 1 DAY STARTS '2022-05-22 00:00:00'
ON COMPLETION PRESERVE ENABLE
Do
Select inventory.products from inventory where inventory.stocks <
inventory.required_stocks.
Your stated requirement is to run some sort of report very soon after the beginning of each calendar day.
The next question you must answer is this: What will you do with that report? Will you simply drop it into "low_stock" table someplace in your database? Will you format it into an email message and send it to your purchasing department? It will be difficult to make "pseudocode" for your requirement without first analyzing the overall business process you intend to enhance.
Various RDBMS systems have ways of doing scheduled things at particular times of day. You've shown the EVENT setup provided by MariaDB / MySQL. SQL Server has their "Jobs" system. postgreSQL has the pg_cron extension. Yo
The thing is, you can't just do SELECT operations from within these scheduled database actions: the result sets have noplace to go from that context. You can do CREATE TABLE midnight_run AS SELECT whatever ... to place the results in a table. But then the results are in another table.
If you want to get the results out of the DBMS, you'll need a UNIXish cron job or a Windowsish scheduled task running an appropriate application at midnight each day.
Pro tip Do your best to avoid scheduling stuff for precisely midnight. Many things run then. If you wait until a couple of minutes after the hour, your code is less likely to contend with other midnight code.

Pentaho : Executing a Job multiple times with different Params - Params are not sent over to Job

I have a Pentaho "Job" that should be executed multiple times, each time with a different param value.
I indeed have a similar set up as we see in this link https://help.pentaho.com/Documentation/8.1/Products/Data_Integration/Transformation_Step_Reference/Job_Executor
The Job does get executed as many times as the number of rows, although the different parameter values are not passed onto the Job. If I add a write to Log in the job it does not print the different values.
Figured it was a defect in 8.1.x. Upgraded to 8.2.x and it is resolved.

Pentaho Job - Execute job based on condition

I have a pentaho job that is scheduled to run every week and gets data from one table and populates in another.
Now the job executes every week irrespective of whether the source table was updated or not.
I want to put a condition before the job runs to see if the source was updated last week or not and run the job only if the source was updated else dont run the job.
There are many ways you can do this. Assuming you have a table in your database that stores the last date your job was run, you could do something like this.
Create a Job and configure a parameter in it (I called mine RunJob). Create a transformation which gets your max run date, or row count then looks up the run date or row count from the previous run and compares them. It then sets the value of your job's variable based on the results of the comparison. Mine looks like this.
Note that the last step in the transform is a Set Variables step from the Job branch.
Then in your job use a Simple Evaluation step to test the variable. Mine looks like this:
Note here that my transform sets the value of the variable only if the job needs to be run, otherwise it will be NULL.
Note also to be sure to update your last run date or row count after doing the table load. That's what the SQL step does at the end of the job.
You could probably handle this with fewer steps if you used some JavaScript in there, but I prefer not to script if I can avoid it.

SSRS Data-Driven Subscription [based on static Subscription table] Not Picking Up Changes Made to Subscription Table

I have a .RDL report which I designed in BIDS and have deployed to my report server. The report asks for three parameters before viewing report: Year, Month and Customer ID. The report works great and does exactly what it is supposed to.
While I used to run each report individually because there were 2-3 customers, now there are 30+ customers who receive the report, so I wanted to switch to a more automated fulfillment method to get the reports generated. After doing some research it appears that a using Report Manager to create a "Data Driven Subscription" (DDS) using the "Windows File Share" option gives me the capabilities I need.
As part of creating the DDS, I created a table called [Subscription] which is a table containing one row for each customer receiving the report and has the following columns:
Year
Month
CustomerID
FileName
FileLocation
Overwrite
Format
...so through using the DDS Wizard in Report Manager, I was able to successfully set up a Data Driven Subscription (which is linked to various columns in the [Subscription] table) which creates a new report for each customer in the [Subscription] table, saves [and overwrites, if necessary] it in a location of my choosing as a PDF (specified in [Subscription].[FileLocation], or the FileLocation column of my table for each row), and runs every minute (I plan on changing frequency to once a week, eventually).
This works flawlessly, giving me a new set of 30 reports in the directory of my choosing, with each report having a name I assigned in the FileName column of my table. Exactly what I was looking for.
HERE'S THE PROBLEM: When I update the FileLocation or FileName (or anything, really) in the [Subscription] table - it doesn't pick up the changes right away. Sometimes it doesn't even pick it up at all (for example I updated the [ReportName] column for one customer from Report_711622 to SpecialReport_711622, so that the output file for that customer should be named SpecialReport_711622 while all of the other reports should be called Report_XXXXX [no Special prefix]. But the file name of report for Customer 711622 remains the same!
It's almost like the job only see's what it needs to do once a day, and then does not go back and reference the [Subscription] table until I leave for the night, then when I come back in the morning it picks up the change.
Since I am about to scale this process out to a large customer-base using a different report, I need to be able to make edits to the [Subscription] table and have them get picked up by the Data Driven Subscription immediately (and if not immediately, at least a fixed interval of time that I can adjust, so that I can know 100% when the change will get picked up).
Does anyone know what's causing my lag? How do I change it so that updates to the Subscription table get picked up regularly? I'm also having issues with creating new DDS on other reports (following the exact process outlined above) - I've created the subscriptions, for every minute, and it says they are running and the number of outputs match the number of customers with 0 errors, but there are no files in the drive I specified (or anywhere else I've looked, for that matter).
Any help would be greatly appreciated!
I think the answer lies in the mechanism SSRS uses. There are a few places "lag" can occur.
The subscription is in fact an SQL Agent job which creates a record in the Event table. This table is a queue that SSRS checks to do scheduled tasks.
There is a small amount of time between the moment the subscription creates the Event record and the moment SQL reads it and starts creating the dataset for your DDS. The creation of the DDS dataset takes some time, too. In this time, the subscription will be in the Pending state. If you change anything in the data during this time, The subscription will still use the old data as report parameters. So obviously you will not notice your change until the next scheduled run.
Which brings me to the following: if a subscription is still being run and the next schedule kicks in (chances are, because yours runs every minute), the engine will not execute it, but wait for the next subscription schedule, and so on. So that's another possibility of lag - and cause of missing reports for a certain schedule minute. The subscription processes reports sequentially, one row from your DDS recordset at a time. Again, this takes some time. You can also see that in the subscription window when it says: # of # processed.
I suggest you look at the Event table in the database ReportServer during an execution. Also the ExecutionHistory views (there are 3) may be interesting. A scheduled run shows up as a RequestType = 1 and generates one record for each report. You can see the exact timing and parameters of each report that is run in the subscription. You may be able to extract the data you need to resolve your other issues.
EDIT: Here is a more elaborate guide to DDS data and events
http://blogs.msdn.com/b/deanka/archive/2009/01/13/diagnosing-and-troubleshooting-subscriptions.aspx
http://blogs.msdn.com/b/deanka/archive/2010/02/16/troubleshooting-subscriptions-part-ii-using-the-report-services-trace-log-file.aspx
Could this "Double-Hop" problem be the source of my issues? I'm so stuck on this one!
The Double-Hop Problem - MSDN Knowledgecast

How to handle reoccurring calendar events and tasks (SQL Server tables & C#)

I need to scheduled events, tasks, appointments, etc. in my DB. Some of them will be one time appointments, and some will be reoccurring "To-Dos" which must be checked off. After looking a google's calendar layout and others, plus doing a lot of reading here is what I have so far.
Calendar table (Could be called schedule table I guess): Basic_Event Title, start/end, reoccurs info.
Calendar occurrence table: ties to schedule table, occurrence specific text, next occurrence date / time????
Looked here at how SQL Server does its jobs: http://technet.microsoft.com/en-us/library/ms178644.aspx
but this is slightly different.
Why two tables: I need to track status of each instance of the reoccurring task. Otherwise this would be much simpler...
so... on to the questions:
1) Does this seem like the proper way to go about it? Is there a better way to handle the multiple occurrence issue?
2) How often / how should I trigger creation of the occurrences? I really don't want to create a bunch of occurrences... BUT... What if the user wants to view next year's calendar...
Makes sense to have your schedule definition for a task in one table and then a separate table to record each instance of that separately - that's the approach I've taken in the past.
And with regards to creating the occurrences, there's probably no need to create them all up front. Especially when you consider tasks that repeat indefinitely! Again, the approach I've used in the past is to only create the next occurrence. When that instance is actioned, the next instance is then calculated and created.
This leaves the issue of viewing future occurrences. For this, you can start of with the initial/next scheduled occurrence and just calculate the future occurrences on-the-fly at display time.
While this isn't an exact answer to your question I've solved this problem before in SQL Server (though database here is irrelevant) by modeling a solution based on Unix's cron.
Instead of string parsing we used integer columns in a table to store the various time units.
We had events which could be scheduled; they could either point to a one-time schedule table that represented a distinct point in time (a date/time) or to the recurring schedule table which is modelled after cron.
Additionally remember to model your solution correctly. An event has a duration but the duration is unrelated to the schedule (but an event's duration may impact the schedule by causing conflicts). Do not try to model duration as part of your schedule.
In the past when we've done this, we had 2 tables:
1) Schedules -> Includes recurrence information
2) Exceptions -> Edit/changes to specific instances
Using SQL, it's possible to get the list of "Schedules" that have at least one instance in a given date range. Then you can expand in the GUI where each instance lies.