I see a google search pulls up a lot here but there is a lot of ambiguity on the web. Please do not mark as a duplicate.
I have seen
n log n
and
n ln n
and finally
n log(base2) n
One of the SO answers treats Big O as worst case and states n^2. Worst case is in fact n^2, but Big O does not imply worst case so in this sense it is highly voted but wrong.
To be clear, I want to know the average case and to be clear, this is for time-complexity.

In math you always assume the base is equal to 10.
In computer science, if the base is omitted from the logarithm, convention dictates that the base is equal to 2.
Bit of a silly question really, I'm surprised your teacher didn't address this. You can use any of the three Big-O runtimes in your original post because they all mean the same exact thing.

Related

What is wrong with this P argument

My teacher made this argument and asked us what could be wrong with it.
for an array A of n distinct numbers. Since there are n! permutations of A,
we cannot check for each permutation whether it is sorted, in a total time which
is polynomial in n. Therefore, sorting A cannot be in P.
my friend thought that it just should be : therefore sorting a cannot be in NP.
Is that it or are we thinking to easily about it?
The problem with this argument is that it fails to adequately specify the exact problem.
Sorting can be linear-time (O(n)) in the number of elements to sort, if you're sorting a large list of integers drawn from a small pool (counting sort, radix sort).
Sorting can be linearithmic-time (O(nlogn)) in the number of elements to sort, if you're sorting a list of arbitrary things which are all totally ordered according to some ordering relation (e.g., less than or equal to on the integers).
Sorting based on a partial order (e.g. topological sorting) must be analyzed in yet another way.
We can imagine a problem like sorting whereby the sortedness of a list cannot be determined by comparing adjacent entries only. In the extreme case, sortedness (according to what we are considering to be sorting) might only be verifiable by checking the entire list. If our kind of sorting is designed so as to guarantee there is exactly one sorted permutation of any given list, the time complexity is factorial-time (O(n!)) and the problem is not in P.
That's the real problem with this argument. If your professor is assuming that "sorting" refers to sorting integers not in any particular small range, the problem with the argument then is that we do not need to consider all permutations in order to construct the sorted one. If I have a bag with 100 marbles and I ask you to remove three marbles, the time complexity is constant-time; it doesn't matter that there are n(n-1)(n-2)/6 = 161700, or O(n^3), ways in which you can accomplish this task.
The argument is a non-sequitur, the conclusion does not logically follow from the previous steps. Why doesn't it follow? Giving a satisfying answer to that question requires knowing why the person who wrote the argument thinks it is correct, and then addressing their misconception. In this case, the person who wrote the argument is your teacher, who doesn't think the argument is correct, so there is no misconception to address and hence no completely satisfying answer to the question.
That said, my explanation would be that the argument is wrong because it proposes a specific algorithm for sorting - namely, iterating through all n! permutations and choosing the one which is sorted - and then assumes that the complexity of the problem is the same as the complexity of that algorithm. This is a mistake because the complexity of a problem is defined as the lowest complexity out of all algorithms which solve it. The argument only considered one algorithm, and didn't show anything about other algorithms which solve the problem, so it cannot reach a conclusion about the complexity of the problem itself.

Big O Notation example claiming 2n^2 = O(n^3)?

While I was studying time complexity, I found a web page explaining about Big O notation.
While I was reading I found the example they used and it got me confused.
In the example they said something like
2n^{2} = O(n^{3}) because for all n bigger than 2(n_{0}), there exists a c(which is 1) that satisfies 0 <= 2n^{2} <= cn^{3}
First I thought the Big O should be O(n^2). But after reading through few more texts I can see that n^2 is smaller than n^3 so can theoretically say that the big O is O(n^3).
But is O(n^2) wrong for the example above?
You're absolutely correct (though you should write out the proof for O(n^2) to convince yourself). Technically the example as written is not wrong, but it's also not a good example. You can think of O(g) as meaning that the function grows as slowly or slower than g. So if a function is O(n^2) it is also O(n^3). There are other variations on Big-O notation (Theta and Omega) which make stronger statements about the asymptotic behavior.
This thread had some nice information even though the focus of the question is slightly different Difference between Big-O and Little-O Notation.

Building ranking with genetic algorithm,

Question after BIG edition :
I need to built a ranking using genetic algorithm, I have data like this :
P(a>b)=0.9
P(b>c)=0.7
P(c>d)=0.8
P(b>d)=0.3
now, lets interpret a,b,c,d as names of football teams, and P(x>y) is probability that x wins with y. We want to build ranking of teams, we lack some observations P(a>d),P(a>c) are missing due to lack of matches between a vs d and a vs c.
Goal is to find ordering of team names, which the best describes current situation in that four team league.
If we have only 4 teams than solution is straightforward, first we compute probabilities for all 4!=24 orderings of four teams, while ignoring missing values we have :
P(abcd)=P(a>b)P(b>c)P(c>d)P(b>d)
P(abdc)=P(a>b)P(b>c)(1-P(c>d))P(b>d)
...
P(dcba)=(1-P(a>b))(1-P(b>c))(1-P(c>d))(1-P(b>d))
and we choose the ranking with highest probability. I don't want to use any other fitness function.
My question :
As numbers of permutations of n elements is n! calculation of probabilities for all
orderings is impossible for large n (my n is about 40). I want to use genetic algorithm for that problem.
Mutation operator is simple switching of places of two (or more) elements of ranking.
But how to make crossover of two orderings ?
Could P(abcd) be interpreted as cost function of path 'abcd' in assymetric TSP problem but cost of travelling from x to y is different than cost of travelling from y to x, P(x>y)=1-P(y<x) ? There are so many crossover operators for TSP problem, but I think I have to design my own crossover operator, because my problem is slightly different from TSP. Do you have any ideas for solution or frame for conceptual analysis ?
The easiest way, on conceptual and implementation level, is to use crossover operator which make exchange of suborderings between two solutions :
CrossOver(ABcD,AcDB) = AcBD
for random subset of elements (in this case 'a,b,d' in capital letters) we copy and paste first subordering - sequence of elements 'a,b,d' to second ordering.
Edition : asymetric TSP could be turned into symmetric TSP, but with forbidden suborderings, which make GA approach unsuitable.
It's definitely an interesting problem, and it seems most of the answers and comments have focused on the semantic aspects of the problem (i.e., the meaning of the fitness function, etc.).
I'll chip in some information about the syntactic elements -- how do you do crossover and/or mutation in ways that make sense. Obviously, as you noted with the parallel to the TSP, you have a permutation problem. So if you want to use a GA, the natural representation of candidate solutions is simply an ordered list of your points, careful to avoid repitition -- that is, a permutation.
TSP is one such permutation problem, and there are a number of crossover operators (e.g., Edge Assembly Crossover) that you can take from TSP algorithms and use directly. However, I think you'll have problems with that approach. Basically, the problem is this: in TSP, the important quality of solutions is adjacency. That is, abcd has the same fitness as cdab, because it's the same tour, just starting and ending at a different city. In your example, absolute position is much more important that this notion of relative position. abcd means in a sense that a is the best point -- it's important that it came first in the list.
The key thing you have to do to get an effective crossover operator is to account for what the properties are in the parents that make them good, and try to extract and combine exactly those properties. Nick Radcliffe called this "respectful recombination" (note that paper is quite old, and the theory is now understood a bit differently, but the principle is sound). Taking a TSP-designed operator and applying it to your problem will end up producing offspring that try to conserve irrelevant information from the parents.
You ideally need an operator that attempts to preserve absolute position in the string. The best one I know of offhand is known as Cycle Crossover (CX). I'm missing a good reference off the top of my head, but I can point you to some code where I implemented it as part of my graduate work. The basic idea of CX is fairly complicated to describe, and much easier to see in action. Take the following two points:
abcdefgh
cfhgedba
Pick a starting point in parent 1 at random. For simplicity, I'll just start at position 0 with the "a".
Now drop straight down into parent 2, and observe the value there (in this case, "c").
Now search for "c" in parent 1. We find it at position 2.
Now drop straight down again, and observe the "h" in parent 2, position 2.
Again, search for this "h" in parent 1, found at position 7.
Drop straight down and observe the "a" in parent 2.
At this point note that if we search for "a" in parent one, we reach a position where we've already been. Continuing past that will just cycle. In fact, we call the sequence of positions we visited (0, 2, 7) a "cycle". Note that we can simply exchange the values at these positions between the parents as a group and both parents will retain the permutation property, because we have the same three values at each position in the cycle for both parents, just in different orders.
Make the swap of the positions included in the cycle.
Note that this is only one cycle. You then repeat this process starting from a new (unvisited) position each time until all positions have been included in a cycle. After the one iteration described in the above steps, you get the following strings (where an "X" denotes a position in the cycle where the values were swapped between the parents.
cbhdefga
afcgedbh
X X X
Just keep finding and swapping cycles until you're done.
The code I linked from my github account is going to be tightly bound to my own metaheuristics framework, but I think it's a reasonably easy task to pull the basic algorithm out from the code and adapt it for your own system.
Note that you can potentially gain quite a lot from doing something more customized to your particular domain. I think something like CX will make a better black box algorithm than something based on a TSP operator, but black boxes are usually a last resort. Other people's suggestions might lead you to a better overall algorithm.
I've worked on a somewhat similar ranking problem and followed a technique similar to what I describe below. Does this work for you:
Assume the unknown value of an object diverges from your estimate via some distribution, say, the normal distribution. Interpret your ranking statements such as a > b, 0.9 as the statement "The value a lies at the 90% percentile of the distribution centered on b".
For every statement:
def realArrival = calculate a's location on a distribution centered on b
def arrivalGap = | realArrival - expectedArrival |
def fitness = Σ arrivalGap
Fitness function is MIN(fitness)
FWIW, my problem was actually a bin-packing problem, where the equivalent of your "rank" statements were user-provided rankings (1, 2, 3, etc.). So not quite TSP, but NP-Hard. OTOH, bin-packing has a pseudo-polynomial solution proportional to accepted error, which is what I eventually used. I'm not quite sure that would work with your probabilistic ranking statements.
What an interesting problem! If I understand it, what you're really asking is:
"Given a weighted, directed graph, with each edge-weight in the graph representing the probability that the arc is drawn in the correct direction, return the complete sequence of nodes with maximum probability of being a topological sort of the graph."
So if your graph has N edges, there are 2^N graphs of varying likelihood, with some orderings appearing in more than one graph.
I don't know if this will help (very brief Google searches did not enlighten me, but maybe you'll have more success with more perseverance) but my thoughts are that looking for "topological sort" in conjunction with any of "probabilistic", "random", "noise," or "error" (because the edge weights can be considered as a reliability factor) might be helpful.
I strongly question your assertion, in your example, that P(a>c) is not needed, though. You know your application space best, but it seems to me that specifying P(a>c) = 0.99 will give a different fitness for f(abc) than specifying P(a>c) = 0.01.
You might want to throw in "Bayesian" as well, since you might be able to start to infer values for (in your example) P(a>c) given your conditions and hypothetical solutions. The problem is, "topological sort" and "bayesian" is going to give you a whole bunch of hits related to markov chains and markov decision problems, which may or may not be helpful.

How can I test that my hash function is good in terms of max-load?

I have read through various papers on the 'Balls and Bins' problem and it seems that if a hash function is working right (ie. it is effectively a random distribution) then the following should/must be true if I hash n values into a hash table with n slots (or bins):
Probability that a bin is empty, for large n is 1/e.
Expected number of empty bins is n/e.
Probability that a bin has k balls is <= 1/ek! (corrected).
Probability that a bin has at least k collisions is <= ((e/k)**k)/e (corrected).
These look easy to check. But the max-load test (the maximum number of collisions with high probability) is usually stated vaguely.
Most texts state that the maximum number of collisions in any bin is O( ln(n) / ln(ln(n)) ).
Some say it is 3*ln(n) / ln(ln(n)). Other papers mix ln and log - usually without defining them, or state that log is log base e and then use ln elsewhere.
Is ln the log to base e or 2 and is this max-load formula right and how big should n be to run a test?
This lecture seems to cover it best, but I am no mathematician.
http://pages.cs.wisc.edu/~shuchi/courses/787-F07/scribe-notes/lecture07.pdf
BTW, with high probability seems to mean 1 - 1/n.
That is a fascinating paper/lecture-- makes me wish I had taken some formal algorithms class.
I'm going to take a stab at some answers here, based on what I've just read from that, and feel free to vote me down. I'd appreciate a correction, though, rather than just a downvote :) I'm also going to use n and N interchangeably here, which is a big no-no in some circles, but since I'm just copy-pasting your formulae, I hope you'll forgive me.
First, the base of the logs. These numbers are given as big-O notation, not as absolute formulae. That means that you're looking for something 'on the order of ln(n) / ln(ln(n))', not with an expectation of an absolute answer, but more that as n gets bigger, the relationship of n to the maximum number of collisions should follow that formula. The details of the actual curve you can graph will vary by implementation (and I don't know enough about the practical implementations to tell you what's a 'good' curve, except that it should follow that big-O relationship). Those two formulae that you posted are actually equivalent in big-O notation. The 3 in the second formula is just a constant, and is related to a particular implementation. A less efficient implementation would have a bigger constant.
With that in mind, I would run empirical tests, because I'm a biologist at heart and I was trained to avoid hard-and-fast proofs as indications of how the world actually works. Start with N as some number, say 100, and find the bin with the largest number of collisions in it. That's your max-load for that run. Now, your examples should be as close as possible to what you expect actual users to use, so maybe you want to randomly pull words from a dictionary or something similar as your input.
Run that test many times, at least 30 or 40. Since you're using random numbers, you'll need to satisfy yourself that the average max-load you're getting is close to the theoretical 'expectation' of your algorithm. Expectation is just the average, but you'll still need to find it, and the tighter your std dev/std err about that average, the more you can say that your empirical average matches the theoretical expectation. One run is not enough, because a second run will (most likely) give a different answer.
Then, increase N, to say, 1000, 10000, etc. Increase it logarithmically, because your formula is logarithmic. As your N increases, your max-load should increase on the order of ln(n) / ln(ln(n)). If it increases at a rate of 3*ln(n) / ln(ln(n)), that means that you're following the theory that they put forth in that lecture.
This kind of empirical test will also show you where your approach breaks down. It may be that your algorithm works well for N < 10 million (or some other number), but above that, it starts to collapse. Why could that be? Maybe you have some limitation to 32 bits in your code without realizing it (ie, using a 'float' instead of a 'double'), or some other implementation detail. These kinds of details let you know where your code will work well in practice, and then as your practical needs change, you can modify your algorithm. Maybe making the algorithm work for very large datasets makes it very inefficient for very small ones, or vice versa, so pinpointing that tradeoff will help you further characterize how you could adapt your algorithm to particular situations. Always a useful skill to have.
EDIT: a proof of why the base of the log function doesn't matter with big-O notation:
log N = log_10 (N) = log_b (N)/log_b (10)= (1/log_b(10)) * log_b(N)
1/log_b(10) is a constant, and in big-O notation, constants are ignored. Base changes are free, which is why you're encountering such variation in the papers.
Here is a rough start to the solution of this problem involving uniform distributions and maximum load.
Instead of bins and balls or urns or boxes or buckets or m and n, people (p) and doors (d) will be used as designations.
There is an exact expected value for each of the doors given a certain number of people. For example, with 5 people and 5 doors, the expected maximum door is exactly 1.2864 {(1429-625) / 625} above the mean (p/d) and the minimum door is exactly -0.9616 {(24-625) / 625} below the mean. The absolute value of the highest door's distance from the mean is a little larger than the smallest door's because all of the people could go through one door, but no less than zero can go through one of the doors. With large numbers of people (p/d > 3000), the difference between the absolute value of the highest door's distance from the mean and the lowest door's becomes negligible.
For an odd number of doors, the center door is essentially zero and is not scalable, but all of the other doors are scalable from certain values representing p=d. These rounded values for d=5 are:
-1.163 -0.495 0* 0.495 1.163
* slowly approaching zero from -0.12
From these values, you can compute the expected number of people for any count of people going through each of the 5 doors, including the maximum door. Except for the middle ordered door, the difference from the mean is scalable by sqrt(p/d).
So, for p=50,000 and d=5:
Expected number of people going through the maximum door, which could be any of the 5 doors, = 1.163 * sqrt(p/d) + p/d.
= 1.163 * sqrt(10,000) + 10,000 = 10,116.3
For p/d < 3,000, the result from this equation must be slightly increased.
With more people, the middle door slowly becomes closer and closer to zero from -0.11968 at p=100 and d=5. It can always be rounded up to zero and like the other 4 doors has quite a variance.
The values for 6 doors are:
-1.272 -0.643 -0.202 0.202 0.643 1.272
For 1000 doors, the approximate values are:
-3.25, -2.95, -2.79 … 2.79, 2.95, 3.25
For any d and p, there is an exact expected value for each of the ordered doors. Hopefully, a good approximation (with a relative error < 1%) exists. Some professor or mathematician somewhere must know.
For testing uniform distribution, you will need a number of averaged ordered sessions (750-1000 works well) rather than a greater number of people. No matter what, the variances between valid sessions are great. That's the nature of randomness. Collisions are unavoidable. *
The expected values for 5 and 6 doors were obtained by sheer brute force computation using 640 bit integers and averaging the convergence of the absolute values of corresponding opposite doors.
For d=5 and p=170:
-6.63901 -2.95905 -0.119342 2.81054 6.90686
(27.36099 31.04095 33.880658 36.81054 40.90686)
For d=6 and p=108:
-5.19024 -2.7711 -0.973979 0.734434 2.66716 5.53372
(12.80976 15.2289 17.026021 18.734434 20.66716 23.53372)
I hope that you may evenly distribute your data.
It's almost guaranteed that all of George Foreman's sons or some similar situation will fight against your hash function. And proper contingent planning is the work of all good programmers.
After some more research and trial-and-error I think I can provide something part way to to an answer.
To start off, ln and log seem to refer to log base-e if you look into the maths behind the theory. But as mmr indicated, for the O(...) estimates, it doesn't matter.
max-load can be defined for any probability you like. The typical formula used is
1-1/n**c
Most papers on the topic use
1-1/n
An example might be easiest.
Say you have a hash table of 1000 slots and you want to hash 1000 things. Say you also want to know the max-load with a probability of 1-1/1000 or 0.999.
The max-load is the maximum number of hash values that end up being the same - ie. collisions (assuming that your hash function is good).
Using the formula for the probability of getting exactly k identical hash values
Pr[ exactly k ] = ((e/k)**k)/e
then by accumulating the probability of exactly 0..k items until the total equals or exceeds 0.999 tells you that k is the max-load.
eg.
Pr[0] = 0.37
Pr[1] = 0.37
Pr[2] = 0.18
Pr[3] = 0.061
Pr[4] = 0.015
Pr[5] = 0.003 // here, the cumulative total is 0.999
Pr[6] = 0.0005
Pr[7] = 0.00007
So, in this case, the max-load is 5.
So if my hash function is working well on my set of data then I should expect the maxmium number of identical hash values (or collisions) to be 5.
If it isn't then this could be due to the following reasons:
Your data has small values (like short strings) that hash to the same value. Any hash of a single ASCII character will pick 1 of 128 hash values (there are ways around this. For example you could use multiple hash functions, but slows down hashing and I don't know much about this).
Your hash function doesn't work well with your data - try it with random data.
Your hash function doesn't work well.
The other tests I mentioned in my question also are helpful to see that your hash function is running as expected.
Incidentally, my hash function worked nicely - except on short (1..4 character) strings.
I also implemented a simple split-table version which places the hash value into the least used slot from a choice of 2 locations. This more than halves the number of collisions and means that adding and searching the hash table is a little slower.
I hope this helps.

What is Big O notation? Do you use it? [duplicate]

This question already has answers here:
What is a plain English explanation of "Big O" notation?
(43 answers)
Closed 9 years ago.
What is Big O notation? Do you use it?
I missed this university class I guess :D
Does anyone use it and give some real life examples of where they used it?
See also:
Big-O for Eight Year Olds?
Big O, how do you calculate/approximate it?
Did you apply computational complexity theory in real life?
One important thing most people forget when talking about Big-O, thus I feel the need to mention that:
You cannot use Big-O to compare the speed of two algorithms. Big-O only says how much slower an algorithm will get (approximately) if you double the number of items processed, or how much faster it will get if you cut the number in half.
However, if you have two entirely different algorithms and one (A) is O(n^2) and the other one (B) is O(log n), it is not said that A is slower than B. Actually, with 100 items, A might be ten times faster than B. It only says that with 200 items, A will grow slower by the factor n^2 and B will grow slower by the factor log n. So, if you benchmark both and you know how much time A takes to process 100 items, and how much time B needs for the same 100 items, and A is faster than B, you can calculate at what amount of items B will overtake A in speed (as the speed of B decreases much slower than the one of A, it will overtake A sooner or later—this is for sure).
Big O notation denotes the limiting factor of an algorithm. Its a simplified expression of how run time of an algorithm scales with relation to the input.
For example (in Java):
/** Takes an array of strings and concatenates them
* This is a silly way of doing things but it gets the
* point across hopefully
* #param strings the array of strings to concatenate
* #returns a string that is a result of the concatenation of all the strings
* in the array
*/
public static String badConcat(String[] Strings){
String totalString = "";
for(String s : strings) {
for(int i = 0; i < s.length(); i++){
totalString += s.charAt(i);
}
}
return totalString;
}
Now think about what this is actually doing. It is going through every character of input and adding them together. This seems straightforward. The problem is that String is immutable. So every time you add a letter onto the string you have to create a new String. To do this you have to copy the values from the old string into the new string and add the new character.
This means you will be copying the first letter n times where n is the number of characters in the input. You will be copying the character n-1 times, so in total there will be (n-1)(n/2) copies.
This is (n^2-n)/2 and for Big O notation we use only the highest magnitude factor (usually) and drop any constants that are multiplied by it and we end up with O(n^2).
Using something like a StringBuilder will be along the lines of O(nLog(n)). If you calculate the number of characters at the beginning and set the capacity of the StringBuilder you can get it to be O(n).
So if we had 1000 characters of input, the first example would perform roughly a million operations, StringBuilder would perform 10,000, and the StringBuilder with setCapacity would perform 1000 operations to do the same thing. This is rough estimate, but O(n) notation is about orders of magnitudes, not exact runtime.
It's not something I use per say on a regular basis. It is, however, constantly in the back of my mind when trying to figure out the best algorithm for doing something.
A very similar question has already been asked at Big-O for Eight Year Olds?. Hopefully the answers there will answer your question although the question asker there did have a bit of mathematical knowledge about it all which you may not have so clarify if you need a fuller explanation.
Every programmer should be aware of what Big O notation is, how it applies for actions with common data structures and algorithms (and thus pick the correct DS and algorithm for the problem they are solving), and how to calculate it for their own algorithms.
1) It's an order of measurement of the efficiency of an algorithm when working on a data structure.
2) Actions like 'add' / 'sort' / 'remove' can take different amounts of time with different data structures (and algorithms), for example 'add' and 'find' are O(1) for a hashmap, but O(log n) for a binary tree. Sort is O(nlog n) for QuickSort, but O(n^2) for BubbleSort, when dealing with a plain array.
3) Calculations can be done by looking at the loop depth of your algorithm generally. No loops, O(1), loops iterating over all the set (even if they break out at some point) O(n). If the loop halves the search space on each iteration? O(log n). Take the highest O() for a sequence of loops, and multiply the O() when you nest loops.
Yeah, it's more complex than that. If you're really interested get a textbook.
'Big-O' notation is used to compare the growth rates of two functions of a variable (say n) as n gets very large. If function f grows much more quickly than function g we say that g = O(f) to imply that for large enough n, f will always be larger than g up to a scaling factor.
It turns out that this is a very useful idea in computer science and particularly in the analysis of algorithms, because we are often precisely concerned with the growth rates of functions which represent, for example, the time taken by two different algorithms. Very coarsely, we can determine that an algorithm with run-time t1(n) is more efficient than an algorithm with run-time t2(n) if t1 = O(t2) for large enough n which is typically the 'size' of the problem - like the length of the array or number of nodes in the graph or whatever.
This stipulation, that n gets large enough, allows us to pull a lot of useful tricks. Perhaps the most often used one is that you can simplify functions down to their fastest growing terms. For example n^2 + n = O(n^2) because as n gets large enough, the n^2 term gets so much larger than n that the n term is practically insignificant. So we can drop it from consideration.
However, it does mean that big-O notation is less useful for small n, because the slower growing terms that we've forgotten about are still significant enough to affect the run-time.
What we now have is a tool for comparing the costs of two different algorithms, and a shorthand for saying that one is quicker or slower than the other. Big-O notation can be abused which is a shame as it is imprecise enough already! There are equivalent terms for saying that a function grows less quickly than another, and that two functions grow at the same rate.
Oh, and do I use it? Yes, all the time - when I'm figuring out how efficient my code is it gives a great 'back-of-the-envelope- approximation to the cost.
The "Intuitition" behind Big-O
Imagine a "competition" between two functions over x, as x approaches infinity: f(x) and g(x).
Now, if from some point on (some x) one function always has a higher value then the other, then let's call this function "faster" than the other.
So, for example, if for every x > 100 you see that f(x) > g(x), then f(x) is "faster" than g(x).
In this case we would say g(x) = O(f(x)). f(x) poses a sort of "speed limit" of sorts for g(x), since eventually it passes it and leaves it behind for good.
This isn't exactly the definition of big-O notation, which also states that f(x) only has to be larger than C*g(x) for some constant C (which is just another way of saying that you can't help g(x) win the competition by multiplying it by a constant factor - f(x) will always win in the end). The formal definition also uses absolute values. But I hope I managed to make it intuitive.
It may also be worth considering that the complexity of many algorithms is based on more than one variable, particularly in multi-dimensional problems. For example, I recently had to write an algorithm for the following. Given a set of n points, and m polygons, extract all the points that lie in any of the polygons. The complexity is based around two known variables, n and m, and the unknown of how many points are in each polygon. The big O notation here is quite a bit more involved than O(f(n)) or even O(f(n) + g(m)).
Big O is good when you are dealing with large numbers of homogenous items, but don't expect this to always be the case.
It is also worth noting that the actual number of iterations over the data is often dependent on the data. Quicksort is usually quick, but give it presorted data and it slows down. My points and polygons alogorithm ended up quite fast, close to O(n + (m log(m)), based on prior knowledge of how the data was likely to be organised and the relative sizes of n and m. It would fall down badly on randomly organised data of different relative sizes.
A final thing to consider is that there is often a direct trade off between the speed of an algorithm and the amount of space it uses. Pigeon hole sorting is a pretty good example of this. Going back to my points and polygons, lets say that all my polygons were simple and quick to draw, and I could draw them filled on screen, say in blue, in a fixed amount of time each. So if I draw my m polygons on a black screen it would take O(m) time. To check if any of my n points was in a polygon, I simply check whether the pixel at that point is green or black. So the check is O(n), and the total analysis is O(m + n). Downside of course is that I need near infinite storage if I'm dealing with real world coordinates to millimeter accuracy.... ...ho hum.
It may also be worth considering amortized time, rather than just worst case. This means, for example, that if you run the algorithm n times, it will be O(1) on average, but it might be worse sometimes.
A good example is a dynamic table, which is basically an array that expands as you add elements to it. A naïve implementation would increase the array's size by 1 for each element added, meaning that all the elements need to be copied every time a new one is added. This would result in a O(n2) algorithm if you were concatenating a series of arrays using this method. An alternative is to double the capacity of the array every time you need more storage. Even though appending is an O(n) operation sometimes, you will only need to copy O(n) elements for every n elements added, so the operation is O(1) on average. This is how things like StringBuilder or std::vector are implemented.
What is Big O notation?
Big O notation is a method of expressing the relationship between many steps an algorithm will require related to the size of the input data. This is referred to as the algorithmic complexity. For example sorting a list of size N using Bubble Sort takes O(N^2) steps.
Do I use Big O notation?
I do use Big O notation on occasion to convey algorithmic complexity to fellow programmers. I use the underlying theory (e.g. Big O analysis techniques) all of the time when I think about what algorithms to use.
Concrete Examples?
I have used the theory of complexity analysis to create algorithms for efficient stack data structures which require no memory reallocation, and which support average time of O(N) for indexing. I have used Big O notation to explain the algorithm to other people. I have also used complexity analysis to understand when linear time sorting O(N) is possible.
From Wikipedia.....
Big O notation is useful when analyzing algorithms for efficiency. For example, the time (or the number of steps) it takes to complete a problem of size n might be found to be T(n) = 4n² − 2n + 2.
As n grows large, the n² term will come to dominate, so that all other terms can be neglected — for instance when n = 500, the term 4n² is 1000 times as large as the 2n term. Ignoring the latter would have negligible effect on the expression's value for most purposes.
Obviously I have never used it..
You should be able to evaluate an algorithm's complexity. This combined with a knowledge of how many elements it will take can help you to determine if it is ill suited for its task.
It says how many iterations an algorithm has in the worst case.
to search for an item in an list, you can traverse the list until you got the item. In the worst case, the item is in the last place.
Lets say there are n items in the list. In the worst case you take n iterations. In the Big O notiation it is O(n).
It says factualy how efficient an algorithm is.