With a quick search over stackoverflow was not able to find anything so here is my question.
I am trying to write down the testing strategy for a application where two applications sync with each other every day to keep a huge amount of data in sync.
As its a huge amount of data I don't really want to cross check everything. But just want to do a random check every time a data sync happens. What should be the strategy here for such system?
I am thinking of this 2 approach.
1) Get a count of all data and cross check both are same
2) Choose a random 5 data entry and verify that their proprty are in sync.
Any suggestion would be great.

What you need is known as Risk Management, in Software Testing it is called Software Risk Management.
It seems your question is not about "how to test" what you are about to test but how to describe what you do and why you do that (based on the question I assume you need this explanation for yourself too...).
Adding SRM to your Test Strategy should describe:
The risks of not fully testing all and every data in the mirrored system
A table scaling down SRM vs amount of data tested (ie probability of error if only n% of data tested versus -e.g.- 2n% tested), in other words saying -e.g.!- 5% of lost data/invalid data/data corrupption/etc if x% of data was tested with a k minute/hour execution time
Based on previous point, a break down of resources used for the different options (e.g. HW load% for n hours, manhours used is y, costs of HW/SW/HR use are z USD)
Probability -and cost- of errors/issues with automation code (ie data comparison goes wrong and results in false positive or false negative, giving an overhead to DBA, dev and/or testing)
What happens if SRM option taken (!!e.g.!! 10% of data tested giving 3% of data corruption/loss risk and 0.75% overhead risk -false positive/negative results-) results in actual failure, ie reference to Business Continuity and effects of data, integrity, etc loss
Everything else comes to your mind and you feel it applies to your *current issue* in your *current system* with your *actual preferences*.

Related

What is the most conclusive way to evaluate an n-way split test where n > 2?

I have plenty of experience designing, running and evaluating two-way split tests (A/B Tests). Those are by far the most common in digital marketing, where I do most of my work.
However, I'm wondering if anything about the methodology needs to change when more variants are introduced into an experiment (creating, say, a 3-way test (A/B/C Test)).
My instinct tells me I should just run n-1 evaluations against the control group.
If I run a 3-way split test, for example, instinct says I should find significance and power twice:
Treatment A vs Control
Treatment B vs Control
So, in that case, I'm finding out which, if any, treatment performed better than the control (1-tailed test, alt: treatment - control > 0, the basic marketing hypothesis).
But, I'm doubting my instinct. It's occurred to me that running a third test contrasting Treatment A with Treatment B could yield confusing results.
For example, what if there's not enough evidence to reject a null that treatment B = treatment A?
That would lead to a goofy conclusion like this:
Treatment A = Control
Treatment B > Control
Treatment B = Treatment A
If treatments A and B are likely only different due to random chance, how could only one of them outperform the control?
And that's making me wonder if there's a more statistically sound way to evaluate split tests with more than one treatment variable. Is there?
Your instincts are correct, and you can feel less goofy by rewording your statements:
We could find no statistically significant difference between Treatment A and Control.
Treatment B is significantly better than Control.
However it remains inconclusive whether Treatment B is better than Treatment A.
This would be enough to declare Treatment B a winner, with the possible followup of retesting A vs B. But depending on your specific situation, you may have a business need to actually make sure Treatment B is better than Treatment A before moving forward and you can make no such decision with your data. You must gather more data and/or restart a new test.
What I've found is a far more common scenario is Treatment A and Treatment B both soundly beat control (as they're often closely related and have related hypotheses), but there is no statistically significant difference between Treatment A or Treatment B. This is an interesting scenario where if you are required to pick a winner, it's okay throwing significance out the window and picking the one that has the strongest effect. The reason why is that the significance level (eg. 95%) is set to avoid false positives and making unnecessary changes. There's an assumption that there are switching costs. In this case, you must pick A or B and throw out control, so in my opinion it's okay picking the best one until you have more data.

Can AMPL handle this recursively or is a remodeling neccessary?

I'm using AMPL to model a production where I have two particular constraints that I am not very sure how to handle.
subject to Constraint1 {t in T}:
prod[t] = sum{i in I} x[i,t]*u[i] + Recycle[f]*RecycledU[f];
subject to Constraint2 {t in T}:
Solditems[t]+Recycle[t]=prod[t];
EDIT: where x[i,t] is the amount of products from supply point i. u[i] denotes the "exchange rate" of the raw material from supply point i to create the product. I.E. a percentage of the raw material will become the finished products, whereas some raw material will go to waste. The same is true for RecycledU[f] where f is in F, which denotes the refinement station where it has been refined. The difference is that RecycledU[f] has a much lower percentage that will go to waste due to Recycled already being a finished product from f (albeitly a much less profitable one). I.e. Recycle has already "went through" the process of being a raw material earlier, x, but has become a finished product in some earlier stage, or hopefully (if it can be modelled) in the same time period as this. In the actual models things as "products" and "refinement station" is existent as well, but I figured for this question those could be abandoned to keep it more simple.
What I want to accomplish is that the amount of products produced is the sum of all items sold in time period t and the amount of products recycled in time period t (by recycled I mean that the finished product is kept at the production site for further refinement in some timestep g, g>t).
Is it possible to write two equal signs for prod[t] like I have done? Also, how to handle Recycle[t]? Can AMPL "understand" that since these are represented at the same time step, that AMPL must handle the constraints recursively, i.e. compute a solution for Recycle[t] and subsequently try to improve that solution in every timestep?
EDIT: The time periods are expressed in years which is why I want to avoid having an expression with Recycle[t-1].
EDIT2: prod and x are parameters and Recycle and Solditems are variables.
Hope anyone can shed some light into this!
Cenderze
The two constraints will be considered simultaneously (unless you explicitly exclude one from the problem). AMPL or optimization solvers don't have the notion of time steps and the complete problem is considered at the same time, so you might need to add some linking constraints between time periods yourself to model time periods. In particular, you might need to make sure that the inventory (such as the amount finished product is kept at the production site for further refinement) is carried over from one period to another, something like:
Recycle[t + 1] = Recycle[t] - RecycleDecrease + RecycleIncrease;
You have to figure out the expressions for the amounts by which Recycle is increased (RecycleIncrease) and decreased (RecycleDecrease).
Also if you want some kind of an iterative procedure with one constraint considered at a time instead, then you should use AMPL script.

Neural Network Input and Output Data formatting

and thanks for reading my thread.
I have read some of the previous posts on formatting/normalising input data for a Neural Network, but cannot find something that addresses my queries specifically. I apologise for the long post.
I am attempting to build a radial basis function network for analysing horse racing data. I realise that this has been done before, but the data that I have is "special" and I have a keen interest in racing/sportsbetting/programming so would like to give it a shot!
Whilst I think I understand the principles for the RBFN itself, I am having some trouble understanding the normalisation/formatting/scaling of the input data so that it is presented in a "sensible manner" for the network, and I am not sure how I should formulate the output target values.
For example, in my data I look at the "Class change", which compares the class of race that the horse is running in now compared to the race before, and can have a value between -5 and +5. I expect that I need to rescale these to between -1 and +1 (right?!), but I have noticed that many more runners have a class change of 1, 0 or -1 than any other value, so I am worried about "over-representation". It is not possible to gather more data for the higher/lower class changes because thats just 'the way the data comes'. Would it be best to use the data as-is after scaling, or should I trim extreme values, or something else?
Similarly, there are "continuous" inputs - like the "Days Since Last Run". It can have a value between 1 and about 1000, but values in the range of 10-40 vastly dominate. I was going to scale these values to be between 0 and 1, but even if I trim the most extreme values before scaling, I am still going to have a huge representation of a certain range - is this going to cause me an issue? How are problems like this usually dealt with?
Finally, I am having trouble understanding how to present the "target" values for training to the network. My existing results data has the "win/lose" (0 or 1?) and the odds at which the runner won or lost. If I just use the "win/lose", it treats all wins and loses the same when really they're not - I would be quite happy with a network that ignored all the small winners but was highly profitable from picking 10-1 shots. Similarly, a network could be forgiven for "losing" on a 20-1 shot but losing a bet at 2/5 would be a bad loss. I considered making the results (+1 * odds) for a winner and (-1 / odds) for a loser to capture the issue above, but this will mean that my results are not a continuous function as there will be a "discontinuity" between short price winners and short price losers.
Should I have two outputs to cover this - one for bet/no bet, and another for "stake"?
I am sorry for the flood of questions and the long post, but this would really help me set off on the right track.
Thank you for any help anyone can offer me!
Kind regards,
Paul
The documentation that came with your RBFN is a good starting point to answer some of these questions.
Trimming data aka "clamping" or "winsorizing" is something I use for similar data. For example "days since last run" for a horse could be anything from just one day to several years but tends to centre in the region of 20 to 30 days. Some experts use a figure of say 63 days to indicate a "spell" so you could have an indicator variable like "> 63 =1 else 0" for example. One clue is to look at outliers say the upper or lower 5% of any variable and clamp these.
If you use odds/dividends anywhere make sure you use the probabilities ie 1/(odds+1) and a useful idea is to normalize these to 100%.
The odds or parimutual prices tend to swamp other predictors so one technique is to develop separate models, one for the market variables (the market model) and another for the non-market variables (often called the "fundamental" model).

Robust Measures of Algorithmic Trading - Based on Robert Pardo's Book

I am optimizing algorithmic strategies. In the process of choosing from a pool of many optimized strategies, I am in the phase of searching (evaluating) for robustness of the strategy.
Following the guidelines of Dr. Pardo's book "The Evaluation of Trading Strategies" in page 231 Dr. Pardo recomends, in the Numeral 3 to apply the following ratio to the optimized data:
" 3. The ratio of the total profit of all profitable simulations divided by the
total profit of all simulationsis significantly positive"
The Question: from the optimization results, I am not being able to properly understand what does Mr. Pardo means by stating "...all simulationsis significantly positive"; what does Mr. Pardo means by 'significantly positive?
a.) with 95% confidence level?
b.) with a certain p value?
c.) the relation of the average net profit of each simulation minus it' standard deviation
Even though the sentence might seem 'simple' I would REALLY like to understand what Mr. Pardo means by the statement and HOW to calculate it, in order to filter the most robust algorithmic strategies.
The aim of analyzing the optimization profile of an algorithmic simulation is to be able to filter robust strategies.
Therefore the ratio should help us to uncover if the simulation results are on the right track or not.
So, we would like to impose some 'penalties' to our results, so we can select the robust cases from those of doubtful (not robust) result.
I came to the following penalizing measures (found in the book of Mr. Pardo and other sources).
a.) we can use a market return (yearly value) as a benchmark, so all the simulations whose result are below such level, can be excluded from our analysis,
b.) some other benchmark to divide those 'robust' results from those more 'doubtful' (for example, deducing to each result one standard deviation)
From (a) and (b), we can create the ratio:
the total sum of all profitable simulations divided by the profitable results considered robust
The ratio should be greater or equal than 1.
If the ratio is equal to 1 then it means that our simulation result has given interesting results (we are analyzing the positive values in this ratio, but profitable results should always be compared to the negative results also).
If the ratio is greater from 1, then we have not reach the possible scenario, and the result should be compared with the other tests for optimizations.
While simulating trading algorithms, no result is absolute but partial and it's value is taken in relationship to what we expect from the algorithm.
If someone has a better explanation or idea or concept you might find interesting please share, I would gladly read it.
Best regards to all.
Remark on the subject
With all due respect to the subject ( published in 2008 ) the term robustness has its own meaning if-and-only-if the statement also clarifies in which particular respect is the robustness measured and against what phenomena is it to be exposed & tested the Model-under-review's response ( against what perturbances -- type and scale -- shall the Model-under-test hold its robust behaviour, measures of which were both defined and quantified a-priori the test ).
In any case, where such context of the robustness is not defined, the material, be it printed by any bold name, sounds -- and forgive me to speak in plain English -- just like a PR-story, an over-hyped e-zine headline or like a paid advertorial.
Serious quantitative model evaluations, the more if one strives to perform an optimisation ( with respect to some defined quantitative goal ), requires a more thorough insight into the subject than to axiomatically post a trivial "must-have" imperative of
large-average && small-HiLo-range && small StDev.
Any serious Quant-Modelling effort, if it were not to just spoil the consumed hundreds-of-thousands CPU core hours of deep parametric-spaces' scans, shall incorporate a serious parametrisation decision in either dimension of the main TruTrading Strategy sub-spaces --
{ aSelectPOLICY, aDetectPOLICY, anActPOLICY, anAllocatePOLICY, aTerminatePOLICY }
A failure to do so, either cripples the model or leads to a blind-belief, where it is hard to guess, whether the former or the latter is a greater of the both Quant-sins.
Remark on the cited hypothesis
The book states, without any effort to proof the construction, that:
The more robust trading strategywill have an optimization proļ¬le with a: 1. Largeaverageproļ¬t 2. Small maximum-minimumrange3. Small standarddeviation
Is it correct?
Now kindly spend a few moments and review this 4D-animated view of a Model-under-test ( visualisation of which is reduced into just four dimensions for easier visual perception ), where none of the above stands true.
<aMouseRightCLICK>.openPictureOnAnotherTab to see full HiRes picture details
Based on contemporary state-of-art adaptive money-management practice, that fails to be correct, be it due to a poor parametrisation ( thus artificially leading the model into a rather "flat-profits" sub-space of aParamSetVectorSPACE )
or due to a principal mis-concept or a poor practice ( including the lack thereof ) of the implementation of the most powerful profit-booster ever -- the very money-management model sub-space.
Item 1 becomes insignificant at all.
Item 2 works right on the contrary to the stated postulate.
Item 3 cannot yield anything but the opposite due to 1 & 2 above.

Rough estimate of test cases

I'm curious how many test cases others have for a site similar to mine. It's your basic CRUD with business workflow website. 3 user roles, a couple input pages, a couple search pages, a business rule engine, etc. Maybe 50k lines of .NET code (workflow and persistence altogether). DB with about 10 main tables plus about 100 supporting tables (lookups, logs, etc.). The main UI for entering data is quite big, around 100 data fields, multiple grids, about 5 action/submit type buttons.
I know this is vague and I'm only hoping for order of magnitude figures. I'm also thinking of basic test cases, not code coverage type cases. But like if I told you we had 25 test cases I'm sure you'd say way WAY not enough. So I'm just looking for ballpark figures.
TIA
I would have as many test cases as it takes to ensure a high level of confidence in the system.
The number of tables, rules, lines of code, etc is actually immaterial.
You should have the appropriate unit tests to ensure your domain objects and business rules are firing correctly. You should have tests to ensure your queries execute appropriately (this is a harder one).
You might even want to have test cases for paths through the software. In other words, click here, get this page, click there, edit a field, save the page, go back... This type is the most difficult as the tests are usually recorded and have to be rerecorded when the pages change (ie: a field is added or removed).
Generally speaking it's more about coverage than number of tests. You want your tests to cover as much of the applications funcionality as is feasible. Note that I didn't say possible. You can cover an entire application (100%) with test cases, but for every little change, bug fix, etc you'll have to recode those tests. This is more desired for a mature app. For newer apps you don't want to hamstring your developers and QA team that way as they'll spend inordinate amounts of time fixing/changing unit tests...
For any system, you could easily spend as much time developing your automated tests as you do the system itself. In some cases, even more.
As for our group, we tend to have lots of unit tests. However, for testing paths through the system we only record those once a particular area has moved into a "maintenance" type of mode. Meaning we expect little change for quite a while in that area and the path test is simply to ensure no one jacked it up.
UPDATE: the comments here led me to the following:
Going a little further: Let's examine 1 small piece of code:
Int32 AddNumbers(Int32 a, Int32 b) {
return a+b;
}
On the face of it you could get away with a single test:
Int32 result = AddNumbers(1,2);
Assert.Equals(result, 3);
However, that probably isn't enough. What happens if you do this:
Int32 result = AddNumbers(Int32.MaxValue, 1);
Assert.Equals(result, (Int32.MaxValue+1));
Now we have a failure. Here's another one:
Int32 result = AddNumbers(Int32.MinValue, -1);
Assert.Equals(result, (Int32.MinValue-1));
So, we have an extremely simple method that requires at least 3 tests. The initial to see if it can give any result, then 2 for bounds checking. That's 3 tests for essentially 2 lines of code (method definition and the one line computation).
As your code becomes more complex, things get really dicey:
Decimal DivideThis(Decimal a, Decimal b) {
result = Decimal.Divide(a,b);
}
This slight change introduces yet another exception condition beyond bounds: DivideByZero. So now we are up to 4 tests required for 2 lines of code.
Now, let's simplify it a bit:
String AppendData(String data, String toAppend) {
return String.Format("{0}{1}", data, toAppend);
}
Our test case here is:
String result = AppendData("Hello", "World");
Assert.Equals(result, "HelloWorld");
That's just one test case for the code block, with no others really needed.
What does this tell us: For starters 2 lines of code might cause us to need between 1 and 4 test cases. You mentioned 50k lines... Using that logic, you will need between 50,000 and 200,000 test cases...
Of course, life is rarely so simple. In those 50k lines of code you have, there are going to be large blocks of code that have very limited inputs. For example a mortgage interest calculator might take 3 parameters, and return 1 value (the APR). The code itself might run 100 lines or so (been awhile, just work with me). The number of test cases for this is going to be determined by edge cases along the lines of making sure you properly handle rounding.
So, let's say it's 5 cases: which brings us to 20 lines of code = 1 case. Calculating that out your 50k lines might result in 2,500 test cases. Obviously much smaller than what we expected above.
Finally, I'm going to throw another wrinkle into the mix. Some test systems can handle inputs and your assertions coming from a data file. Considering our first one we could have a data file that has a line for each parameter combination we want to test. In this scenario, we only need 1 test case to cover 3 (or more..) possible conditions.
The test case might look like (pseudo code):
read input file.
parse expected result, parameter 1, parameter 2
run method
assert method result = parsed result
repeat for each line of the file
With that capability, we are down to 1 test case per scenario. I would say 1 per method, but the reality is that most methods are rarely standalone and it's entirely possible that numerous methods are implicitly tested through explicit testing of others; therefore not requiring their own individual tests.
This leads me to this: It is impossible to determine the right number of test cases without a full understanding of your code base. 5 cases that are at the UI level might be enough for complete coverage depending on the complexity of the tests; or it might take thousands. Therefore it's much better to base it on code coverage. What percentage of the code, and branching logic, are you testing?
If you ask a car salesman for a rough price of a car and he would give me that price, I wouldn't buy my car there, because he forgot to ask me some important questions. What kind of car do you want? Which extras do you want on the car? etc.
Same for number of test cases .... If a hiring manager would ask me that question I would probably give him the following answer.
#test cases = between #Requirements*2 and #Requirements*infinite (some requirements can lead to bollions of possibilities)
I also would say that based on my experience the number would realistically be #Requirements*5 (is the number I use at the initial phase, for projects with new, changed and omitted functionality)
where the following error margin has to be taken depending on the phase I am making this estimate:
Initiation phase : error margins = 400%
...
Testing phase : error margin = 10%
By the time you start the testing phase, detailed requirements/specs are available, volatillity of requirements is stabilized, creep of requirements is almost zero, etc.
At that time I also will be able to give better estimates ...