I have a couple of scenarios
Scheduler should compare the current day is with in the last 10 business days of the current month then it should schedule to run current day with 11AM CST.
(E-g) current day : 18th July 2017 (with in last 10 business days) should run and reschedule at 19th July 2017 11.AM CST
IF Last business day(30th or 31st) after runs the scheduler should reschedule it to next month.
(E-g )current day : 31th July 2017 (with in last 10 business days) should run and reschedule at 18th Aug2017 11.AM CST
Can any one help to derive the logic in oracle 11g scheduler?
Thanks in Advance.
Related
I am working on a MODE Case Study which can be accessed here https://mode.com/sql-tutorial/a-drop-in-user-engagement/#the-problem.
I am trying to access Table 2: Events which has a date column 'occurred_at'. I wanted to check the time frame of this case study, that is weeks and months.
I wrote a simple query
select distinct(date_trunc('week', occurred_at)) as week, date_trunc('month', occurred_at) as month
from tutorial.yammer_events
where event_type = 'engagement'
order by week;
and to my surprise, the first week of '2014-04-28' showed the month 'May' instead of 'April.
Can someone please tell me what is the reason for this?
Thank you
The PostgreSQL date_trunc rolls up the date to the first instance of the date depending upon the granularity (day, week, month, etc.)
For month this instance is the first day of month i.e. Day 1.
For week this instance is the first day of week i.e. Monday.
Suppose the date is 4th July 2021 which is Sunday, then the date_trunc will result in 1st July 2021 for month and 28th June 2021 for week which is Monday inside that week.
Suppose the date is 5th July 2021 which is Monday itself, then the date_trunc will still result in 1st July 2021 for month but result in 5th July 2021 for week since it is already Monday.
I am new to snowflake and my manager wants me to retrieve the data of the past month when it is 5th of the current month. For example if today is 5th April, then ask snowflake to retrieve the data of the past month i.e. from 1st March 2021 to 31st March 2021 and similar for all the other months.
The reason why he wants to update the last month data on 5th of every next month because that is the day when we get the data.
I tried to use the DATEADD function but it is more complicated than just using this function.
Thanks in advance!
PS: The data for every month has same date. for example: the date is like - April 20th will be stored in the database as "2021-4-01" - and same for April 25th date will be stored as "2021-4-01" .
The day doesn't change in the database, just the month and year.
as to the prior month window that can be done via DATE_TRUNC and DATEADD
select
current_date as cd
,date_trunc('month', cd) as end_range
,dateadd('month', -1, end_range) as start_range
;
gives:
CD END_RANGE START_RANGE
2021-04-21 2021-04-01 2021-03-01
the other half of the question only do it on the 5th, if you have a task run daily etc. can be solved via
,day(current_date) = 5 as is_the_fifth
or if in an inline way
iff(day(current_date) = 5, <do true stuff>, <do false stuff>)
I use SQL Server 2017. I need to schedule a job to run at 12am and 12pm for each days between 7th and 27th of each months. In the other word, i need to run my job two times per day between two date in each month.
Can i do that in one schedule task or I have to create a two jobs for each exact day?
12 am 7th month
12 pm 7th month
and so on and so on.
If i have to create a job for each hover of each day i will have several schedule.
Update 1: I did it by creating several steps in schedule tab but i am looking to do that in less steps.
Update 2:
If i can create two steps like below it will good for me.
1 : Occurs every month between 7th and 27th at 12 am
2 : Occurs every month between 7th and 27th at 12 pm
One way to do that is to check if the date is in between 7th and 27th using DATENAME or DATEPART.
--IF (DATENAME(DAY, GETDATE()) >= 7 AND DATENAME(DAY, GETDATE()) <= 27)
IF DATEPART(DD, GETDATE()) BETWEEN 7 AND 27
BEGIN
EXEC [Your Stored Procedure]
END
And then set the Daily frequency to start at 12:00 AM and Occurs every 12 hours.
Using NetSuite, I am trying to automate the creation of monthly tasks. These tasks will fall on the last day of the month, a day before, and 1,2,3,4,5 days after the last day of the month. But, the tasks can't be due on a weekend, only business days. So if the day falls on a sat or sun the dates have to move up. How can I use my custom record to calculate the next months task dates skipping weekends? Here is a screenshot of the record - see that 10/4 and 10/5 fall on saturday and sunday, how can I have it skip sat and sunday? I used the sql function option to generate the dates and days of the week.
I tested the following formula. Replace custbody_date with your field name. This formula should be set in your 'next month' column.
CASE WHEN INSTR(to_char({custbody_date}, 'DAY'),'SATURDAY') != 0
THEN {custbody_date}+2
WHEN INSTR(to_char({custbody_date}, 'DAY'),'SUNDAY') != 0
THEN {custbody_date}+1 ELSE {custbody_date}
END
This should also give you an idea to set the value for 'Next Month Day' (skipping saturday and sunday).
I have two current SQL queries that I currently use to compare GM% from previous year vs. GM% this year. This is a daily report that I run every morning. The date arithmetic is not very solid and I am trying to find an alternative. Previously I thought that the report would only be for Monday forward, and not including the current day (ie if ran on Tuesday, it would only pull Monday. If ran on Monday it would not pull anything.) Recently that has changed to where when the report is ran on Monday, they want to see Friday-Sunday. What I am considering is setting it to pull the previous 5 day, not including the current day. (Ran on Monday would pull Thur, Fri, Sat, Sun.) The problem is that it has to be a day this year vs same day last year comparison. Anyone who;s tried this knows that it is not easy to get this. Here is my current code for the date arithmetic. I am at a loss guys, I could use some help.
Where DB1.TB1.CLM1>=Current Date-364 days - (DAYOFWEEK(CURRENT DATE) - 2) DAYS
And DB1.TB1.CLM1< Current Date- 364 days
If I hear you right, on Tuesday you would pull stats for Monday. Wed, you pull stats for Mon-Tues. Friday, you pull Mon-Thurs. And for all of these, you need the equivalent day prior year.
The trick is that now on Monday, you need to pull the previous weekend, i.e. Thu-Sun.
You have not defined what to do on Sunday, so I'm leaving that case out.
Try this WHERE statement:
where
( -- do this after Monday
dayofweek(current date) > 2 and
DB1.TB1.CLM1 between ((current date - 364 days) - (dayofweek(current date) - 2) days) and (current_date - 365 days)
)
or
( -- do this on Monday
dayofweek(current date) = 2 and
DB1.TB1.CLM1 between (current date - 368 days) and (current date - 365 days)
)